PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.

Slides:



Advertisements
Similar presentations
STAR W.B. Christie, BNL RHIC/AGS Users Meeting June 4, STAR Goals and Performance, 2009 Run Outline Summary of STAR Goals for RHIC Run 9 Brief Summary.
Advertisements

J/  measurement with the PHENIX muon arms in d-Au interactions at √ s NN = 200 GeV David Silvermyr, LANL APS April Meeting Philadelphia, April 5-8, 2003.
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
Measurement of charmonia at mid-rapidity at RHIC-PHENIX  c  J/   e + e -  in p+p collisions at √s=200GeV Susumu Oda CNS, University of Tokyo For.
Heavy flavor production in sqrt(s NN )=200 GeV d+Au Collisions at PHENIX DNP 2013 Matthew Wysocki, Oak Ridge National Lab Newport News, Virginia, Oct 25,
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Υ Measurements at PHENIX Shawn Whitaker RHIC/AGS Users’ Meeting June 20, /20/20111Shawn Whitaker - RHIC/AGS Users Meeting.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
J/  measurement in d-Au interactions at s NN = 200 GeV David Silvermyr, LANL Physics Motivation - J/  production, gluon shadowing. Run-3 d-Au (2003)
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Performance of PHENIX High Momentum Muon Trigger 1.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
October 14, 2004 Single Spin Asymmetries 1 Single Spin Asymmetries for charged pions. Overview  One physics slide  What is measured, kinematic variables.
The W program at PHENIX R. Seidl (University of Illinois and RBRC) for the PHENIX Collaboration Workshop on Parity Violating Spin Asymmetries BNL, April.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
LANL Nuclear Physics 15/10/2006 Cold Nuclear Matter Physics Cold Nuclear Matter Physics Mike Leitch LANL Medium Energy Nuclear Physics Cold Nuclear Matter.
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Ralf Averbeck Stony Brook University Hot Quarks 2004 Taos, New Mexico, July 19-24, 2004 for the Collaboration Open Heavy Flavor Measurements with PHENIX.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Performance of PHENIX High Momentum Muon Trigger.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
1 PHENIX Status Ed O’Brien for John Haggerty Brookhaven National Laboratory June 23, 2009.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Performance of PHENIX High Momentum Muon Trigger.
Measurement of the Double Longitudinal Spin Asymmetry in Inclusive Jet Production in Polarized p+p Collisions at 200 GeV Outline Introduction RHIC.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Mid-rapidity pi0 production in pp collisions at sqrt(s)=62 and 200 GeV measured by the PHENIX detector at RHIC A.Bazilevsky Brookhaven National Laboratory.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
Low Mass Vector Mesons Nuclear Modification Factors in d+Au 200GeV Lei Guo Los Alamos National Laboratory PHENIX Collaboration.
Muon Arm Physics Program Past, Present + Future Patrick L. McGaughey Los Alamos National Laboratory Santa Fe June 17, 2003.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
W. Xie (Riken-BNL Research Center) for PHENIX Collaboration
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
Y. Akiba (RIKEN/RBRC) Radiation Lab meeting 2016/06/30
p0 ALL analysis in PHENIX
Presentation transcript:

PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p is the weakest part of baseline p+p was disappointing polarization was very poor a strong p+p run with ample beam/polarization development is a must for the future PHENIX efficiency for recording useful luminosity up from 50% in past to 68% now (33% in ±30 cm) DAQ developments continue to push to higher event rates but tighter z-vertex requirements in the future will lower fraction of luminosity that is useful THANKYOU to CA for a great (d+Au) Run!! 5/29/20081PHENIX - MJL

5/29/ nb -1 Run8 dAu: 30x Run3 140% of Run8 goal 160 Billion Evts dAu peaks above 3 nb -1 per day one day > total Run3 luminosity of 2.7 nb -1 RunEnergyLong.Trans GeV0.15 pb GeV0.35 pb GeV0.12 pb GeV3.4 pb pb GeV7.5 pb pb GeV0.08 pb pb GeV5.2 pb pb GeV p+p Transverse Vertical luminosity recorded (1.1 pb -1 FOM) Peak luminosity per day ~0.37 pb -1 pp - almost no progress on luminosity & polarization development towards future PHENIX - MJL

5/29/ ,000 J/    For all data 63 nb -1 6,000 J/   ee from all data 59 nb GeV d+Au 4.8 pb -1 13,000 J/    +  - for all data ( 22,000 in Run6) 200 GeV p+p PHENIX J/  ’s from Run8 PHENIX - MJL

5/29/ GeV d+Au Live Time – 89% PHENIX up – 77% Overall – 68% 200 GeV p+p Live Time – 89% PHENIX up – 69% Overall – 62% (where 10% correction for loss due to CNI measurements is made) PHENIX - MJL Efficiency for Run8 d+Au and p+p Black vertical lines are markers for Maintenance and/or APEX days About 50% of CA delivered luminosity is useful luminosity within our ±30 cm vertex range Given that, PHENIX efficiencies in Run7 were: d+Au p+p

North arm HV Repairs (bad channels in yellow): Almost All of North Arm Now Good except for one station-2 section (N222-6) [N182-6 is actually ok even though it shows disabled (yellow) here] problems fixed by removing AC coupling capacitors for (descoped) anode readout end of 2008 Run Now

South Muon arm HV partially fixed – will finish in next shutdown end of 2008 Run Now

5/29/20087 Muon W-Trigger FEE Upgrade – Final Prototype Test During Run8 PHENIX - MJL

8 MuTRG ADTX MuTRG MRG Level 1 Trigger Board Data Collecting Module MuTr FEE B 2 plane 5% 95% Trigger LV1 Trig accept IRCounting House Optical 1.2Gbps Amp/Discri. Transmit Data Merge PHENIX Muon trigger 8 LV1 Trig accept Local DAQ

91/29/2009 MuTrigger FEE Support

CNM Constraints from New Run8 d+Au J/  Data expected accuracy simulation Expected improvement in CNM constraints (red) compared to Run3 (blue) simulation J/  d+Au J/  J/  5/27/200810Mike Leitch - LANL

1/23/200911Mike Leitch - LANL PHENIX & STAR Preliminary  p+p Cross Sections 1st Upsilons at RHIC PHENIX    2005 STAR 2006 PHENIX Preliminary p+p QM05  Upsilons from Run8 d+Au? (online spectrum) +-+- ±±±±

12/7/200812MJL PHENIX Internal MJL

12/7/200813MJL PHENIX Internal MJL

12/7/200814MJL PHENIX Internal MJL