CBM RICH working group GSI, Germany Bergische Universität Wuppertal (BUW), Germany Hochschule Esslingen (HSE), Germany PNPI Gatchina, St. Petersburg, Russia.

Slides:



Advertisements
Similar presentations
NuSTORM March 2013 CERN Welcome and introduction.
Advertisements

Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
D.Websdale: RICH Meeting LHCb RICH group meeting: Wednesday 10th November, in B40-SS-C01 at 14:00. Agenda: 1. The Photodetector Panel’s proposition.
Muon Detector R&D Vishnu V. Zutshi NIU/NICADD. RPC based.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu,
Status report on WLS studies and mirror development P. Koczon, C. Höhne – GSI Darmstadt M. Dürr – HS Esslingen.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
RICH Development Serguei Sadovsky IHEP, Protvino CBM meeting GSI, 9 March 2005.
Development of a RICH detector for electron identification in CBM Claudia Höhne, GSI Darmstadt CBM collaboration CBM-RICH group Bergische Universität Wuppertal,
RICH Status Report Claudia Höhne, GSI for the CBM RICH group GSI, Germany Bergische Universität Wuppertal (BUW), Germany Hochschule Esslingen (HSE), Germany.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
The Enhanced RICH System for the LHCb Upgrade On behalf of the LHCb RICH Group Introduction Opto-Electronics and DAQ The Elementary Cell (EC) The Photon.
Claudia Höhne CBM collaboration meeting Dubna, October RICH workgroup program TimeNameTitle 9:00Claudia Höhne (GSI)Status report RICH R&D: - RICH.
RICH Status Report Claudia Höhne, GSI for the CBM RICH group Bergische Universität Wuppertal (BUW), Germany GSI, Germany Hochschule Esslingen (HSE), Germany.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Cherenkov Counters for SoLID Z.-E. Meziani on behalf of Simona Malace & Haiyan Gao (Duke University) Eric Fuchey (Temple University) SoLID Dry Run Review,
RICH SIMULATION USING GEANT4 S.EASO, RAL OBJECTIVES OF THE SIMULATION. CURRENT STATUS AND PLANS. INTEGRATION WITH LHCb SOFTWARE. SUMMARY.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
ATLAS micromegas activities (MAMMA)
Results from first beam tests for the development of a RICH detector for CBM J. Eschke 1*, C. Höhne 1 for the CBM collaboration 1 GSI, Darmstadt, Germany.
1 13 June 2011 ALICE ITS Upgrade Proposal Work organization  Document scope  Timeline  Editorial board and work organization  Status (next presentations)
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
Preparations for Detector R&D Committee Meeting Dec Craig Woody BNL TPC/HBD Upgrade Working Group Nov 26, 2002.
SiD R&D Priorities Andy White University of Texas at Arlington SiD Workshop at SLAC March 2009.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Possible structures of a neutron star Exploring dense nuclear matter The Compressed Baryonic Matter Experiment atom: m nucleus:
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Reported by G.Feofilov at the NA61 meeting , CERN, EVO.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
PNU RICH Detector R&D Status Pusan National University Kwangyoung Kim*, Kunsu Oh, KyungEon Choi Jongsik Eum, Sanguk Won, Jihye Song, Jiyoung Kim, Bong-Hwi.
Micromegas for SLHC A project to investigate the use and determine the working parameters of Micromegas for SLHC tracking – in conjunction with the ATLAS.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
Trigger & Tracking detector for CMS
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
for the HADES Collaboration
Event reconstruction for the RICH prototype beamtest data 2014
DT-LHCb coordination meeting 18 April 2016
Organization and Goals for the Workshop
PANDA Muon Group Meeting, Protvino 7 June 2011 G
The European DHCAL status
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
TileCal upgrade EVO meeting Demonstrator tesks
IHEP group Shashlyk activity towards TDR
Simulation results for the upgraded RICH detector in the HADES experiment. Semen Lebedev1,3, Jürgen Friese2, Claudia Höhne1, Tobias Kunz2, Jochen Markert4.
Toward the final design of a TPC for the ILD detector
Directional Optical Module Integration
Upgrade of the GlueX Spectrometer for Physics with Strange Final States Nuclear Physics Yi Qiang Nov. 13, 2011.
Perugia SuperB Workshop June 16-19, 2009
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

CBM RICH working group GSI, Germany Bergische Universität Wuppertal (BUW), Germany Hochschule Esslingen (HSE), Germany PNPI Gatchina, St. Petersburg, Russia Pusan Natl. University (PNU), Korea (IHEP Protvino, Russia)

14th CBM collaboration meeting, Split, October 2009 RICH working group RICH Workgroup Tuesday, October 6, 2009 PresentationSpeaker 11:00 – 11:30Coffee 11:30 – 11:45Introduction of Wuppertal group and R&D PlansK.-H. Kampert/ J. Rautenberg (Univ. Wuppertal) 11:45 – 12:00Status report on Mini RICHI.K. Yoo (Natl. Univ. Pusan) (EVO) 12:00 – 12:15Status report on mechanical designE.Vznuzdaev (PNPI) 12:15 – 12:30Results with n-XYTER readout of MAPMT in Lab and TestbeamJ. Eschke (GSI) 12:30 – 12:45WLS studies (+ brief information on status of mirrors)C. Höhne (GSI)/ M. Dürr (HSE) 12:45 – 13:00Discussion on RICH R&D (probably to be extended during lunch (and dinner(s))): - status and next steps - coordination of activities - path towards IMoU and TDR - preparation of Technical Board meeting on Thursday, October 8 13:00Lunch

14th CBM collaboration meeting, Split, October 2009 Timelines/ Milestones (→ IMoU) prototypes of subsystems (photodetector, mirror + support) – Spring/Summer 2010 complete RICH prototype and tests in testbeam - Spring/Summer 2011 RICH design simulations of limiting factors - end of 2010 RICH engineering design - Autumn 2011 TDR - End of 2011 be able to apply for funding for detector building in 2012 finish detector building until 2016 (?)

14th CBM collaboration meeting, Split, October 2009 Plans Preparation of complete RICH prototype to be tested in electron/pion beam at GSI, CERN or elsewhere (Europe): PMT plane of 3x3 or 4x4 H8500 with n-XYTER readout (electronics to be improved for an upgraded prototype) (Wuppertal, GSI) mirror prototyopes from Compas (HS Esslingen) mirror mount (PNPI Gatchina) gas vessel, gas system (PNPI Gatchina) design (GSI, PNPI Gatchina, Wuppertal) RICH prototype at Pusan, Korea test specifications for gas system (gas purity and controls, stability and control for temperature, pressure,…)

14th CBM collaboration meeting, Split, October 2009 Plans (II) → enables us for a preparation of a TDR till the end of 2011 → test mechanical integration, working conditions of complete system, evaluate simulations,…… Further investigations in the lab: characterization of possible PMT options (q.e., collection efficiency, uniformity, wls films, sensitivity to magnetic field (shielding?),…) optimize readout electronics, specify requests for RICH suitable CBM-xyter chip mirrors (thickness, mirror mount,…), adjustment and alignment system controls → please read carefully IMoU draft and send your comments! → set up detailed list of tests/ measurements needed for final design/ decision on options/ design….