Master Plan Steering Committee Walking Tour Impressions April 2010.

Slides:



Advertisements
Similar presentations
Case Study: Two Connecticut Towns and the Benefits of Master Planning.
Advertisements

City of Tybee Island 2007 Master Plan Summary Report Area Character Maps and Area Development Recommendations.
A presentation of the Washington State School for the Blind A presentation of the Washington State School for the Blind A Presentation of the Washington.
Town of Dryden, NY :: Hamlet of Varna – Community Development Plan Public Workshop Project Scoping/Issues Identification December 1, 2010.
CRESTDALE NEIGHBORHOOD P R E S E N T P A S T F U T U R E MATTHEWS, NORTH CAROLINA.
Project Background and Objectives
Neighborhood Preservation Program Planning Proposal.
GreenPlan Downtown Design and Greenberg Development Services Report.
Downtown Pride Program CRA Advisory Committee Meeting April 5, 2006.
Final Thoughts. Special Acknowledgments Board of Water & Soil Resources Local Soil & Water Conservation Districts County Environmental Services & Planning.
Compact Policy and Legislative Coordination Jason Liechty Environmental Projects Coordinator Natural Resources Planning and Management Division Broward.
WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding  Fall Presented ‘gaps’ and possible project solutions to WHCA in.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
What is a master plan? Creates the long-term vision for the University’s land and physical resources. Lays foundation for development plan, but is not.
Accessible Mt. Baker Integrated Multimodal Plan Seattle Planning Commission Michael James, SDOT January 8, 2015.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Background slide during set-up– before launch slide begins CITY OF FORT LAUDERDALE.
Broward Transformation: 2035 Long Range Transportation Plan mpo.org.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
Ontario by Bike Workshop April 16, 2015 Lambton College.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
The 21 st Century Vision Plan for Old Town Lawrence Group | Kubilins Transportation Group | Rose & Associates.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Economic Development EVANSTON Chicago-Main-Dempster SSA.
First Discussion of Climate Change Steering Committee Recommendations to COG Board of Directors Agenda Item #6 February 27, 2008.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Greater Mankato Transit Redesign Study Study Overview and Initial Existing Conditions September 2011 In association with: LSA Design and Public Solutions.
Go SOLAR Broward Rooftop Solar Challenge. What is Go SOLAR Broward Rooftop Solar Challenge? U.S. Department of Energy Grant Broward County and 14 partner.
2015 Annual Strategic Action Plan Evaluation. Background & Overview January 2015: Citizen Survey Results March 2015: 2014 Annual Progress Report Delivered.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Effective Transportation Planning City of Seattle, WA.
Final Plan Central Lubbock Stabilization and Revitalization Master Plan Presentation of the Final Plan.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Dallas Center Economic Development Committee Overview of Activities To Date January 26, 2009.
Department of Transportation Transit Rebranding New Brand Identity City Council November 4, 2013.
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
Title Slide. Preliminary Conceptual Development Workshop October 17 – 19, 2007 Campus Master Plan Steering Committee: Dr. Arthur Guilford Vice-President.
Volusia County Council Meeting August 9,  City Commission acts as CRA Board.
1 Asset Management Steering Committee Briefing on Senate Bill 408 (Access Management) August 2013 Harold Lasley, P.E. Access Management Program.
Welcome Go SOLAR Outreach Committee Meeting September 12, 2012.
Planning the Future to enhance and sustain our town PETERSFIELD TOWN DESIGN STATEMENT.
AUGUST 2, 2011 ADMINISTRATOR’S ACADEMY. TRANSPORTATION $1,500,000 REDUCTION Transportation is not provided to students that live within two miles of their.
Community Development Department JOINT PARTICIPATION AGREEMENT WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION For LANDSCAPE AND IRRIGATION IMPROVEMENTS.
Maintenance Agreement with Town Center At Palm Coast Community Development District City Council Workshop February 10, 2015.
Kirby Drive Enhancement Project at IH-59 FiftyNine Design Nikki Conley Michael Cox Michael Milton.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Improvement Public Open House Presentation July 9, 2015 Community Project Plan Puslinch.
DICK RUDDELL EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
Seattle Center City Connector Transit Study Open House #1 February 6, 2013.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Community Redevelopment for Eastside Report on Advisory Committee Input and Request for Board Direction June 26, 2012.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
Our Mission... “To facilitate collaboration and partnerships through a comprehensive master plan which promotes economic growth, community development.
CITY COUNCIL WORKSHOP – APRIL 12, Strategic Action Plan Evaluation Results.
City of Prairie Village 75 th Street Mission Road to State Line Road.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Jefferson County SA Red Rocks Site Approval
Ashland Redevelopment Authority
Urban Renewal and Tax Increment Financing
6/1/ :36 PM Park Plaza © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be.
Zoning Ordinance Update Study
OLD TOWN COMMUNITY WORKSHOP
FY 2011 Status Report on the Ormond Beach Downtown CRA
Nolanville Main Street Sidewalk & Bicycle Connectivity
Ad Hoc Advisory Group presentation, August 3, 2016
ROOSEVELT CITY GENERAL PLAN 2010
Bicycle and Pedestrian Update to City Council
IT’S MORE THAN JUST A ROAD
Presentation transcript:

Master Plan Steering Committee Walking Tour Impressions April 2010

 Consistent Design / Concepts throughout LBTS  Master Plan Concept Integration  Long-term Implementation Schedule (Integrate with CIP Planning Effort)  Prioritize Projects with Community Collaboration (Citizen’s Charrette)  Consider Time Limitations (30% by June)

 Benches / Street Furniture  Bus Stops / Shelters  Street Lights  Crosswalks  Ocean Entrances/Portals  Town Entrance Signs  Central Landscaped Medians  Special Enhancement Areas

Consistent Design (see ocean portals) Master Plan Example

Better signs for Bus & Pelican Hopper Explore potential Broward County Program for Bus Stops.

Design Pavers Landscape Benches

S.E. 15 th Street S.E. 19 th Street Consider the DOT Right of Way when evaluating design options

Publix

LBTS Example Crosswalks Consider stamped / colored concrete Options

Increase Awareness LBTS Landmark Signage Landscape Benches Water Spout Right of Way Issue?

LBTS A1A Fort Lauderdale $50,000 - $100,000 (per small medians)

$30,000-$60,000

Center median sign may not be permissible due to clear zone requirements. North entrance no media. South entrance there is a median with sign.

Private Property Owner / Commercial Property Grant Program (Other cities may have model)