National Status and Activity Report Republic of Serbia Zoran Lukic / Plovput DISC 12, Vukovar, 13/12/2012.

Similar presentations


Presentation on theme: "National Status and Activity Report Republic of Serbia Zoran Lukic / Plovput DISC 12, Vukovar, 13/12/2012."— Presentation transcript:

1 National Status and Activity Report Republic of Serbia Zoran Lukic / Plovput DISC 12, Vukovar, 13/12/2012

2 Notices to Skippers http://nts.risserbia.rs/

3 Electronic Reporting Eri DGW - https://eridgw.risserbia.rshttps://eridgw.risserbia.rs

4 Hull Database http://hull.risserbia.rs European Ship Identification Number - ENI

5 ENCs  Complete coverage of Serbian International Waterway Network –Danube River –Sava River –Tisa River

6 AIS Network in Serbia 18 AIS basestations, full coverage of the Danube and Sava River

7 AIS Tracking and Tracing

8 AIS Tracking and Tracing - WEB

9 Lock Management System Installed at two locks on the Serbian Danube

10 IALA Beacon nearby Belgrade

11 RIS Centre in Belgrade

12 Additional features  dGPS correction over AIS  D4D webportal  RIS index  Integrity monitoring system  Trouble ticketing and alarming system  …  One WLAN hotspot installed at Iron Gate lock within NEWADA Project

13 Ship equipment programme  AIS Transponder + ECDIS in information mode  Governmental vessels –47 vessels equipped  Commercial vessels –117 vessels equipped, out of 180 applied

14 Future Agenda?  RIS operations and deployment  AtoNs –Pilot (NEWADA Duo) –Full implementation  Second WLAN hotspot installation (NEWADA Duo)

15 NEWADA Duo - Remote AtoNs  Boys to be equipped  Broadcasting information thru AIS msg. 21 –Visible to the skipper on the ECDIS screen –Visible to the Waterway administration in the operator room via AIS network

16 NEWADA Duo - Remote AtoNs Serbia Belgrade Centre Giurgiu Centre Ruse Centre AIS WEB INTERFACE PILOT

17 NEWADA Duo - Virtual AtoNs

18 Serbia Belgrade Centre Giurgiu Centre Ruse Centre AIS WEB INTERFACE PILOT

19 National - AtoNs Roll-out  Project proposal for full roll-out of AtoNs on the Danube (Remote AtoNs and Virtual AtoNs)  Timeframe 2014-2016  Budget approx. 3MEur, IPA funds  Three projects –Supplies of equipment –System integration –Supervision

20 WLAN installation Iron Gate 2 lock

21 Questions and Discussion