M. Bonesini - MICE Inst Meeting 10-05-071 M. Bonesini INFN Milano TOF installation plans.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Technical Coordinator’s Report (KL for PD) Solenoid problems & Schedule Actions on –KL/CN: plan for work to December shutdown –KL/CN: plan for work in.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
M. Bonesini1 TOF design updates M. Bonesini – INFN Milano.
Detector Systems Update MICO April 23, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the.
M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning.
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
Detector Systems Update MICO April 14, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u H6533MOD PMT assembly reliability is the main concern.
M. Bonesini - MICE CM19 RAL 07/10/071 M. Bonesini INFN Milano PMTs tests in Milano (M. Bonesini, M. Rayner, S. Terzo)
M. Bonesini - 08/06/06 Fermilab1 M. Bonesini INFN Milano MICE TOFes construction & planning.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Detector Systems Update MICO April 7, MICE Detector Systems  CKOV u Installed, first signals seen  TOF0/1 u 8 new H6533MOD assembly PMTs have.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Start Counter Construction Update Eric Pooser 08/21/2014.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
MICE VC 12/2/20091 [23/1-19/2] MOM report Hogdson Apollonio Zisman 23/1/09 12/2/09 19/2/09 Relevant Issues: - NO target since december accident  no data.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
MUSE NSF Review March 24, MUSE Project Management Ronald Ransome Rutgers The State University of New Jersey For the MUSE Collaboration.
10/month is the present production rate 2 FTE + sporadic contributions
F.Guber, A.Ivashkin INR, Moscow
UK CMS Oversight Committee Mtg
East Hall under construction
Presentation transcript:

M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans

M. Bonesini - MICE Inst Meeting Hot issue: detector construction in house material procurement: up to now no big delays All PMTs ordered Scintillator ordered Electronics ordered ( status of stretcher/splitter ?) Counter assembly: mount & calibrate detectors with cosmics here delay may arise 3 months (April-June) to do this Detector plane assembly: you need to assemble X/Y planes in a rigid structure 1-2 months (July-August) to do this From CM17

M. Bonesini - MICE Inst Meeting Detector construction budget constraints (0 $ up to now) have began to show up (I expect by June/July) lightguides ordered/built 70%; but glueing in external firm has just started estimated delay ~ 1 month up to now August 15 RAL TOF0/1 delivery unrealistic (many orders still to be placed, …) seem more realistic a schedule // to KL: September/beg October 2007

M. Bonesini - MICE Inst Meeting Requests for delivery/installation detailed map of MICE Hall to foresee installation, cables length etc (requested many times, never got) for setup: it will be done together with KL, we plan to have a joint mechanics/electronics team from Italy, but some general help may be useful (access to RAL mech workshop, availability of instruments: scopes, …)

M. Bonesini - MICE Inst Meeting Installation plan June/July (?) full survey at RAL with mechanics engineer transport to RAL: heavy stuff (cables) shipped, detectors + electronics ( Kg) transport by car date X delivery to RAL (full assembled TOF0/1 detectors or tested counters with PMTs to be arranged at RAL into TOF0/1 detectors) 2 weeks mechanics inst (detector planes+ support) + cabling for TOF0/1 with KL (TOF:Mi+PV 2 physicists, 1-2 mech. technicians, Sofia …) 1-2 weeks … TOF0/1 electronics debug (with beam or cosmics) (TOF: Mi+PV 1-2 physicists, 2 electronic technicians, Sofia …) NOT FULLY WORKED OUT