Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Effective Contract Management Planning
Checking & Corrective Action
Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Contractor Assurance System AC Overview October 13, 2009.
Environmental Management Systems An Overview With Practical Applications.
EMS Auditing Definitions
Quality evaluation and improvement for Internal Audit
External Quality Assessments
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Purpose of the Standards
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
FPSC Safety, LLC ISO AUDIT.
Software Engineering Institute Capability Maturity Model (CMM)
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Corporate Governance: Beyond Compliance at a time of Recession Prof. Ashley G. Frank BA(Econ)[Magna Cum Laude], MDPA (Cum Laude], MBA, MCom [Cum Laude],
Internal Auditing and Outsourcing
First, a little background…  The FIT Program is the lead agency for early intervention services under the Individuals with Disabilities Education Act.
Implementation of DOE Order 450.1: Self-Declaration and Report Letters Steven R. Woodbury US Department of Energy March 9, 2005.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Work Planning & Control for “All” Activity Level Work Tim Flake Maintenance Advisor Washington Savannah River Company ISMS Work Shop November 28, 2007.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
Carol L. Sohn Senior Nuclear Safety Advisor, Office of Science, SC-33 1 May 5, 2011 Review of Science Sites Hazard Categorization.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Environmental Restoration Projects Methods for Safety Culture Realization November 30, 2007.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Georgia Institute of Technology CS 4320 Fall 2003.
Unraveling the Assessment Gordian Knot D. L. Lester, CM Savannah River Remediation, LLC.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
DOE-RL Safety Oversight Planning – Documenting - Reporting Rob Hastings, Director Mat Irwin, Team Lead Operations Oversight Division ISM Best Practices.
Guidance Training CFR §483.75(i) F501 Medical Director.
Brookhaven Science Associates U.S. Department of Energy Sustaining Excellence in Radiological Operations Through Peer Surveillance C. Schaefer, CHP D.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
6 November 2013 Created for IEA Conference Presented by: M. Cristina Ferrari NAVFAC SW Environmental Program Manager Naval Facilities Engineering Command.
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
ISM WORKSHOP April 24-27, 2006 Albuquerque, NM Feedback and Improvement Assessment Results and Path Forward Michael N. Worley Office of Nuclear Energy.
Defense Nuclear Facilities Safety Board September 26, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office of Quality Assurance.
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Verification, Validation and Internal Audits - Jose Jimenez Federal Facilities Program Manager – EPA Region III.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
DOECAP Laboratories Phased Audits U.S. Department of Defense 2016 Environmental Monitoring and Data Quality Workshop St. Louis, Missouri April 12-14, 2016.
Tracking Environmental Performance - Tomas Pivoras, Kaunas University of Technology, Kaunas, Lithuania 1 Tracking Environmental Performance Tomas Pivoras.
Quality Assurance Briefing Defense Nuclear Facilities Safety Board June 1, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
EFCOG Safety Working Group (SWG) Status June 7, 2016 EFCOG Working Group Coordination Meeting Washington, DC John McDonald, SWG Chair.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Planning for Succession
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Regulatory Oversight of HOF in Finland
How to conduct Effective Stage-1 Audit
Trending Requirements and Results
Presentation transcript:

Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson, Contractor Assurance 2009 DOE Integrated Safety Management Conference SRR-ESH

2 Bio – Robert (Bob) Hinds Manager, Quality Assurance Engineering and Enforcement Coordinator for Savannah River Remediation, the new Liquid Waste Operations contractor at SRS Thirty-five years’ experience in Naval, Commercial, and DOE Nuclear Operations, Training, Engineering, Project Management, and various Nuclear Oversight functions Degrees in Quality Assurance Technology and Education

3 Corporate QA Performance Metric System Contractor Organizational Considerations –Multiple Contractors, One Program –New Functional Area Managers (FAMs) Maximizing Utility, Minimizing Effort –Use of existing assessment programs Analyzing, Rating, & Documenting Results Validating Results Opportunities for Improvement (OFI) Implementing CPMS for QA

4 Corporate QA Performance Metrics DOE EM Corporate QA Board Initiative 9/08 Piloted at two DOE Sites 10/08 Received revised direction 1/09 –“The Contractor is expected to complete the metrics” Supports QA & Contractor Assurance Requirements Criteria from 10 CFR and DOE C Required Element for Annual QA/ISM Validation

5 New contract structure at SRS effective August 2008 New Functional Area Managers for Liquid Waste Operations –What’s a FAM? Existing Performance Analysis Processes (12Q Manual) –Quarterly (PA-1) to support QA program & ORPS analysis –Monthly & Annually (PA-2) to support QA and other programs PA-2 Assessment Identified Opportunities for Improvement –Understanding of process –Thoroughness of analysis –Verifiable evidence of assessment –Solution: One-on-one tutorials & “operator aids” Contractor Performance Analysis

6 SRS 12Q Assessment Manual –Operational Readiness Reviews –Self-Assessment –Management Assessment –Independent Assessment: Facility Evaluation Board –Performance Analysis SRS 1Q Quality Assurance Manual –Audits, Surveillances, Supplier Surveillances Management Field Observations External Audits & Evaluations Corrective Action Program Data –Site Tracking, Analysis and Reporting (STAR) System Contractor Assessment Programs

7 SRS SCD-4: Assessment Performance Objectives and Criteria (POCs) –23 Functional Areas of Program Management –Thousands of existing potential lines of inquiry (LOI) –DOE 425.1C Startup and Restart of Nuclear Facilities –Regulatory Requirements –Programmatic Requirements –Presidential Focus Areas –Used for multiple assessment programs Assessment Program Structure

8 Used all available internal & external assessment data –Audits, assessments, surveillances, and evaluations –Performance analyses including performance metrics –Corrective action system data Limited additional field activity required –Review STAR Database Issues & Actions –Provide verifiable evidence of assessment Mapped SCD-4 Functional Areas to CPMS LOI’s –Used to “data mine” for assessment results CPMS Integration with P/A Process

9 FAMs reviewed Performance Analysis results against applicable CPMS criteria –Functional area specific (e.g., Design, Procurement) –Cross-functional areas (e.g. Training, Document Control) Results in each of 23 Functional Area PA-2 Reports Functional Area data rolled-up into QA CPMS Table Incorporated QA CPMS into the QA PA-2 report Incorporated QA PA-2 data into the Corporate Quarterly PA-1 report QA CPMS results = Contractor QA Performance CPMS Integration with P/A Process

10 Auditor Training Class Concurrent with CPMS Lead Auditor Oversight Five teams of Auditors-in-Training –Experienced FAMs and Subject Matter Experts Verified Evidence Offered by FAMs –45 of 50 CPMS Lines of Inquiry Evaluated Audit Results consistent with FAM input Opportunities for Improvement Identified Validating The Process

11 Analysis and Rating Included “the good news” –Assessment activity with no findings or OFIs –Validated conformance/compliance Applied selected LOIs to multiple functional areas –Training, Quality Improvement, Documents & Records, Work Processes, Determined thresholds for ratings Rated Performance Varies from M&O contractor –Scope of work/risk varies –Quality of performance may vary –Quality and/or volume of assessment evidence may vary

12 Opportunities for Improvement Continue training for FAMs & SMEs Improve definition of FAM expectations Improve quality of “basis” for scoring –Better screening of relevance –“Quality vs. quota” for assessment activities Improve data quality for STAR system Define ongoing CPMS maintenance needs Integrate CPMS output with assessment plans Improve alignment of analysis with organizational structure Establish action plans to get from green to blue

13 Conclusion Tools were available to implement CPMS –Existing assessment & audit programs –Corrective action data –External evaluation data Required minimal additional field work Implementing QA CPMS added value –Improved line management engagement –Improved documentation of evidence for analysis of performance

14 Reference: Scoring Score ColorNumberScore guidance Excellent 4 Process, plans or procedures established to address criteria. Assessment evidence demonstrates that system in place is programmatically compliant and has been effectively implemented. Previously identified issues have been corrected and incorporated into the program (feedback and continuous improvement). Good 3 Process, plans or procedures established to address criteria. Assessment evidence demonstrates that system in place is programmatically compliant; however, implementation concerns require attention. Concerns have been addressed in the corrective action program but have not yet been resolved. Investigate 2 Process, plans or procedures established to address criteria; however, no assessment evidence is available to demonstrate compliance or process implementation, or evidence demonstrates a continuing legacy concern that has not been addressed. Define Actions 1 Process, plans or procedures are not established to address criteria. Assessment evidence shows that the process, plans or procedures are programmatically inadequate or process, plans or procedures are established to address criteria; however, significant quality issues (e.g. PAAA) were identified during the period.