Calorimeter Status Pascal Perret LPC Clermont 22 March 2011.

Slides:



Advertisements
Similar presentations
ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
Advertisements

Calo Calibration meeting 10/19/2010 Tools & software O. Deschamps (LPC)
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
SPD spill-over and the subtractor Míriam Calvo 23 June 2010.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
CALO News Pascal Perret LPC Clermont 26 November 2014.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Kali Calo progress report Dasha Savrina (ITEP/Moscow), Vanya Belyaev.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
M.N Minard Calorimeter Calibration scheme Calorimeter calibration procedure.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LHCb Calorimeter Meeting – 2 nd December 2015 Calorimeter upgrade update Universitat de Barcelona, Institut de Ciències del Cosmos ICC-UB Laboratoirede.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Calorimeter and its Upgrade Pascal Perret LPC Clermont 8 December 2015 OUTLINE  Detector status  Calibration  Upgrade.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
Calo Calibration meeting 08 september 2009 Calorimeter Olivier Deschamps LPC Clermont-Fd Software Status&News.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
June 30th 2008Jacques Lefrancois1 CW base studies Last week June 24th at calo meeting : news that preliminary test done by Yuri Gilitski indicated that.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
CALO News Pascal Perret LPC Clermont 23 October 2011.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
CALO News Pascal Perret LPC Clermont 22 January 2012.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Preparation of LHCb for data taking
Calorimeter Upgrade Meeting - News
Calorimeter Software Status & News Software week – 17/06/2009
Presentation transcript:

Calorimeter Status Pascal Perret LPC Clermont 22 March 2011

2 Xmas break activities  A lot … SPD Resoldering of a wires on a VFE signal cable connector PS Change of a FEE board ECAL: Change of FEE boards, PMT, integrator boards HCAL Change of FEE boards, PMT TELL1 Addition of 2 TELL1 for ECAL & PS/SPD  Some unexpected: HCAL incident … cf TB report on Thursday Many thanks to the CERN teams: LHCb, Transport, Vacuum, Survey, … Pascal Perret - LPC Clermont 22/03/2011

3 Integrator boards Pascal Perret - LPC Clermont 22/03/2011 NB requires slight modification of CW bases: install 100 nF in series with 25 Ω. This does not affect the signal. Recently, the integrators were upgraded: the 40 mezzanines were replaced with new ones. The work on production and installation of new integrator boards, including modification of host CW bases, was performed in December 2010 – January 2011 (Irina, Pavel, Anatoly Zh.). The nominal sensitivity is 275 mV/μA (110 counts/μA). Measured at the lab before installation in 20 out of 40 boards (Pavel): ±2% deviation. When installed onto CWs, its sensitivity becomes 100 counts/μA because of the 100kΩ “safety” resistor at the CW base. The anode current in ECAL is measured in 40 PMTs out of 6016, through “integrators”, 1-channel mezzanine boards installed at the back of each of these 40 PMT/CWs (original design by Yu. Gilitsky). Each integrator contains an amplifier for measuring current and pass-through for fast signal and LV/MV. The readout is performed via SPECS DCU of regular CALO DAC/HV motherboards. Part of ECAL HV projects. New version (install a 100 nF blocking capacitor in the fast signal line): uses ~90% of the anode current, instead of ~1% sensitivity ~ 100 DCU counts/μA DC gain ~2.2 instead of 3000  no stability problems with TL072 (rad hard) Yu. Guz I, nA

4 Detector status  Good starting point! Pascal Perret - LPC Clermont 22/03/2011  SPD: Keep the 0.5 MIP recipe as the default for 2011 Same threshold conditions as last year for most of thecells, only significant changes in few outliers (0.7 MIPs in 6 cells) Can easily move to any other value if required by L0 e/  studies.  PS: 1 MIP = 10 ADC count instead of 15 ADC count Values of HV have been tuned in order to equalize all channels To be checked with first data 7

5 ECAL/HCAL PM dark current  All HCAL channels are equipped with « integrator » boards: Dark current measures can be done for HCAL To be followed (ok if < 1µA) Pascal Perret - LPC Clermont 22/03/ Feb  12-Mar obviously increasing

6 Online monitoring  Few improvements have been (or are being) implemented: Automated analyses: Pedestal following, LED signal & gain monitoring Reference samples out data are used to tune the thresholds that trigger alarms in the automated analysis. They’re also used to create new alarms based on collision data. Pascal Perret - LPC Clermont 22/03/2011 Monitoring of the  0 mass being also added to the automated analysis: mass histo available every ten minutes Fit a gaussian + a polynomial (order 3) Fill Trending histograms Only looked at resolved  0 so far. 60min, run  ~1.27, TCK 0x S/B=0.19 =139.4  0.3  =10.4  0.4 New plots in the DM page & new alarms on his screen Occupancy measurements: they can be used to spot dead/hot channels, frozen FEB, etc… Data will be used to determine the thresholds that will trigger “WARNING/ALARM/FATAL” messages on the shifters screen.

7 New LED flashing mode  Addition of an extra 11 kHz of periodic triggers for ECAL & HCAL LED flashing This would reduce appreciably the gain variation of the PMT as function of luminosity Commissioned thanks to Richard Data were taken with additional LED flashing of 11, 5.5 and 0 kHz: Rate effect up to +18% occurs. The rate effect at 5.5 kHz is already close to “saturation”. No special stability problems found in the 3.5 hour long run with 11 kHz flashing. New LED reference samples for calibration have been built Pascal Perret - LPC Clermont 22/03/2011 Rate effect HCAL

8 Calibration  Different method are used consecutively in order to reach the best performances for ECAL: Step 1: LED data to have a first calibration and to follow PMT gain changes Step 2: smoothing of the energy flow: cell inter-calibration Effect of trigger negligible : < 0.5% absolute effect on inter calibration Effect of pile-up negligible : < 0.5% absolute effect on inter calibration Step 3: Fine calibration with  0 Dead cells and border cells are removed Large amount of data needed: production of fmDST To be independent of the Stripping rates and to have an access to all the data collected during 2010: a dedicated production task has to be created. We're ready for production → production team Step 4: smoothing of the energy flow to allow to recover border cells and surroundings of dead cells We should reach an ECAL calibration at ~1.5% Pascal Perret - LPC Clermont 22/03/2011

9 Pile-up subtraction Observation on 2010 data : e/p and m(  0 ) significantly increases with nPV pile-up effect measured as +(0.68±0.07) MeV/c 2 per PV above 1 on m(  0 ) was decided to subtract per bin on SpdMult (to be independent of trigger GEC) not trivial to define the pile-up energy : several unsuccessful attempts … Olivier found a working method: for cluster at (x,y) look at 3x3 energy at the mirror position (-x,-y) if E mirror < E cluster /2 it is a valid ‘pile-up’ energy for that cluster Average E mirror per bin of SpdMult → /bin = (bin i+1) - (bin i) More at: Pascal Perret - LPC Clermont converted to (floating ADC) up to ~4-5 ADC per 50 Spd in the inner-bending plane

10 Pile-up subtraction Performance on reconstructed  0 mass check on fill 1427 & 1375 (October 2010 – nu > 2) Pascal Perret - LPC Clermont 22/03/2011 Pile-up correction implemented in software =0.88 ADC per bin of 50 SpdMult above 200 for 3x3 area No longer dependency with nPV (  0 →  unconverted only) #PV After CorrectionBefore correction μ (MeV/c 2 )σ (MeV/c 2 )μ (MeV/c 2 )σ (MeV/c 2 ) #PV= ± ± ± ± 0.13 #PV= ± ± ± ± 0.16 #PV= ± ± ± ± 0.23 #PV= ± ± ± ± 0.44 #PV= ± ± ± ± 1.4 #PV= ± ± 1.31 ALL PVs ± ± ± ± 0.09 Maybe slight negative gradient on mass after correction (-0.08±0.04)MeV/c2 Note: the resolution is σ = 7.1 MeV/c 2 for early data (nu << 1, april-june) Note : before/after correction does not correspond to same condDB (Ecorrection/Calibration) So absolute mass and sigma is not directly comparable (‘after correction’ is better tuned)

11 Reconstruction tuning for MC10  Purpose : extract reconstruction parameters from MC10 data in the same way it has been done for data : few months needed for data, hopefully a couple of weeks for MC  Tuning not yet completed just preliminary/intermediate results shown today S-corrections and alignment : initial MC parameters obtained from DC04/DC06 sample using MC-truth info Pascal Perret - LPC Clermont 22/03/2011 b parameter OUTERMIDDLEINNER old MC MC Data S-shape main parameter : MC10 Inner Ecal Cluster Y Track Y Fit : y c = b asinh[y b /0.5 cosh(0.5/b)]+Δy Data parameters was 20-30% higher than (old) MC now: 5-7% larger than MC10

12 SPD Alignment  The SPD alignment wrt trackers has been measured for 2010 data X coordinate: seem to be rotated around Z-axis ( / \ shape ) Rotation C-side: (0,0,-0.028º) Rotation A-side: (0,0,0.041º) Global vertical displacement equivalent for all SM (~-7mm) To be checked Pascal Perret - LPC Clermont 22/03/2011  Try to implement corrections in the condDB Rotation not foreseen …  And to re-align detectors during a long shut-down … X coordinate

13 SPD vs M1 multiplicity  From Giovanni Passaleva, 17 January 2011: M1 hits ~ 1/2 SPD hits Pascal Perret - LPC Clermont 22/03/2011  Miriam had a look: M1 hits ~ 1.1 SPD hits (October 2010 data (BHadron stream)) Same relation in MC than in data: MC10 (bb-bar evts) To be checked!

14 First look at 2011 data  SPD: Occupancy with first 2011 data looks more homogeneous  PS: The MIP is consistently around ADC counts for all boards. Reminder: 10 ADC counts is the value of the most probable value of the Landau function. The new calibration set in the electronics seems basically correct at that stage. Fine analysis with tracks is required for a more detailed analysis / per channel. Timing: Relative alignment of VFE within σ =0.5 ns ! alignment better than ±2 ns. Some ~ 1 ns crate effects? Pascal Perret - LPC Clermont 22/03/2011

15 First look at 2011 data  ECAL Pascal Perret - LPC Clermont 22/03/2011

16 Summary  Calorimeter detectors are in a good shape Few access needed during the next technical stop: Annual control of the HCAL Cs source Repair of HCAL turbine C-side (control board) Fix minor problems, …  First look at 2011 data encouraging: Time alignment ok, …  Priority with first 2011 data Check gains Check spill over corrections for PS (needed with 75ns BC) Calibration Re-measure ECAL and PS, SPD (mis)alignment Pascal Perret - LPC Clermont 22/03/2011

17 Summary  Software: A lot of new corrections have been computed and implemented: Energy correction, S-correction, L-correction, Alignment, … Pile-up correction implemented in software No longer dependency with nPV Energy double counting in pi0 reconstruction understood Reconstruction tuning for MC10 well advanced good agreement with 2010 data New online monitoring version (to be active at pit soon) Fine and detailed corrections took long time (and manpower) and are still not fully completed Should be much faster with 2011 data Hopefully we’ll just need to check the 2010 parameters are still OK for 2011 The tools to extract parameters are mostly in place Pascal Perret - LPC Clermont 22/03/2011