DEAD DIKES. DEAD DIKES USING DEAD POSTS IS A DAVE DERRICK DISCOVERY (DDD)

Slides:



Advertisements
Similar presentations
BANK EROSION PINS.
Advertisements

Landforms of the Fluvial System
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
Natural Riparian Resources Vegetation Landscape/Soil Water.
Irish Gulf, Boston, NY  Vertical eroding banks  Urban  Pool-riffle-pool regime  Gravel-cobble bed stream  Small stream (average width 30 ft, 10 ft.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
GRADE CONTROL. STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
GOODWIN MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
Definitions: Weathering: the break-up of rock at earth’s surface Erosion: the physical removal and transport of rock material by water, wind or ice.
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
LOCKED LOGS (LL). THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Floodplains and Floods Key idea: River floods are naturally occurring events that sometimes threaten human populations.
STONES IN COMPRESSION – BOTH NATURALLY & MACHINE PLACED by Dave Derrick.
 This will occur when streams receive more water than their channels can hold,  i.e. when stream discharge is greater than stream capacity.  Streams.
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
US Army Corps of Engineers BUILDING STRONG ® Value Engineering the Termination of the Blue River Flood Conveyance Channel Alan Schlindwein, PE US Army.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
River Research & Design, Inc.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
GRADE CONTROL: the VIFFLE {Combo of the cross- Vane & rocked rIFFLE}
THE ROCK BOX  Cost to build Rock Box $18K, constructed of ½ inch steel plate, box is designed to increase in-stream stone placement production by keeping.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
Bellringer: How is rock broken up and changed? By Weathering at earth’s surface How is Soil broken up and changed? By Erosion: the physical removal and.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
GRADE CONTROL.
When should you fix a stream????
River Terraces.
SINGLE STONE BENDWAY WEIRS
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
The Work of Streams.
River Systems Part 2 Features of a Meandering River Levees
1ST YEAR OF ESO RIVERS PROFESOR TIERNO GALVÁN SECONDARY SCHOOL.
When should you fix a stream????
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Presentation transcript:

DEAD DIKES

DEAD DIKES USING DEAD POSTS IS A DAVE DERRICK DISCOVERY (DDD)

DEAD DIKES : Dense rows of large driven dead posts, or trenches filled with posts and/or brush, positioned perpendicular to high flow on floodplain areas to reduce flow velocities, & possibly catch debris, & induce sediment deposition.

WALNUT BROOK, LOCATED IN MINE BROOK PARK, FLEMINGTON, NEW JERSEY FOUR ERODING BENDS WITH SEVERAL HEADCUTS PROJECT CONSTRUCTED JUNE 23 - June 26, 2009

CONSTRUCTION-Looking Dead Dike (DD)posts designed to slow flow in a floodplain high-flow relief channel. CONSTRUCTION-WALNUT BROOK, NJ. PIX BY DERRICK

CONSTRUCTION-Looking Dead Dike (DD) posts. Concern was that headcutting would occur in this high flow floodplain channel during long-duration, high flow flood events. DD designed to reduce velocities to prevent headcutting. CONSTRUCTION-WALNUT BROOK, NJ. PIX BY DERRICK

CONSTRUCTION COMPLETE Photos by Dave Derrick SEPT. 20, 2009

3 MONTHS Dead Dike (DD) 3 MONTHS OLD-WALNUT BROOK, NJ. -PIX BY DERRICK

3 YEARS & 9 MONTHS AFTER PROJECT COMPLETION Photos by Dave Derrick MARCH 13, 2013

3 YRS 9 MONTHS LATER-Looking deep driven posts (Dead Dike) designed to slow flow in secondary channels on floodplain. Still catching debris & still working!! 3 YRS 9 MONTHS LATER-WALNUT BROOK, NJ. PIX BY DERRICK

3 YRS 9 MONTHS LATER-Looking deep posts (Dead Dike) designed to slow flow in secondary channels on floodplain

Little Blue River Hanover, KS. Clark Site Built July 2002

DEAD DIKES USING BRUSH FILLED TRENCHES IS A PHIL BALCH DISCOVERY (PBD)

14 Site # 18 – Clark - 7/2002-Removing debris that is choking channel.

15 Site # 18 – Clark - 3/2003, 8 months after construction-Trenches cut on floodway, then backfilled with woody debris from river to slow flow, induce sediment deposition, & induce vegetative growth to make this an ineffective flow area. River is three times as wide as it should be.

16 Site # 18 – Clark 3/ months after construction- close-up of Dead Dike trench

17 Site # 18 - Clark, 6/ years After Construction - well vegetated floodplain bench due to Dead Dikes (DD)

This PowerPoint presentation was developed & built by Dave Derrick. Any questions or comments, call my personal , or Enjoy the information!!

Geaux Saints!!