U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.

Slides:



Advertisements
Similar presentations
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Advertisements

Sander Klous on behalf of the ATLAS Collaboration Real-Time May /5/20101.
S. Gadomski, "ATLAS computing in Geneva", journee de reflexion, 14 Sept ATLAS computing in Geneva Szymon Gadomski description of the hardware the.
Kostas KORDAS INFN – Frascati XI Bruno Touschek spring school, Frascati,19 May 2006 Higgs → 2e+2  O (1/hr) Higgs → 2e+2  O (1/hr) ~25 min bias events.
Information Systems and Data Acquisition for ATLAS What was achievedWhat is proposedTasks Database Access DCS TDAQ Athena ConditionsDB Time varying data.
Chris Bee ATLAS High Level Trigger Introduction System Scalability Trigger Core Software Development Trigger Selection Algorithms Commissioning & Preparation.
Design, Implementation and Maintenance
E. Pasqualucci Software needed (H8) DAQ-1 –BE installed ROD emulator Beam crate readout process Crate controller and message system –Inherited by tile-cal.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
1 The ATLAS Online High Level Trigger Framework: Experience reusing Offline Software Components in the ATLAS Trigger Werner Wiedenmann University of Wisconsin,
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
Large Scale and Performance Tests of the ATLAS Online Software CERN ATLAS TDAQ Online Software System D.Burckhart-Chromek, I.Alexandrov, A.Amorim, E.Badescu,
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: “DOM MB to Event Builder”
INTRODUCTION SOFTWARE HARDWARE DIFFERENCE BETWEEN THE S/W AND H/W.
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
Plans for Trigger Software Validation During Running Trigger Data Quality Assurance Workshop May 6, 2008 Ricardo Gonçalo, David Strom.
1 Trigger “box” and related TDAQ organization Nick Ellis and Xin Wu Chris Bee and Livio Mapelli.
Control in ATLAS TDAQ Dietrich Liko on behalf of the ATLAS TDAQ Group.
Historical Aspects Origin of software engineering –NATO study group coined the term in 1967 Software crisis –Low quality, schedule delay, and cost overrun.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
Issues Autonomic operation (fault tolerance) Minimize interference to applications Hardware support for new operating systems Resource management (global.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Lecture 14 Maintaining the System and Managing Software Change SFDV Principles of Information Systems.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
The ATLAS Trigger: High-Level Trigger Commissioning and Operation During Early Data Taking Ricardo Gonçalo, Royal Holloway University of London On behalf.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
2003 Conference for Computing in High Energy and Nuclear Physics La Jolla, California Giovanna Lehmann - CERN EP/ATD The DataFlow of the ATLAS Trigger.
CHEP March 2003 Sarah Wheeler 1 Supervision of the ATLAS High Level Triggers Sarah Wheeler on behalf of the ATLAS Trigger/DAQ High Level Trigger.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
February Testing Campaign Summary. Disclaimer This presentation is based on the reports of the testing campaign and focuses on the problems arisen during.
1 LHCC RRB SG 16 Sep P. Vande Vyvre CERN-PH On-line Computing M&O LHCC RRB SG 16 Sep 2004 P. Vande Vyvre CERN/PH for 4 LHC DAQ project leaders.
CSC 480 Software Engineering Test Planning. Test Cases and Test Plans A test case is an explicit set of instructions designed to detect a particular class.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
ATLAS TDAQ RoI Builder and the Level 2 Supervisor system R. E. Blair, J. Dawson, G. Drake, W. Haberichter, J. Schlereth, M. Abolins, Y. Ermoline, B. G.
Kostas KORDAS INFN – Frascati 10th Topical Seminar on Innovative Particle & Radiation Detectors (IPRD06) Siena, 1-5 Oct The ATLAS Data Acquisition.
The ATLAS DAQ System Online Configurations Database Service Challenge J. Almeida, M. Dobson, A. Kazarov, G. Lehmann-Miotto, J.E. Sloper, I. Soloviev and.
Trigger/DAQ/DCS. LVL1 Trigger Calorimeter trigger Muon trigger Central Trigger Processor (CTP) Timing, Trigger, Control (TTC) Germany, Sweden, UK Italy.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
January 2010 – GEO-ISC KickOff meeting Christian Gräf, AEI 10 m Prototype Team State-of-the-art digital control: Introducing LIGO CDS.
Online Software November 10, 2009 Infrastructure Overview Luciano Orsini, Roland Moser Invited Talk at SuperB ETD-Online Status Review.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Jeff Kern NRAO/ALMA.  Scaling and Complexity ◦ SKA is not just a bigger version of existing systems  Higher Expectations  End to End Systems  Archive.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
BaBar Transition: Computing/Monitoring
5/14/2018 The ATLAS Trigger and Data Acquisition Architecture & Status Benedetto Gorini CERN - Physics Department on behalf of the ATLAS TDAQ community.
Software Engineering (CSI 321)
U.S. ATLAS TDAQ FY06 M&O Planning
TC activities.
TDAQ Phase-II kick-off CERN background information
ProtoDUNE SP DAQ assumptions, interfaces & constraints
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
Management Breakout: MREFC Budget Summary Victor L
12/3/2018 The ATLAS Trigger and Data Acquisition Architecture & Status Benedetto Gorini CERN - Physics Department on behalf of the ATLAS TDAQ community.
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
CMX Status and News - post PRR -
1/2/2019 The ATLAS Trigger and Data Acquisition Architecture & Status Benedetto Gorini CERN - Physics Department on behalf of the ATLAS TDAQ community.
Presentation transcript:

U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine

U.S. ATLAS FY06 TDAQ M&O Planning August 3, ATLAS TDAQ Overview

U.S. ATLAS FY06 TDAQ M&O Planning August 3, Overview of FY06 TDAQ M&O Activity  TDAQ Construction Project continues beyond CD-4A.  Most hardware acquisition and installation in FY06-07  Much software development, esp. HLT, continues.  TDAQ M&O activity overlaps with Construction in FY  Construction Project ‘labor’ is ramping down quickly.  FY06 is first year of ‘significant’ M&O activity.  FY06 M&O activity focuses on DAQ & HLT Infrastructure s/w.  TDAQ M&O activities can be classified as:  Hardware commissioning  Hardware maintenance  Software commissioning  Software maintenance  Operations  Detector support  TDAQ support

U.S. ATLAS FY06 TDAQ M&O Planning August 3, HLT/DAQ Component View

U.S. ATLAS FY06 TDAQ M&O Planning August 3, Pre-series Hardware

U.S. ATLAS FY06 TDAQ M&O Planning August 3, FY06 Hardware Commissioning & Maintenance  Hardware Commissioning  Complete commissioning of Pre-series system  10% scale of final system w/ components of final specs  Commission final RoI Builder hardware  Commission DAQ infrastructure  Network infrastructure (large central switch) - connectivity to ROS’s  DAQ processors - SFI’s, SFO’s, L2SV’s, pROS’s  Racks & rack instrumentation  Initial complement of HLT processors - late in year  Hardware Maintenance  Pre-series system  RoI Builder  DAQ infrastructure  Test beds - particularly “performance testbed”

U.S. ATLAS FY06 TDAQ M&O Planning August 3, Software Development: Transition to M&O  The Combined Test Beam Release of HLT/DAQ software was nearly complete with respect to DAQ and HLT Infrastructure functionality.  This release was commissioned, operated, and maintained for the 2004 ATLAS CTB Run.  Subsequent development of this HLT/DAQ software consists of:  Added functionality (e.g. fault tolerance & error recovery)  HLT selection algorithm development  Refinement of existing code based upon CTB and subsequent experience and feedback  Development of added functionality and algorithms is Construction Project activity.  Refinement of existing code is M&O activity.  Starting in FY05, software development is increasingly M&O.  After first physics run, software development will be entirely M&O.

U.S. ATLAS FY06 TDAQ M&O Planning August 3, FY06 Software Commissioning & Maintenance  Software Commissioning  Commissioning of new functionality  Examples of U.S. activity:  LVL2 Supervisor and RoI Builder software  DAQ software –Monitoring –Inter-process communication and Information Services –Message passing  HLT Infrastructure software –Run Control & Supervision –LVL2 Steering –EF Dataflow  Software Maintenance  Maintenance of above (bug fixes, releases, TDAQ/Offline consistency)  Incorporate new functionality based upon experience

U.S. ATLAS FY06 TDAQ M&O Planning August 3, FY06 Operations  Operating DAQ infrastructure in USA15 and SDX1 in support of Detector (and TDAQ) commissioning  Network administration  System administration (DAQ and HLT computer systems)  TDAQ support teams will start rotations once level of activity at Point 1 demands

U.S. ATLAS FY06 TDAQ M&O Planning August 3, FY06 Detector & TDAQ Support  Detector Support  ROD Crate DAQ maintenance and support  Support for:  Detector-specific software development, e.g.: –ROD software –Online histogramming & monitoring  Detector commissioning  Detector calibrations (and test beam runs ?)  TDAQ Support  Support development & commissioning of other TDAQ subsystems  Examples:  SRB support for commissioning LVL1 trigger subsystems  Integration of HLT vertical slices  Network support for Dataflow performance tests

U.S. ATLAS FY06 TDAQ M&O Planning August 3, FY05 M&O Activities  Hardware Commissioning  Pre-series system, including pre-series RoIB  DCS for TDAQ racks  Planning for TDAQ infrastructure commissioning  Hardware Maintenance  Set up RoIB test bench  TDAQ test bed maintenance & administration  Software Commissioning  Releases, release testing, release testing procedures  Software Maintenance  Maintain code authored by U.S. members, e.g.:  Message passing, Information Services, Online Histogramming,  HLT Steering, HLT Control, Monitoring  Synchronization of releases with Offline  Adapt/port code to new compiler and new CERN Linux

U.S. ATLAS FY06 TDAQ M&O Planning August 3, FY05 M&O Activities – p. 2  Operations  Completion of CTB run  System administration planning  Detector Support  TileCal beam test  Monitoring  Support of production and simulation of test beam data  TDAQ Support  Support integration with RoIB in CTB  Support of HLT algorithm integration  Test bed setup in UK, Dubna

U.S. ATLAS FY06 TDAQ M&O Planning August 3, M&O Planning Methodology/History  Experience in FY04, particularly CTB, indicated prior estimates of M&O effort were low.  New bottoms-up estimate of M&O effort in Jan  By “new kid on block”, w/ input from all involved  Based on effort needed for commissioning and ongoing maintenance of hardware & software components delivered by U.S.  Constructed matrix of effort per component vs. time  Estimate larger than prior estimate => add Management Reserve  MR added covers ~1/2 of increase in estimate  Checked total estimate w/ 20% of top-down estimate for ATLAS  Coordinated w/ TDAQ Management Team

U.S. ATLAS FY06 TDAQ M&O Planning August 3, Preoperations – FY Supervisor – RoI Builder 28k$ ANL: 15k$; Dawson/Drake; TDAQ Support MSU: 12k$; Ermoline; TDAQ Support Communications & Travel (16k) ANL: (8k) MSU: (8k) Programming Support 103k$ (201k) ANL: 59k$; Schlereth/TBN; S/w Comm, Detector Supp MSU: 44k$ (17k); Ermoline/TBN; H/w+S/w Comm, Det Supp UCI: 0k$ (104k); Stancu/Kolos/Negri; H/w+S/w Comm, Det+TDAQ Supp UWisc: 0k$ (80k); Wiedenmann/dosAnjos/Xu; S/w Comm, Det+TDAQ Supp

U.S. ATLAS FY06 TDAQ M&O Planning August 3, Operations – FY Supervisor – RoI Builder 137k$ ANL: 97k$; Dawson/Drake/Schlereth; H/w+S/w Maint, TDAQ Support MSU: 40k$; Ermoline; H/w+S/w Maint, Ops, TDAQ Support Communications & Travel 51k$ ANL: 13k$ MSU: 13k$ UCI: 13k$ UW: 13k$ Test Facilities ANL: 10k$ MSU: 11k$

U.S. ATLAS FY06 TDAQ M&O Planning August 3, Operations – FY06 (p. 2) Programming Support 668k$ (241k) ANL: 248k$ Schlereth/TBN; S/w Maintenance, Detector Support MSU: 90k$ (22k) Ermoline/Hauser/TBN; S/w Maintenance, Ops UCI: 205k$ (206k) Stancu/Ciobotaru/Unel/Kolos/Wheerler/Negri/Rogge H/w+S/w Maintenance, Ops, Detector+TDAQ Support UW: 126k$ (13k) Wiedenmann/dosAnjos/Xu; S/w Maintenance, Det+TDAQ Support

U.S. ATLAS FY06 TDAQ M&O Planning August 3, FY06 Management Reserve  FY06 MR priorities (in rough priority order) :  Hardware commissioning: 0.25 => 0.5 FTE  Software commissioning: 0.25 => 0.5 FTE  Hardware maintenance: 0.5 => 1 FTE  TDAQ support: 0.4 => 1 FTE  Operations: 0.3 => 1 FTE  Detector support: 1 => 2 FTE  SRB: 1 => 1 FTE; Software maintenance: 2.5 => 2.5 FTE  Total: 6.2 => 9.5 FTE ~458k$  Impact of MR:  Improved readiness of TDAQ for cosmics and beam  Improved efficiency of detector commissioning  Improved tools for detector monitoring  More efficient HLT/DAQ operations  Improved efficiency of operations due to s/w enhancements  Without MR funds, either or both:  Reduced DAQ support for detectors, w ith delays in detector commissioning  Reduced effort on ongoing HLT/DAQ development, with delays in completing critical software