Superconducting Quadrupoles inside the HERA Experiments M. Bieler, DESY, LHC LUMI 05 Workshop, Arcidosso, September 2005 - The HERA Interaction Region.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

Cryogenic Experts Meeting (19 ~ ) Heat transfer in SIS 300 dipole MT/FAIR – Cryogenics Y. Xiang, M. Kauschke.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Quadrupole Magnetic Design for an Electron Ion Collider Paul Brindza May 19, 2008.
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
Progress on the MICE Cooling Channel Solenoid Magnet System
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
October 30 th Advances in Heat Transfer in High Field Accelerator Magnet B. Baudouy CEA/Saclay - Dapnia/SACM Annual meeting CARE October.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
Status of CEPC Detector magnet
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
SIS 100 main magnets G. Moritz, GSI Darmstadt (for E. Fischer, MT-20 4V07)) Cryogenic Expert Meeting, GSI, September 19/
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
Cryogenic Experts Meeting (19 ~ ) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR –
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
General Considerations for the Upgrade of the LHC Insertion Magnets
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Magnet design issues & concepts for the new injector P.Fabbricatore INFN-Genova Magnet design issues & concepts for the new injector P.Fabbricatore INFN-Genova,
SIS 300 Magnet Design Options. Cos n  magnets; cooling with supercritical Helium GSI 001 existing magnet built at BNG measured in our test facility 6.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Correctors magnets V. Zubko, IHEP, Protvino SIS 300 Pre-consortium Meeting Thursday 19 March 2009, Protvino.
The integration of 420 m detectors into the LHC
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Experimental study on heat transfer through a few layers of multilayer insulation from 300 K to 4.2 K Zhanguo Zong, Norihito Ohuchi, Kiyosumi Tsuchiya,
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
HTS and LTS Magnet Design and Prototyping for RAON
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
New Magnet Design for FCC- ee Attilio Milanese, CERN 26 Oct presented by Frank Zimmermann.
Michael A. Green and Heng Pan
SIS 100 Vacuum chamber Recooler String system Components
Yingshun Zhu Accelerator Center, Magnet Group
Hervé Allain, R. van Weelderen (CERN)
Hervé Allain, R. van Weelderen (CERN)
Hervé Allain, R. van Weelderen (CERN)
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
The CMS magnet superconducting coil
SC Quadrupole Magnets in ILC Cryomodules
Challenges of vacuum chambers with adjustable gap for SC undulators
Hervé Allain, R. van Weelderen (CERN)
Arc magnet designs Attilio Milanese 13 Oct. 2016
Large Booster and Collider Ring
CHEN, Fusan KANG, Wen November 5, 2017
Conceptual Design of CEPC Interaction Region Superconducting Magnets
Yingshun Zhu Accelerator Center, Magnet Group
The PEP-II Interaction e+e- Factories Workshop
Challenges for FCC-ee MDI mechanical design
SCU Next Phase Meeting July 8, 2014.
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
Beam-Induced Energy Deposition Studies in IR Magnets
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Wednesday Summary of Working Group I
Muon Collider SR and IR Magnets
as a prototype for Super c-tau factory
CEPC Final Focus Superconducting Quadrupole and Anti-solenoid Magnets
Review of Quench Limits
IR Beam Transport Status
JLEIC Magnet R&D Tim Michalski NP Community Panel Review of the EIC
Presentation transcript:

Superconducting Quadrupoles inside the HERA Experiments M. Bieler, DESY, LHC LUMI 05 Workshop, Arcidosso, September The HERA Interaction Region - The ZEUS Detector - The Quadrupoles

The HERA Interaction Region 920 GeV Protons 27.5 GeV Electrons

ZEUS Detektor p e Vorwärts-Kalorimeter Rückwärts-Kalorimeter Zentrales-Kalorimeter Solenoid Magnet Zentrale Driftkammer CTD Mikrovertex-Detektor

GG

GO

As part of the HERA luminosity upgrade, 6 superconducting Interaction Region quadrupoles were delivered, accepted, and are in service. These 6 layer magnets were designed to include the main quadrupole focus, a skew quad, a normal and skew dipole, and a final sextupole layer. Because of the physical space constraints imposed by the existing detector region components, the DESY magnets were of necessity designed to be very compact. In addition, they are also are required to operate within the solenoidal detector fields at the collision points, so all construction materials had to be non magnetic. Two types of DESY magnets were fabricated. The first, designated as G0, was a two meter long, constant radius magnet. The second, designated GG, is a one meter long, tapered tube, with a continuously increasing field strength from the lead end towards the collision point. From Design Parameters

Magnet Parameters GO Magnets GG Magnets I(A)Field(T)GradientL eff I(A)Field(T)GradientL eff Circuit at 31mm (m) at 45mm (m) Quad T/m T/m1.33 hor. Dipole Skew Quad T/m T/m1.04 vert. Dipole Sextupole T/m T/m

The GG Magnet

The GO Magnet 3.7m 17cm75cm

The GO Magnet

Cross Section of the GO Magnet 4K He Return 40K He 3mm Beam Pipe 5mm Coil Support Tube (102mm ID) Coil Layers 3mm He containment (144mm OD) Slotted G-10 Spacer Stainless Support Key 60mm 90mm 39mm 39mm for magnet and cryostat

Magnet Production at BNL - 11 axis wiring machine - 6 layers - Ultrasonic wire bonding - Pattern modulation to correct for field errors in lower layers - 5 circuits

Radial Magnet Design Kapton Insulation Coils in Substrat S-Glas Kompression LHe at 4K Ca. 2mm Quadrupole Dipole Sextupole Skew Quad Coil Support Tube (5 mm) Outer Helium Tube (3 mm) Coils ca. 11 mm GO:

„6 around 1“ Cable 51  m Filament:8  m Cu/NbTi: 1.8:1

The ‘End Can’

Cryogenics Heat load at 4KHeat load at 40K Magnet(Watt) H1, GO28117 H1, GG29108 ZEUS, GO50104 ZEUS, GG31146 Measured static heat loads for the magnets and transfer lines (dynamic heat load: 6 – 15 W/m). The magnet coils are cooled with supercritical single phase helium between 4K and 4.4K whereas the beam pipe is cooled between 40K and 80K.

Problems with GG and GO Water: The temperature of the outer magnet surface was so low, that water was condensing on the magnet, dripping down into the detector. Solution: Armaflex for thermal insulation, plastic bag to collect the water. Magnet position: Inner tip of the magnet supported by steel cables or hydraulic movers. Exact position of the tip can not be surveyed. Magnetic forces between the magnet and the experiment’s solenoid move the magnet by 1 mm during the energy ramp. Solution: Electron orbit feedback system. Cryogenics: Pressure drop in the magnets 3 times higher than expected. Solution: Additional circulation pumps.

References Brück et al, Operational Experience with the new Superconducting luminosity upgrade magnets at HERA, ICEC 19, Grenoble, France, 2002