Status quo in Austria Barbara Kéri DISC´13 Belgrade December 3, 2013.

Slides:



Advertisements
Similar presentations
The White Paper – a policy paper to contribute to the integration process of the WBC in the ERA Dr. Erika Rost, Dr. Andreas Kahle Federal Ministry of Education.
Advertisements

London, first of December 2008 Quality Assurance in Higher Education Bruno CURVALE Head of International Affairs at AÉRES Agence dévaluation de la recherche.
Transport TEN-T Info Day Brussels 29 November 2012 RIS - Inland Waterways.
Activities of the Danube Commission (DC)
1 5 years Inland Navigation Europe General Assembly Liège, 5 December 2005.
Platform for the implementation of NAIADES European support for modernising the inland fleet by PLATINA Michael Fastenbauer Deputy Chairman PLATINA Management.
„South East Europe Programme” as a financing opportunity for projects in the Danube region and complementarity to other instruments COMPLEMENTARITY OF.
IRIS Master Plan IRIS Master Plan Workshop Bulgaria 5th of May 2005 Dieter Hintenaus.
National status and activity report Romania Belgrad, December, 2012.
RIS Implementation survey and policy evaluation RIS workshop Italy October 2012 Sandra van Putten/Panteia-NEA.
Project presentation. Network of Danube Waterway Administrations – data and user orientation SVP via donau OVFRSOE AVP Plovput ACN EAEMDR AFDJ Photo credits:
EU Strategy for the Danube Region Priority Area 1a – To improve mobility and multimodality: Inland waterways Ministerul Transporturilor si Infrastructurii.
1 CO-WANDA Stakeholders‘ Workshop Workpackage 5: International Danube Ship Waste Convention Activity 5.1. Formation of an International Implementation.
Dr. Michael Fastenbauer Mantova, RIS in Austria.
National Status and Activity Report Republic of Serbia Zoran Lukic / Plovput DISC 12, Vukovar, 13/12/2012.
Platform for the implementation of NAIADES 
National status and activity report Romania Vukovar, December, 2012.
Future of RIS Róbert Rafael Director for Projects and Development RSOE Budapest, 11 th April 2011.
INTERIM MEETING/ VIENNA NEXT STEPS in the PROJECT IMPLEMENTATION.
Current state of play in the NtS Expert Group Danube Commission RIS Workshop Budapest 11 th April 2011.
3rd TG Meeting and 2nd Project Coordination Team Meeting Enns - 7 and 8 March, 2012 Project DaHar Prof. Dr.- Ing. Milosav Georgijevic WP3 - A 4 DaHar PP:
Periskal at a glance Software company, head office Belgium, sister companies in Serbia, Rumania and Ukraine Since 1990, focus on Inland ECDIS systems.
Company LOGO NELLIP Network of Language Label Projects and Initiatives Intercultural Horizons Conference, Siena, 7 October 2013.
INTERIM MEETING/ VIENNA PART 1 THE STATUS of the PROJECT IMPLEMENTATION.
Thematic Pole 7: Multimodal Accessibility to Primary networks SEE POLE 7 projects results and capitalization for improved accessibility across the region.
Status of RIS in the Czech Republic
Paper charts & Atlas of berth Budapest, , Stefan Polhorsky / SVP, s.p.
State of the Art Study TG1 - logistical infrastructure of ports and port operation models.
Streamlining Climate Change Adaptation into RBM: European Perspective Birgit Vogel (MRC) Raimund Mair (ICPDR) 6 th Sharing & Learning Seminar Asia Pacific.
1 INDRIS Inland Navigation Demonstrator for River Information Services Cas Willems Transport Research Centre Ministry of Transport The Netherlands.
TTnet - Training of Trainers Network TTnet Czech Republic Launching Conference Prague, 21 January 2005 The Training of Trainers Network - TTnet: Objectives,
1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.
“RIS ACTIVITIES IN PLATINA II PROJECT” RENATA KADRIĆ INLAND NAVIGATION DEVELOPMENT CENTRE (CRUP) 13/11/13, ZAGREB.
National Status and Activity Report Republic of Serbia Zoran Lukic / Plovput DISC 13, Belgrade, 03/12/2013.
1 IRIS Europe 3 – Implementation of River Information Services in Europe The European Union's TEN-T programme supporting …
WANDA - project overview and status Dr. Harald Beutl via donau – Österreichische Wasserstraßen-Gesellschaft mbH Budapest, Projektstatus “WANDA”
Selected Activities of the Sava Commission DANUBE INFORMATION SERVICES CONFERENCE – DISC, Belgrade, 3rd-4th December, 2013.
Current status of RIS in Croatia Danube Summit May/June 2010.
PROPOSAL for the establishment of the ENGINE (European Network for Green Infrastructure KNowledge and Experience) Eleftherios Loizou Managing Director.
Supported by The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of the Community. The.
Status report Slovakia
Jean-Michel Courades, DG AGRI F3 European Rural Development Network
O Transnational strategy for „Airport City‟ development Giuseppe Luppino - ITL.
Sergey Tzarnakliyski Belgrade, December 4, 2013 Danube Commission, Budapest Selected Activities of the Danube Commission Steps towards sustainable Mobility.
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
Platform for the implementation of NAIADES River Information Services in Europe – results of a survey Andreas Bäck Deputy Project Coordinator of PLATINA.
COORDINATOR Kick-off meeting/ Bucharest/ Project: FIRST STEP TO FIRST JOB – Innovative methods leading YOUTH to a solid career VS/2012/0017.
Horst Schindler Vukovar, December 12, 2012 Danube Commission, Budapest Selected Activities of the Danube Commission Steps towards sustainable Mobility.
Platform for the implementation of NAIADES State of Play of RIS in Europe RIS Workshop of the Danube Commission Budapest, 11th of April 2011 Andreas Bäck.
RSOE Status Report Hungary Belgrade, Roles of RSOE in IWT projects ProjectRSOE role WP5 Leader, Partner Communication Leader, Partner SuAc.
ETC/CCA Main activities June June 2015 Silvia Medri (CMCC) ETC/CCA Manager Eionet WS on CCIVA Copenhagen, June 2015 European Environment Agency.
Belgrade, December , 2013 EAEMDR Status Report Bulgaria.
Danube navigation possibilities, overview of Hungarian relevant projects and initiatives Gergely Mező Head of Project Management NATIONAL ASSOCIATION OF.
JOINT STATEMENT FOLLOW UP MEETING `09 Horst Schindler, Ivana Tomic Budapest, January 29, 2009 Danube Commission, Budapest.
Part-financed by the European Union (European Regional Development Fund) PartiSEApate Project Indicators How to measure our success !?! 2. PP Meeting,
 ROAD SAFETY: the European Union Policy European Commission, Directorate General for Mobility & Transport «Road Safety.
9-10 October 2003 ePortfolio October 2003 ePortfolio The ePortfolio for a Learning Society European instruments to enhance mobility and employability.
RIS & IWW TEN-T Calls 2012 Open Annual and Multi-annual Calls for Proposals Nadia Chellafa – Project Manager – Ten-T Executive Agency.
Janeta Toma – DSP Co-financed by the European Union and Land Baden-Württemberg 3 rd Business Conference Transport & Logistics of South East Europe and.
Barbara Kéri • DISC´12 Vukovar December 12, 2012
The Contact Point of the European Network for Rural Development Transnational Cooperation under Leader Axis Leader sub-committee November Martin.
Regulated Professions Database
DISC ´12 NEWADA duo Work Package 5 – User services based on ICT
News from the Sava Commission
The AEOLIX project & Living Lab 12
András Zsigmond (DG GROWTH, Unit E5)
Sylvia Barova Unit B.3 – Nature DG Environment, European Commission
European Commission activities
Concrete steps towards simplification, harmonisation and digitalisation of border controls Belgrade | 4th December 2018 | Simon Hartl.
UWWTD SIIF 2nd Workshop 24 October 2013
Presentation transcript:

Status quo in Austria Barbara Kéri DISC´13 Belgrade December 3, 2013

EU projects IRIS EU 3 NEWADA duo CO-WANDA HINT

IRIS Europe 3 status in AT Bathymetric IENCs: Feasibility study elaborated; pilot implementation to be done in coord. with ECDIS viewer comp. Water Level Model of Wachau evaluated and fine-tuned; WLM east of Vienna to be finalised; WLM web service operational IENC data exchange concept available, pilot implementation to be done in coordination with ECDIS viewer companies Implementation of national berth management database on-going

IRIS Europe 3 status in AT Implementation of Virtual Reference Station System on-going Navigational Support Services specified and to be piloted Implementation of mobile RIS App on-going Continuous enhancement of national RIS infrastructure based on identified quality criteria

IRIS Europe 3 status in AT Enhancement of national and international RIS Data Exchange on-going towards provision of specific services for logistics stakeholders and authorities Evaluation, further enhancement and pilot implementation of RISING services Main goal is to bring international RIS Data Exchange into operation in the first half of 2014 whereas the following countries have already implemented related infrastructure: AT-SK-HU-HR- RS-RO-BG Continuous contribution to the work of the RIS Expert Groups Organisation of national RIS Stakeholder Workshops

NEWADA duo in AT Atlas of berths Paper charts WLAN FIS portal

Current project status Supporting the “Public consultation regarding the recognition and modernisation of professional qualifications in inland navigation“ of the European Commission, Establishment of an ADN Inland Navigation training tool “Creating Examination Questionnaires“ Deployment of eLearning services (INeS Danube)

Current project status Danube School Ship and Simulator Concepts Best practices (Study visit to BE/ NL) Transnational requirements (= interviews: AT till RO) Concept outline for future Danube School Ship and Inland Navigation simulators Source: via donau Source: HINT Website

Thank you for your attention! Barbara Kéri Phone: