Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

“Aggressive schedule” seen by MJPB (just for WP1) (incl. VAT) Needed to be aggressive to meet 2005/6 shutdown….
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Gateway process Gateway Process: ‘owned’ by UK Office of Science and Technology Essentially the mechanism by which UK involvement in large projects gets.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
UK Costs Beam & Infrastructure Coils Tracking Detector.
MICE – the UK Perspective Rob Edgecock RAL/CERN-AB Introduction Introduction UK Contributions UK Contributions Location Location New beamline New beamline.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
Project manager report paul drumm CM16 October 2006.
K. Long, 14 October 2003 MICE-UK: progress report Progress: WP1: B&I: Target u/g (Sheffield) … PD Focus coil assembly Spectrometer Software Issues: Scientific.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
Muon Ionization Cooling Experiment: U.S. Muon Accelerator Program Perspective and Approach Mark Palmer May 7, 2013.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
UK status report (funding) Status of UK bid for funding Savings/contributions in kind Gateway process Support from ISIS Conclusions/personal comments.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
The categories for ILC budget planning are: R&D – work done in laboratories to develop and verify subsystem components. This supports the cost reduction.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
Muon Ionisation Cooling Experiment Overview
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Status of the MICE Construction Project
Introduction to ASTeC Programmes
UK Financial Plan & Risks
MICE CM31 Schedule summary
MICE Project in the US: Completion of Efforts
Preparations for a Lehman Review
A High Intensity Neutrino Oscillation Facility in Europe
Preliminary Project Execution Plan
Presentation transcript:

Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund

Feedback from PPRP: 1 The Panel endorsed the science case for an eventual neutrino factory … The Panel recognised that muon cooling is an important technology milestone on the path to a neutrino factory, and that the proposed MICE facility is capable of achieving the first major step in demonstrating it. The Panel noted that, …, the opportunity to host MICE at RAL would allow the UK to take a strategic lead in developing neutrino factory technology … The Panel considered the proposed timescale for MICE to be aggressive, but acknowledged the enthusiasm of the proponents and their desire to maintain momentum for the project. The Panel … endorsed the recommendation … that an independent technical and cost review should take place at the earliest opportunity. The Panel noted the current estimate of 21.7M for the UK contribution and … encouraged the proponents to investigate mechanisms for reducing [it] … The Panel recognised that a minimal work programme in FY03/04 that involved clearing the experimental hall, procuring the shielding blocks, and preparing to drill a hole in the ISIS vault wall would provide a positive indication of a UK enthusiasm for MICE. The Panel recognised that, without such a programme, the project would be delayed by roughly a year and external funding could be jeopardized.

Feedback from PPRP: 1 The Panel acknowledged the vital roles that the UK groups are playing in the MICE experiment, namely the scintillating fibre detector R+D and the design of the solenoid focus coils. Assuming that funding is available, the Panel agreed that it was essential that the proponents contribute to the experiment in addition to providing the MICE beamline. The Panel appointed … referees and to work with the proponents to arrive at a minimal cost to allow these activities to proceed in the first year of the project, in FY03/04. The Panel encouraged the Director RAL-PPD to investigate whether a mechanism for providing costs for the first year programme could be negotiated with CLRC. The Panel agreed to consider the level at which it could fund such a minimal programme at the June meeting. The Panel therefore requested that the proponents submit a detailed proposal and justification for the FY03/04 funding request, which should include the work programme and costs, whilst keeping in mind the overall scope and priorities for the project.'

Summary of MICE-UK costs

Cost to the UK by work package Possible funding scenarios Scenario 1: £7.5M Scenario 2: £10M Scenario 3: £12.5M Scenario 4: £15M

WP1: B&I: profile and total Cost of construction of decay solenoid (PSI solenoid unacceptable) Work package 1: profile excluding cost of replacement solenoid

Interim conclusions/comments Scenario 1: £7.5M  UK can afford to do ‘most’ of beam and infrastructure project but nothing else!  Would imply loss of UK leadership in any area of experiment  Would jeopardise viability of iMICE  iMICE would look for alternative home laboratory Scenario 2: £10M  UK can afford to do beam and infrastructure project and attempt to mount an analysis effort  Would imply loss to UK of focus-pair and instrumentation projects. Funds for modest software activity could perhaps be found if additional savings or international contributions to B&I could be found  Would jeopardise viability of iMICE  iMICE would be likely to consider an alternative home lab Consider scenarios 3 and 4 below assuming:  Risk that PSI solenoid will not perform as required is low and that therefore cost may be removed from base-line (pursue ‘gentleman’s’ agreement with PSI)  Seek additional contributions (e.g. iMICE common fund)/savings

WP1 large-cost items, WP2-4 WP 1: B&I: with all ‘savings’: £8,445k (including VAT, inflation and contingency)

UK contributions to MICE Focus coil assemblies Trackers in and out Chosen because: Crucial contributions at heart of cooling channel and instrumentation Well matched to expertise of UK groups

Scenarios 3 and 4 Scenario 3: £12.5M  UK can do beam and infrastructure project and either focus- pair or instrumentation/software projects  Assumes contribution from iMICE common fund and contribution in kind for RF system  UK could loose one key system of the experiment  iMICE would need to redistribute cost or find additional collaborators  risk to iMICE Scenario 2: £15M  UK can do beam and infrastructure project as well as focus- pair and instrumentation/software projects  Assumes contribution from iMICE common fund and contribution in kind for RF system  UK will remain at the heart of both the MICE cooling channel and the MICE instrumentation  Strong support +ve impact on likely success of iMICE

Issues Financial year 2003/04:  ISIS have indicated that MICE work scheduled for 2004 shutdown can not be guaranteed unless work can start mid- to late-June  some resources must be committed  Focus-pair conceptual design urgently needs ED effort. Conceptual design work gradually being compromised.  Construction of prototype SciFi tracker reaching critical phase where items have to be purchased. Risk of compromising tracker-technology decision milestone. iMICE has initiated discussion of common fund. Goal is to conclude along with conclusion of charter discussions at the October MICE collaboration meeting  UK position?

Scenarios:

WP1: B&I: profile and total cf scenario 1 Cost of construction of decay solenoid (PSI solenoid unacceptable) Work package 1: profile excluding cost of replacement solenoid

WP1: B&I: profile and total cf scenario 2 Cost of construction of decay solenoid (PSI solenoid unacceptable) Work package 1: profile excluding cost of replacement solenoid

Summary of MICE-UK costs: excl. solenoid Investigate large-cost items WP1 alongside WP2, 3 and 4

WP1: large-cost items 1: cryogenic system Cryogenic system: model for capital cost  Assume 40% for beamline; 60% iMICE common fund  UK takes 33% share of common fund

WP1: large-cost items 2: RF system/beamline RF system:  UK contribution in kind rather than capital? Beam line:  CCLRC contribution?

Focus-coil assembly, instrumentation, s/w Focus-coil assembly Spectrometer instrumentation MICE software Excludes exploitation and travel

MICE-UK costs – assuming all savings