Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.

Slides:



Advertisements
Similar presentations
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Advertisements

Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
Beam Position Monitors MICE CM Harbin January, 2009.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
APS Meeting April 5-8, 2003 at Philadelphia Chunhui Luo 1 Chunhui Luo Inclusive J/ψ Production at DØ.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
PHOBOS TOF Construction Status
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Fermilab PMG Jan 20, 2000 Reconsideration of the Installation at D0  Overview  Major constraints  Basics of old, new schemes  Some details on each.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
2002 IEEE NSS Dmitri Denisov, Fermilab Forward Muon System for the D0 Experiment Presented by Dmitri Denisov Fermilab For the D0 Collaboration 644 members.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Luca Spogli Università Roma Tre & INFN Roma Tre
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Precision Drift Chambers for the ATLAS Muon Spectrometer
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
First CMS Results with LHC Beam
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Installation of the T600 at Fermilab CSN2, September 22,
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC)
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
MDT and analog FEE mass production:
SHiP straw tracker prototype tests
ATLAS Muon Spectrometer and
as a prototype for Super c-tau factory
Presentation transcript:

Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation Forward trigger detectors installation Muon shielding Commissioning of forward muon detectors

Forward Muon Detector Upgrade Forward trigger: scint counters Shielding Forward tracker: mini- drift tubes Completely new forward muon system for Run II

1 < |  | < 2 A,B,C-layers Forward Muon System u 5,000 scintillation counters u 50,000 mini-drift tube channels u Each plane consists of 8 octants  Total detectors weight is ~100ton with coordinate accuracy of 1mm/10m  

Mini-drift Tubes  Here will be individual mini- drift tube picture

Pixel Picture  Here will be individual pixel picture

Forward Muon Trigger System Assembly Status u All parts for all 48 octants are at Fermilab: counters, mounting brackets, etc. u 43 out of 48 octant frames are made u Calibration system production is keeping pace with octants assembly u 30 out of 48 octants assembled and tested and ready for installation: s all tubes, fibers, cables are tested s calibration with r/a source and LED calibration system is performed and documented u On schedule

Octant assembly  High quality picture of assembled octant will be here

Forward Muon Tracking Assembly Status u All 2300 mini-drift tubes for A layer are tested at Fermilab, all 2100 C layer tubes are at Fermilab, tests are under way u Production of B layer tubes continues at JINR: 50% completed u Assembly of A layer octants u Critical items for installation s keep A layer octants assembly and testing on schedule s finish B/C layers drawings and procure all materials Tests of assembled octant in Lab F

Installation of Mini- drift Tubes  Octants are mounted individually on 3 supports, which are attached to magnet (A and B layers) or C layer trusses  Required accuracy of installation is 10mm, required accuracy of octant survey is 0.5mm  After octants are installed u survey u connection to gas system u connection to slow control system u connection to front-end electronics u connection to high voltage system  Current status: design of octants mounts is finished, production started

MDT Mounts  Slide of C layer MDT mounts on C trusses

Scintillation Trigger Counters Installation  Each plane of counters consists of 8 octants  Octants are bolted together to form planes (A and B layers) or “half” planes for C layer  Planes are installed on supports mounted on magnet (A and B layers) or C layer trusses (C layer)  Required installation accuracy is 10mm, required survey accuracy is 2mm  After installation u survey u connections to high voltage system u connections to front-end electronics

Pixels Installation  Drawing of pixels A layer plane installed will be here

Shielding and C Layer Trusses  While C layer trusses exist from Run I considerable modifications are required to support 100 ton shield  The shield u 20” iron, 6” polyethylene, 2” lead  Operating the shield u Data-Taking Position u Transport Position  Design is finished, production of parts is underway with assembly to follow

Data Taking Position

Transport Position

Shielding  C truss reinforcement going on at MAB u C North truss pieces delivered to Lab G for preass’y & survey u C South truss ass’y underway  Stacking Lead + Poly into boxes at DAB Poly & Boxes in High-bay. EF Plug core

Time Schedule for Installation  Resource loaded schedule for forward muon detectors installation is developed  Assembly of C layer trusses and forward shielding starts in November 1999 and ends in February of year 2000  Installation of forward tracking detectors starts in April and ends in August 2000  Installation of forward trigger detectors starts in May and ends in September 2000

Installation Schedule  Here will be forward muon part of Bill’s schedule

Technician Manpower “All” - refers to effort assigned to all tasks in the schedule “Install.” - refers to effort assigned to a subset of installation tasks

Commissioning of Mini-drift Tubes  Commissioning of each mini-drift tubes octant includes the following major tasks u gas leaks test and operation of gas flow monitors u high voltage system check and dark current measurement u commissioning of front-end electronics u muon detection efficiency measurement using cosmic rays  Most of the tasks are similar to tests of mini-drift tubes octants in Lab F  Commissioning will be done by joint efforts of physicists from JINR (6), Fermilab(1), NIU(1), PNPI(1), UW(1) and other D0 Collaboration groups

Cosmic Ray Tests at Lab F  Here will be event display picture of cosmic muon in Lab F per Mont’s request

Commissioning of Forward Trigger Detectors  Commissioning of each scintillation counters octant will include u test of high voltage system operation u light leak test u response of counters to r/a source u operation of calibration system u commissioning of front-end electronics u determination of high voltage for each group of counters and settings for electronics thresholds  Most of the tasks are similar to tests performed in Lab F during tests of assembled octants  The commissioning will be done by joint efforts of physicists from IHEP (5), NeU(1), Fermilab (1), NIU(1) and other D0 Collaboration groups

Results of Scintillation Counters Commissioning in Lab F  Distribution of 96 counters response to r/a source  Stability of PMT gain over 6 months period for single octant RMS is about 10% Gain stability over 6 month is 3%

Manpower for Commissioning  Total number of detectors to be commissioned u 50,000 channels of mini-drift tubes and front-end electronics u 5,000 scintillation counters and same number of TDC/ADC electronics channels  The time for commissioning is short and determined by detector roll-in schedule  8-9 physicists will be required to perform each of the above tasks with help from electronics engineers and technicians  Most of these physicists are visitors from IHEP and JINR

Summary  We have good understanding of all installation aspects, but detailed engineering drawings and safety reviews have to be done: 1 additional engineer for ~ half a year  At some point techs participating in detector assembly come free, but to keep installation running in parallel with detectors production we need ~4 additional techs  Commissioning heavily relies on visitors from IHEP, JINR and PNPI, their presence and support

Mini-drift Tubes  Eight 1*1cm 2 cross section cells mounted in a single gas volume  Tubes length is from 1m to 6m  Fast gas mixture of CF 4 (90%)+CH 4 (10%) provides maximum drift time of 60ns  Coordinate accuracy is ~0.5mm  High detection efficiency  Tubes are produced at JINR (Dubna) and delivered to Fermilab where they are assembled into octants

Trigger Scintillation Counters  Bicron 404A scintillator with Kumarin WLS bars along two edges  1” diameter fast PMT with resistive base  About 45 different sizes from 15cm up to 1.2m  Minimum number of photoelectrons is 60 for largest counter  Time resolution is 1ns  Counters are produced at IHEP (Protvino) and delivered to Fermilab for assembly into octants

MDT Mounts  Here will be slide of MDT A layer installation scheme

Data Taking Position

Transport Position

Open Position

Assembly Plan  Shielding boxes ass’y  Assemble & install North + South EF plugs  Assemble/Test North/South C bottom truss and shield  Assemble/Test North/South C top truss  Installation of North+South C truss components  Installation of mini-drift tubes and scintillation counters  Assembly trusses and shield on the sidewalk  Move trusses into collision hall

Test Results of Mini- drift Tubes in Lab F  Summary of test results of 2300 mini-drift tubes in Lab F u Total measured 2302 (100%) u Rejected during tests 64 (2.8%)  Out of 64 rejected tubes the statistics is the following u Gas leaks 47 (73%) u Broken damping resistors 9 (14%) u Wire tension 7 (11%) u High dark current 1 (2%)  We expect low detector failure rate during commissioning