L'Ambiance Plaza Collapse Bridgeport, Connecticut April 23, 1987

Slides:



Advertisements
Similar presentations
Building Construction. Purpose Why should we, as firefighters, be concerned with building construction? Why should we, as firefighters, be concerned with.
Advertisements

Why Is Special Inspection Good For Us?
8621 Georgia Avenue Silver Spring, MD
Heavy Concrete Construction Formwork
Riverview Heights Darren K. Howard Structural Option Architectural Engineering Spring Thesis 2005 Advisor: Dr. Ali Memari.
Structural System Overview
Concrete and Masonry Work Different forms of concrete work Each has it’s own unique hazards – Lift Slab – Pre-stressed Concrete – Concrete Pumping – Masonry.
We are reviewing Chapt. 1&2 and we assigned Chapt. 3 & 4 for
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Subpart R Steel Erection
Skyscraper Construction
Advanced Construction Technology
SRT251- Construction and Structures 2 Timber Portal Frame Glenn Murcutt Daniel McLean
5/1/2015OSHA Office of Training & Education 1. 5/1/2015OSHA Office of Training & Education 2 Subpart Q - Concrete & Masonry Construction ( )
“It’s All Fun and Games Until the Parking Garage Collapses” CASE STUDY: 2003 Tropicana Casino Parking Garage Collapse.
Mechanics of materials ** progressive collapse **  The term progressive collapse is defined as the collapse of all or a.
OSHA Subpart Q Concrete and Masonry Construction.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Connections and Bracing Configurations
ATHENS 12 th of April, M. Eng. Velyan Petkov The European Center for Risk Prevention, Sofia, Bulgaria Bulgarian seismic design codes and civil construction.
Building Construction Instructor Brian Ward. Purpose  Why should we, as firefighters, be concerned with building construction?
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
for Earthquake Resistance
Floor Systems and Foundation Support
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Appendices Subpart R Steel Erection
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
Ethical Disasters Group 8 By Dominique Amos, Josh Seuss, Alex Finkelstein, Mike Hite, Kevin Hao.
World Trade Center 7 Building Performance Assessment.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Construction Drawings
Joe Sharkey Structural Option Christiana Hospital 2010 Project Newark, DE.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Presented by the Wood Truss Council of America
L’Ambiance Collapse Group 15 David Lawlor Emma Quinn Daniel O’Sullivan Cian O’Sullivan.
Marieclaire Monasterio Aracelis Cedeño
Hartford Civic Arena Roof Collapse
+ 9/11: A Terrible Event on American Soil (Source: worldpittsburgh.wordpress.com)
The Royal Plaza Hotel Collapse. Background on Collapse  Collapsed Friday 13 th August 1993 at 10:10 a.m.  The collapse took less than 10 seconds! 
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER
Group 15 Simon Phelan Phillip Barry Simon White Fabien Raoux.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
DETAILS OF STEEL FRAMING
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane.
Design of Bracing Connections in Concentrically Braced Frames
Hartford Arena Roof Collapse.  January 18th  Snowstorm.  Roof plummeted 83 feet to the arena floor.  What caused the 300-x 360ft. roof to collapse?
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Floor Systems and Foundation Support
Long Span Truss Installation
Introduction Used for covering spaces in the form of roof or floor
Advisor: Professor M. Kevin Parfitt
Ryan Johnson - Structural Option
Introduction to Structural Design
Design Ribbed and Flat Slabs
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
TOLMAN HALL RETROFIT POSSIBILITIES
Project: 250 West Street, Columbus, Ohio
Introduction to Structural Design
Presentation transcript:

L'Ambiance Plaza Collapse Bridgeport, Connecticut April 23, 1987 Group 15 Stephen Conlon Brian Dowling Kevin Brandon Remi Monteiro

Introduction L'Ambiance Plaza was planned to be a sixteen-story building with thirteen apartment levels topping three parking levels. It consisted of two rectangular towers (The East Tower and The West Tower), 63 ft by 112 ft each, connected by an elevator.

Floor Plan

Construction Seven-inch thick post tensioned, concrete slabs and steel columns comprised its structural frame. The lift-slab method of construction was utilized in the construction of this building. The floor post tensioned slabs for all sixteen levels were constructed on the ground, one on top of the other. Then packages of two or three slabs were lifted into temporary position by a hydraulic lifting apparatus and held into place by steel wedges. Once the slabs were positioned correctly, they were permanently attached to the steel columns. Structural drawings specified that during construction the shear walls, which provided lateral resistance for the building, should be within 3 floors of the lifted slabs.

Collapse At the time of collapse, the building was a little more than halfway completed. The shear walls were about five levels below the lifted slabs. The workmen were tack welding wedges under the ninth, tenth, and eleventh floor package to temporarily hold them into position when they heard a loud metallic sound followed by rumbling. The entire structure collapsed, first the west tower and then the east tower in 5 seconds. 28 construction workers died in the collapse. An unusually prompt legal settlement prematurely ended all investigations of the collapse. Consequently, the exact cause of the collapse has never been established.

Why it collapsed? The building had a number of deficiencies; any one of which could have triggered the collapse. Each one of these following theories can explain where the first failure took place. Theory 1: The slabs’ lifting assembly failure caused the collapse. Theory 2: The instability of the wedges holding the twelfth floor and roof package caused the collapse. Theory 3: The improper design of the posttensioning tendons caused the collapse. Theory 4: Questionable weld details and substandard welds could have caused the collapse. Theory 5: The sensitivity of L’Ambiance Plaza to lateral displacement caused its collapse

Conclusion A two-judge panel mediated a universal settlement between 100 parties closing the L’Ambiance Plaza case. Twenty or more separate parties were found guilty of "widespread negligence, carelessness, sloppy practices, and complacency." Those injured and the families of those killed in the collapse received $30 million. Another $7.6 million was set aside to pay for all of the claims and counter claims between the designers and contractors of L’Ambiance Plaza.

Conclusion While buildings constructed by the lift-slab method are stable once they are completed, if great care is not taken during construction they can be dangerous. The following measures can be taken to insure lateral stability and safety during construction. During all stages of construction, temporary lateral bracing should be provided. Concrete punching shear and connections redundancies should be provided in the structure Cribbing (temporary posts which support the concrete slab until it is completely attached to the column) should be used. Sway bracing (cables which keep the stack of floors from shifting sideways) should be used. This was required, but not used in L’Ambiance Plaza. These measures could have saved the life of 28 construction workers.