RHIC Experiment Shielding Working Group Status Report Minutes and presentations are kept at :

Slides:



Advertisements
Similar presentations
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1. N. Souchlas BNL (Oct. 5, 2010)
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
S1,N1 Counters RIKEN/RBRC Itaru Nakagawa. 4/15 ~ 4/29 S1,N1 Counters in MuID square hole. Lay down on the bottom of garage shielding.
MUID Shielding Status Vince Cianciolo Muon Meeting Santa Fe, June 16 th, 2003.
Works done in 2003 ( Minutes and presentations of the RHIC Experiment Shielding Working Group are kept at :
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Answers/considerations to the questions raised on the last ASSRC meeting on Sept. 24, 2013 The following is my summary from s, private communication.
24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
MARS flux simulations - update Sergei Striganov Fermilab August 12, 2009.
1 3D Simulations for the Elliptic Jet W. Bo (Aug 12, 2009) Parameters: Length = 8cm Elliptic jet: Major radius = 0.8cm, Minor radius = 0.3cm Striganov’s.
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3. NICHOLAS SOUCHLAS (10/28/2010)‏
Mar RHIC Planning Meeting Tuesday (Mar. 1) 12pm - Sun (Mar. 6) 8pm: 128 hours Data Taking time: 39.5 hours = ~84% Beam time with collisions (including.
RF Cavity of CIS Xiaoying Pang Mar. 12 th, 2007 IUCF.
6. Atomic and Nuclear Physics Chapter 6.6 Nuclear Physics.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
Mark D. Baker What have we learned from RHIC? Mark D. Baker Chemistry Department Thanks to: W. Busza, Axel Drees, J. Katzy, B. Lugo, P. Steinberg, N. Xu,
Research in Particle Beam Physics and Accelerator Technology of the Collaboration IKP Forschungszentrum Jülich & JINR A.N. Parfenov for the Collaboration.
Experimental background at the presence of pressure rise in RHIC Angelika Drees, Ubaldo Iriso-Ariz RHIC How to measure collision rates Vacuum and collision.
V.Dzhordzhadze1 The Tunnel Background Source Study Vasily Dzhordzhadze University of Tennessee Trigger Upgrade Meeting BNL, April 12, 2004.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
1 S1,N1 Counters RIKEN/RBRC Itaru Nakagawa. 2 Paddle right next to beam pipe.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
Ion operation and beam losses H. Braun, R. Bruce, S. Gilardoni, J.Jowett CERN - AB/ABP.
October 14, 2004 Single Spin Asymmetries 1 Single Spin Asymmetries for charged pions. Overview  One physics slide  What is measured, kinematic variables.
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
Systematic studies of neutrons produced in the Pb/U assembly irradiated by relativistic protons and deuterons. Vladimír Wagner Nuclear physics institute.
Loss Limitations and Collimation Angelika Drees, R. Fliller, W. Fu The RHIC Collimation Sytem: history and overview RHIC Loss Limitations Operational limits.
Introduction From a neutron flux (> 20 MeV), with the Leaching model (Lessard) based on SBMS (Tables 1 and 2):
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
Spin transfer coefficient K LL’ in  photoproduction at HERMES D. Veretennikov On behalf of the HERMES collaboration DIS08, London.
Measurement of photons via conversion pairs with PHENIX at RHIC - Torsten Dahms - Stony Brook University HotQuarks 2006 – May 18, 2006.
 Big questions  why are quarks confined inside protons ? artist’s view :)  what does the vacuum look like ?  can we use understanding.
1 Performance of the STAR Heavy Flavor Tracker in Measuring Charged B Meson through charged B  J/Ψ + X Decay.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Luminosity Monitoring Issues  ZDC  what’s the advantage?  problems  BBC  can they do it? A. Drees QCD critical point workshop, Mar
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Implications for LHC pA Run from RHIC Results CGC Glasma Initial Singularity Thermalized sQGP Hadron Gas sQGP Asymptotic.
Measurement of photons via conversion pairs with the PHENIX experiment at RHIC - Torsten Dahms - State University of New York at Stony Brook for the PHENIX.
Radiation study of the TPC electronics Georgios Tsiledakis, GSI.
RHIC: In Pursuit of the Plasma BNL Summer Sunday 8/26/01.
BOOSTER COLLIMATION AND SHIELDING Proton Source Workshop Fermilab December 7-8, 2010 Nikolai Mokhov Fermilab Accelerator Physics Center.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BEAM PIPE BEYOND FIRST CRYOSTAT ( 20 cm GAPS AND 15.8 g/cc W BEADS ) Nicholas Souchlas, PBL.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
2005/07/12 (Tue)8th ACFA Full simulator study of muon detector and calorimeter 8th ACFA Workshop at Daegu, Korea 2005/07/12 (Tue) Hiroaki.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
R.W. Assmann, V. Boccone, F. Cerutti, M. Huhtinen, A. Mereghetti
Some Design Considerations and R &D of CEPCB Dipole Magnet
Analyses to Support Waste Disposition of SNS Inner Reflector Plug
The design schemes of the low field dipole magnets
Update on GEp GEM Background Rates
Space Charge Effect Simulation Using DA Based FMM and Electron Cooling Simulation for JLab’s MEIC Project.
Tertiary Collimators in IP1/IP5: Progress Report
Antoine Cazes Université Claude Bernard Lyon-I December 16th, 2008
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
MEIC Alternative Design Part III
Presentation transcript:

RHIC Experiment Shielding Working Group Status Report Minutes and presentations are kept at : Kin Yip May 14, 2003

p 0.01 F S 5 additional ft of concrete 0.2 F F p 1.2F B 5 ft concrete p FSFS FBFB F cylindrical tunnel Fluxes & shielding 100 GeV

Sources of the background: PHENIX, STAR and BRAHMS all have evidence to believe that their backgrounds are due to beam scraping at the magnet triplets (Q2 or Q3), rather than beam gas. PHENIX has not had background problem until the beams are steered into collision. For BRAHMS, changing the  * from 2 to 3 during the d+Au run decreased their backgound by a factor of 10 to 20. PHOBOS also did not have background problem when the  * was set to 3 and their background seems to be strongly correlated to the beam gas pressure increase. PHENIX and PHOBOS (at least) have seen backgrounds considerably more on the outside of the ring during the deuteron-gold runs.

Simulation aspects: Tool: MCNPX (newest version 2.5.c) Sources: protons (100 GeV) scraping the inner radii of Q2/Q3 magnets Only turned on protons/neutrons at the moment Major problem (!): MCNPX does NOT have magnetic field. Plan to learn/use MARS for a more complete/realistic simulation but this probably will take some time …

Gap 3 Gap 4 Shield at DX beam direction vertical

Shield at D0 beam direction vertical

Cross-sectional view platform The rest of the blocks are shields. 100 cm

Vertical  (cm) Horizontal  (cm) Mesh Tallies in MCNPX (2.5.c)  without shielding

beam direction vertical One split into half Gap 4 Gap 3

Cross-sectional view shields closer to the beampipe 65 cm Platform

What we have done/learnt … Flux (Gap 3) ~ Flux (Gap 4) Energy cuts change the absolute fluxes/energy deposition but doesn’t change the ratios different physics models tried Source at Q2 ~ source at Q3 For the same length of concrete (5ft), shielding effect : closer to beampipe > DX > D0 > Q2

Source from Q3 Flux (cm -2 ) Energy Deposition (MeV/g) Flux (cm -2 ) Energy Deposition (MeV/g) No shieldFEF'F'E'E' DX0.24 F0.21 E0.23 F'0.21 E' D00.47 F0.50 E0.49 F'0.52 E' Split0.18 F0.15 E0.17 F'0.16 E' Gap 4 (closer to magnets) Gap 3

Conclusion ? Without magnetic field, we probably can’t really predict for sure how good our shielding will be Nevertheless, we have some idea where it may be better to put the shielding (eg. closer to the beampipe) We may go to have a close inspection in the tunnel to see where we could put any kind of shielding at all as close to the beampiple as possible