ROCK KOSHKONONG LAKE DISTRICT Lake Dredging Project.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Ash Recovery At Kingston Fossil Plant Kingston, Tennessee
Natural Gas Drilling Activities - A State Perspective Ryan Benefield, P.E. Deputy Director, Arkansas Department of Environmental Quality
IMS Versi-Dredge Self-Propelled Transportable Versatile Model 5012 LP Versi-Dredge DREDGER / HARVESTER Combination Unit Versi-Dredge.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
BEFORE AFTER. New Effluent Limitation Guidelines On November 28th, 2008, the EPA issued a proposed regulation which strengthened the existing National.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
UWS AQUACLEANER “Leaders in the field of Waterfront Restoration Technology”
Calaveras County Water District Capital R&R Program Funding Options March 25,
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
Part III Solid Waste Engineering
Lake Whetstone Sediment Removal by Hydraulic Dredging
Location : a small lake situated about 10 kilometers downstream of a paper-mill Paper-mill handled the recycling of waste paper containing PCBs How serious?
Hydroraking Sub-committee Dave McDonald Dana Dudley Ron PearsonTom Nowd Suzanna Dudley Bob Novacek Phyllis AndellaMario Andella Mike NaultJim LeBlanc March.
Progress Report – Design of Native Wetland Nursery Facility Design of Native Wetland Nursery Facility For Metro’s Native Plant Center Prepared by: Portland.
Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Coastal & Port Engineering Considerations of the Jacksonville Harbor Deepening Study Kevin Bodge, Ph.D., P.E. Port & Coastal Engineer Senior Vice President.
A portable 6-inch diesel-powered trash pump was used to pump water from Little Topashaw Creek for gully erosion tests February 4 and 5, 2002.
Bob Evans, Director Lexington Field Office Office of Surface Mining Reclamation & Enforcement.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
September 9, 2009 Report on SWGWTP Deep Well Drilling Phase 2.
Experimental Example #1. MNB water tank outline chart *Usage Pump (electric pumps, pump engine) 1.5 kw ~ 5kw *MNB devices: pieces The number of.
GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.
Construction Site Best Management Practices and the Project Design Process.
Fluid Mechanics –I Surveying –I Mechanics of Solids Building Materials
Dredging Engineering: Building & Maintaining Underwater Highways
Consideration Of The Aggregate Recycling Systems Illegal Disposal Site For The Solid Waste Disposal and Codisposal Site Cleanup Program and Augmentation.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
Nikolaus Sires ET-493 Advisor: Dr. Rana Mitra. Problem 1 The site of this senior project is a pond of approximately three acres. I desire to remove one.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Potential Impacts of a Seawater Intake Structure and a Brine Disposal System for the Proposed Desalination Plant at Mile 6, Swakopmund Marine Ecological.
1.  Residual Solids Management Plan – RSMP (2014)  Pilot-Scale Screw Press Evaluation  Residual Disposal Options  Recommendations 2.
Nashville Zoo at Grassmere Stream and Water Quality Improvements Quality Improvements Littlejohn Engineering Associates, Inc. Civil & Environmental Consultants,
Marin County Watershed Stewardship Program Marin County Department of Public Works.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
MAXIMIZING THE ECONOMICS OF CLEAN WATER USING A HYDRAULIC DREDGE AND A MECHANICAL DEWATERING PLANT: CASE STUDY OF LAKE DELAVAN, DELAVAN WISCONSIN PIANC.
Sediment Management in Prado Basin and Lower Santa Ana River Greg Woodside, P.G., C.Hg Executive Director of Planning & Natural Resources September 20,
Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
December 14, 2015 W E L C O M E SIMONTON LAKE H.O.A.
Cleaning up the Lower Fox River Greg Hill, Wisconsin DNR Winnebago Project University of Wisconsin Oshkosh, May 23, 2008.
Culler Lake Bathymetry: Potential Changes Following Dredging Spring 2013 Sampling Methods Class: J. Bruland, M. Dybala, N. Gunther, A. Hoffman, J. Jones,
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Hydrology & Water Resources Engineering ( )
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
Carolina Beach Lake Dredging Project Town of Carolina Beach, NC & SEGi Town of Carolina Beach.
UPPER NEWPORT BAY ECOSYSTEM RESTORATION PROJECT NEWPORT BEACH CITY COUNCIL STUDY SESSION FEBRUARY 14, 2006.
Integrated Watershed Management
Little Rapids Habitat Restoration St
Municipal Utilities Department June 24, 2008 Agenda Item 9.02
Prepared for the Rock Koshkonong Lake District
John Tinger U.S. EPA Region IX
3.3 Interpreting the Unit Rate of Slope
Kastanis- Existing Conditions
Stream Crossing Replacement Policy
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

ROCK KOSHKONONG LAKE DISTRICT Lake Dredging Project

Lake Koshkonong Dredging Project Phases of Work PHASE I PHASE I –Establish goals and objectives –Confirm funding sources –Assess feasibility of obtaining permits PHASE II PHASE II –Confirm areas and sequence of dredging –Assess physical and chemical characteristics of sediment –Confirm disposal methods and areas –Prepare options analysis –Prepare dredging plans and specifications –Obtain permits PHASE III PHASE III –Competitive bidding process –Services During Construction (as requested)

RSV ENGINEERING, INC. Illustrations & photos courtesy of Keene Engineering

RSV ENGINEERING, INC. Illustrations & photos courtesy of Keene Engineering

RSV ENGINEERING, INC. Illustrations & photos courtesy of Keene Engineering

RSV ENGINEERING, INC. Illustrations & photos courtesy of Keene Engineering

RSV ENGINEERING, INC. Illustrations & photos courtesy of Keene Engineering

General Information Regarding Hydraulic Dredging A 8”-10” hydraulic dredge (diameter of discharge hose) can dredge cubic yards per hour. A 8”-10” hydraulic dredge (diameter of discharge hose) can dredge cubic yards per hour. A 12”-14” hydraulic dredge can dredge up to 500 cubic yards per hour. A 12”-14” hydraulic dredge can dredge up to 500 cubic yards per hour. A lake the size of Lake Koshkonong may require the use of multiple dredges. A lake the size of Lake Koshkonong may require the use of multiple dredges. The cutter head is guided through the use of GPS, underwater cameras, and visual aids. The cutter head is guided through the use of GPS, underwater cameras, and visual aids. Slurry (sediment & water) can be pumped about 3,000 feet before a booster pump is required. Slurry (sediment & water) can be pumped about 3,000 feet before a booster pump is required.

General Information Regarding Hydraulic Dredging Slurry is generally pumped at a min. flow rate of 14 feet/sec to allow transport of gravelly material. Slurry is generally pumped at a min. flow rate of 14 feet/sec to allow transport of gravelly material. Slurry can be pumped into sedimentation basins, lake structures, or geo-bags. It can also be transported to landfills, farm fields, etc. Slurry can be pumped into sedimentation basins, lake structures, or geo-bags. It can also be transported to landfills, farm fields, etc. The umbilical (discharge hose) will be floated for several hundred feet before going under the water. The umbilical (discharge hose) will be floated for several hundred feet before going under the water. Fishing will be impacted in the close proximity to the dredge. Fishing will be impacted in the close proximity to the dredge. Hydraulic dredging minimizes turbidity (suspended solids) in the water over the use of alternative dredging methods. Hydraulic dredging minimizes turbidity (suspended solids) in the water over the use of alternative dredging methods.

Dredge Rates Hours Required To Dredge 1 Acre at Various Depths and Rates DredgeQuantity Dredge Quantity Per Hour Depth cu yds 100 cy/hr 200 cy/hr 300 cy/hr 400 cy/hr 500 cy/hr (ft)(yds)(hrs)(hrs)(hrs)(hrs)(hrs)

Dredge Rates Dredge Depth = 0.5 feet % Lake to Dredge 24-Hour Days Required DredgeArea 100 cy/hr 200 cy/hr 300 cy/hr 400 cy/hr 500 cy/hr (%)(acres)(days)(days)(days)(days)(days)

Dredge Rates Dredge Depth = 1.0 feet % Lake to Dredge 24-Hour Days Required DredgeArea 100 cy/hr 200 cy/hr 300 cy/hr 400 cy/hr 500 cy/hr (%)(acres)(days)(days)(days)(days)(days)