WLTP-DTP-01-11 Test Procedure Development Methodology The DTP subgroup will undertake the following tasks: –Devise a methodology for the development of.

Slides:



Advertisements
Similar presentations
European Commission: DG Environment Monitoring, Reporting and Verification in the EU ETS: Status and Implementation Stakeholder Day on the EU MRG Cologne.
Advertisements

Session 5 :E-PRTR (EU-ETS) QUALITY CONTROL/QUALITY ASSESSMENT Iksan van der Putte.
WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants DTP12 - Status Report and Open Issues WLTP-DTP-AP Status Report and Open issues.
Worldwide Harmonised Test Procedure for Light Duty Vehicles WLTP EVE 2nd Session 13 of September Per Öhlund Co-chair Subgroup EV.
WLTP-DTP DTP Meeting 1 Wrap-up Reviewed general considerations, methodology and timing Reviewed proposals Created initial working subgroups Preparations.
GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
WLTP-DTP-14 Geneva, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)WLTP-DTP-14.
Starting note for WLTP phase 2 working items WLTP-08-41e Kazuki KOBAYASHI Vice chair of WLTP.
WLTP-E-Lab Sub Group Test procedure
Real-world emissions in the EU: An overview of recent evidence and policy implications Peter Mock, Anup Bandivadekar APEC VFEL Workshop Singapore March.
Revisions of the protocols Potential elements for strengthening emission reporting.
Carbon capture and storage - input to EUETS Directive review Penny Tomlinson.
FAO/WHO Codex Training Package Module 2.6 FAO/WHO CODEX TRAINING PACKAGE SECTION TWO – UNDERSTANDING THE ORGANIZATION OF CODEX 2.6 How does Codex elaborate.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-066 Leader: Per Ohlund / Kazuki Kobayashi.
WLTP 8th DTP Meeting Geneva, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
Old Annex 2 Reference Fuels moved to new Annex 3 Old Annex 3 Determination of System Equivalence moved to new Annex 9 New is Annex 2 Gear Selection, Shift.
Sergey Kakareka Anna Malchykhina Institute for Problems of Natural Resources Use & Ecology Minsk, Belarus 7 th JOINT UNECE TFEIP & EIONET Workshop on Emission.
WLTP - 5h DTP Meeting Zuerich DTP Subgroup LabProcICE slide 1 LabProcICE issues on DTP level Zuerich, April 2011.
1 EQF – Referencing criteria Criteria and procedures in 10 points to ensure that the information made public - is validated by the competent authorities,
WLTP-DTP Subgroup Additional Pollutants September 2011 WLTP-DTP Additional Pollutants Subgroup Validation phase 2? 2011 Bern, EU-WLTP 7 th DTP Meeting-13.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
Serving society Stimulating innovation Supporting legislation WCS TG editor Alexander Kotsev, Michael Lutz MIWP-7b sub-group meeting,
DTP/DHC update. DTP 13 th to 15 th April, EPA, Ann Arbor Chair: Michael Olechiw (co-chair from India unable to attend) No great advances were made in.
WLTP 4th DTP Meeting Geneva DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
WLTP 9th DTP Meeting Bern, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
NEDC/WLTP correlation process Meeting of TCMV on 17 November 2015
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa.
A new UN Global Technical Regulation on Worldwide harmonized Light vehicles Test Procedures (WLTP) Transmitted by the WLTP UN GTR draft manager Informal.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN DTP12 Report to GRPE 17th January.
Summary of 3 rd Informal Group on WLTP 11 June 2009 Palais des Nations, Geneva Informal document No. GRPE (58th GRPE, 9-12 June 2009, agenda item.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings Energy performance of buildings Guidelines.
WLTP-DTP Results from DTP Session 1. WLTP-DTP First Test Procedure Meeting Overview  Hosted by USEPA in Ann Arbor on the 13 th, 14th, and.
2013 年 6 月 12 日 所内フォーラム nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half WLTP-gtr.
WLTP - Validation Phase 2 (acceptability of the new test procedure)
DTP Conventional Engines HEV/PHEV/EV Reference Fuels PM/PN
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
National System and QA/QC: The Netherlands
Air Pollution Control and NIR Division
Welcome to the 10th Meeting of WLTP DTP 6th June 2012 UNOG Geneva
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-012
WLTP - Validation Phase 2 - Analysis of results
Informal document No. GRPE (70th GRPE, January 2015, agenda item 3(b))
Informal document GRPE-77-21
Feed-back approach on RLD
Positions on open points WLTP DTP subgroup LabProcICE
Consideration of ‘Family’ in gtr
National System and QA/QC: The Netherlands
Submitted by the experts of OICA
Proposal EV/PHEV/HEV/FCV Lab Process Sub-Group
LIGHT DUTY ELECTRIC AND HYBRID VEHICLES
HDV CO2 certification CoP provisions
Additional Pollutants Subgroup 7th DTP Meeting-13 September
Mandate & Outputs expected for 2004
WLTP GTR 15 WLTP-09-18e Report by Drafting Coordinator, Serge Dubuc
GRPE/WLTP-IG/ DHC subgroup
Working Paper No. WLTP-05-11e
A.1 to 3: Statement of technical rational and justification
WLTP-DTC Air Pollution Control and NIR Division
Status Report Cop Taskforce
Informal document GRPE-79-11
Reg. EC 1151/2017 Annex I subpar Annex I subpar 4.2
Lab Process Internal Combustion Engines
Establishment of Subgroup “Drafting”
WLTP DTP – Lab Process ICE
Palais des Nations, Geneva
WLTP - Validation Phase 2 - Analysis of results
UNECE WLTP COP task-Force Revision on testing Frequency
Presentation transcript:

WLTP-DTP Test Procedure Development Methodology The DTP subgroup will undertake the following tasks: –Devise a methodology for the development of a worldwide harmonized light-duty test procedure; –Synthesize input from all WLTP DTP subgroup members; Develop and validate a world harmonized light-duty test procedure (activities to include validation, confirmation and round-robin tests).

WLTP-DTP Test Procedure Development Methodology Working methods –Separation of tasks between DHC and DTP is required. –Working subgroups will be required to address specific issues. Subgroups will work independently and report to the main DTP group. –Main WLTP-DTP group will be responsible for overall coordination of the subgroups, consistent drafting of the procedures, and resolution of generic issues.

WLTP-DTP Test Procedure Development Methodology Terminology –Complete terminology reference document Units –SI units will be used Emissions constituents –Criteria emissions, CO2, and fuel consumption

WLTP-DTP Test Procedure Development Methodology Requirements for the DTP –Default test procedures of the WLTP-GTR must be defined with sufficient accuracy that future European legislation can refer to them in an editorially transparent and consistent manner. - per EU input –WLTP-GTR will be an international document and as such should reflect ISO standards.