CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012.

Slides:



Advertisements
Similar presentations
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Advertisements

BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
James Richmond09/09/20101 CLIC Permanent Magnet Quadrupole - Proposed Mechanism Prepared by James Richmond Presented by Norbert Collomb STFC Daresbury.
Typical Walk-in Closet with elfa® décor
MICE Radiation Shield Design review for the proposed ‘Direct Drive’ MICE Spectrometer Radiation Shield 17/11/2011Norbert Collomb.
Threads and Fasteners.
2- Crankshaft, Piston Pin, and Piston Rod Bushing.
Gauging Devices.
Rolling element bearings A. Lozzi 2012
Engineering Graphics Stephen W. Crown Ph.D.
Orthographic Projection
Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Auxiliary Views.
Connecting crank and pivot shaft assemblies. Press fits, or interference fits are sometimes used in manufacturing to reduce manufacturing costs or liabilities.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
CLIC Permanent Magnet Quadrupole Engineering Development Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 2/07/2010.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
Rolling element bearings A. Lozzi 09
Industrial Challenges of Compact Magnet Production N. Collomb 27/11/ Norbert Collomb, STFC J. Clarke, B. Shepherd, N. Marks, STFC-ASTeC M. Modena,
Lathe and drilling machines
MICE Radiation Shield Installation 1 18 th October2012 Summary of initial test N. Collomb.
MICE – Moving Platform Engineering solution –A proposal 16/02/2011Norbert Collomb1.
Dr. R. Ribeiro, Mechanical Engg. Dept. IITD
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
Lathe and drilling machines
General Tolerance and Hole Fit
dsdfsa Zoomed in view… Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Part and Drawing Dimensioning
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 13/09/2012.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
Lecture 2: 2-D Transformation and Projection Multi-view Drawing
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
PASI OsC meeting 12th July 2012
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Setting up correctly Different types and their use
Drive Beam Quadrupoles Jim Clarke, Norbert Collomb, Ben Shepherd, Graham Stokes STFC Daresbury Laboratory, UK Antonio Bartalesi, Michele Modena, and Mike.
Main Parts of a Drilling Machine
Multi-view Projection Drawing
Artwork: S. Kimball. The CLIC Drive Beam The drive beam decelerates from 2.4 GeV to 0.24 GeV transferring energy to the main beam As the electrons decelerate,
Introduction Lathe is a machine, which removes the metal from a piece of work to the required shape &size The basic lathe that was designed to cut cylindrical.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
ENGINEERING ADVENTUREwww.BLOODHOUNDSSC.com BLOODHOUND SSC AMAD GEARBOX MOUNTING PLATE ASSEMBLY ABH:E0011 The following explains the AMAD gearbox mount.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
CLIC Permanent Magnet Dipole Feasibility Proposal
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
Planer Machines. Introduction A planer is a type of metalworking machine tool that is some what similar to a shaper, but larger, and with the entire workpiece.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
VIEW SERIES with Sliding Door
Gauging Devices.
Fits and Tolerances: Linear and Geometry.
Steering Systems Topics covered in this presentation:
UNIT-I SLOTTING MACHINES
Platform for Target Spectrometer using linear montion drive Rexroth
Alex Bainbridge1, Ben shepherd1, Jim Clarke1,
Horizontal Milling Machines and Accessories
CLIC Workshop 2016, CERN 20th January 2016
10th Feb 2017, CLIC Implementation Meeting
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
The name of this driveline system is?
Permanent Magnet Quadrupoles and Dipoles for CLIC
Presentation transcript:

CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012

N. Collomb 07/11/ CLIC Permanent Magnet Quadrupole T2 October 2012 images Motor – Gearbox assembly (Bracket not shown for clarity) Left Hand – Right Hand threaded ballscrew Linear Ball race PM in Frame Assy

N. Collomb 07/11/ CLIC Permanent Magnet Quadrupole T2 Magnet shown in fully open position Magnet shown in fully closed position

4N. Collomb 07/11/2012 CLIC Permanent Magnet Quadrupole T2 A lot of thought has gone into individual components in the assembly context. Manufacturing tolerances and assembly adjustment has been incorporated from the start of the design. Datum faces and reference planes machined in – precise assembly and process specification required (including jigs and fixtures). Small ‘gap’ for height tolerances Recess and hole size to restrain yet connect solidly

5N. Collomb 07/12/2012 CLIC Permanent Magnet Quadrupole T2 Faceplate provisional ‘one piece’ design Yoke fastener holes Rail Bracket fastener holes (loose fit) Rail support brackets and alignment feature

6N. Collomb 07/11/2012 CLIC Permanent Magnet Quadrupole T2 Front view showing a number of principles of how to connect the driving side (ball-screw) with the centre (PM Frame) and driven side (Linear Bushing). Allow for ‘left-right’ alignment Allow for ‘into-out of page’ alignment issues

7N. Collomb 07/11/2012 CLIC Permanent Magnet Quadrupole T2 Grub-screws to adjust width and PM – Yoke gap x 4 per LM rail-carriage. Also used for parallelism alignment (during setup).

8N. Collomb 07/11/2012 CLIC Permanent Magnet Quadrupole T2 Glass envelope as per specification: 391x391x270mm We are ‘pushing’ the boundaries again with ‘bits sticking out. Integration check has shown no conflicts (Alexandre model). Need to check again when more detail design is complete!

9N. Collomb 07/11/2012 CLIC Permanent Magnet Quadrupole T2 Reducing the length (270mm) must be achieved. Proposal to reduce re- circulating linear motion system (HR2042 to HR1530). Forces to check! This would gain 4mm on either side => reduction to 262mm in length possible. Caveat; may need to increase other structural components.

10N. Collomb 07/11/2012 CLIC Permanent Magnet Quadrupole T2 Forces are “known” now => Sizing of components.

11N. Collomb 07/11/2012 CLIC Permanent Magnet Quadrupole T2 Detail design for components we know will not change has started. Drawings and requests for quote have been submitted to supplier. 1.Ballscrew 2.SF/LMF System 3.Motor & Gearbox 4.Coupling HR (recirculation linear ball bearing) can be next size down (HR1530)

12N. Collomb 07/11/2012 CLIC Permanent Magnet Quadrupole T2 Outstanding design decisions: 1.Do we want in situ width adjustment (would need to ‘split’ one piece face plate => reduction in stiffness)? No 2.Incorporate Linear Encoder, preferably on SF/LMF side. Yes 3.Inner and outer limit switches. 4.Encoder/brake on motor (need to do drive train calcs). 5.Permanent Magnet Frame to Ballscrew and SF/LMF interface. 6.Agree on division of shroud into presented components. 7.Keep magnet as single unit and ‘lose’ ability to split. 8.Envelope is very tight (Ballscrew end and SF end just protruding), Faceplate at max Magnet length (provisional) ‘Top piece’ = ‘Bottom piece’ ‘Centre piece’ same on both sides Not as much progress as desired. Need to carry out FEA with known forces.

CLIC Permanent Magnet Quadrupole T2 Quick check on raw material requirement shows: Top and bottom of shroud 61x162.2x190mm (8.3kg) – 4 off required Shroud side 39x190x300mm (16.2kg) – 2 off required Yoke 57x110x190mm (5.5kg) – 4 off required For wire erosion machining we need some more material (+12mm on all sides). Can obtain any shape from 90mm plate (AISI 1006 material). N. Collomb 07/11/

CLIC Permanent Magnet Quadrupole T2 N. Collomb 07/11/ mm flats for vertical and horizontal alignment Assembly considerations – lessons learned from high strength version MUST measure components BEFORE assembly commences and manufacture gauges accordingly. Permits use of assembly gauges to ensure inscribed radius is correct. Also eliminates 5 degrees of freedom (parallelism, perpendicularity). Similar principle to be used on shroud

15N. Collomb 07/11/2012 CLIC Permanent Magnet Quadrupole T2 Summary Progress slower than expected – will speed up next week Still a few decisions to make with regard to design principle – interface Permanent Magnet remains as is – could start tender process Progress with suppliers nearing end – in position to order components soon Magnetic Steel Material source to be identified – could order ‘larger blocks’ Auxiliary items to be incorporated in design – limit switches, linear encoder, … Need to carry out design validation - may lead to design iteration Detail design to be continued on items that will remain as is