Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.

Slides:



Advertisements
Similar presentations
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Advertisements

Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
ART: Augmented Reality Table for Interactive Trading Card Game Albert H.T. Lam, Kevin C. H. Chow, Edward H. H. Yau and Michael R. Lyu Department of Computer.
Magnetic Field Studies Dan Karmgard for the HCAL RBX Group.
Development and Quality Plans
LSU 10/09/2007System Design1 Project Management Unit #2.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Problem solving in project management
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Effective Methods for Software and Systems Integration
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
COLLABORATION MODULE #3 Planning Good Meetings An online module developed by Pivot Learning Partners for the West Contra Costa Unified School District.
S/W Project Management
Work Package 6: Performance Specification Ian McCrea.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Software Overview David Lawrence, JLab Oct. 26, 2007 David Lawrence, JLab Oct. 26, 2007.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Successfully recording Continuing Professional Development.
PREPARING FOR AND RUNNING MEETINGS 8.1.  Establish meeting schedule for entire year at first meeting.  Same time on the same day each month?  Sett.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Research & Technology Implementation TxDOT RTI OFFICE.
GlueX Software Status April 28, 2006 David Lawrence, JLab.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Electronics play a critical role in modern accelerator physics experiments. Events will be recorded at a rate of 200,000/second. Modular electronics such.
4.4 Timeline for M2M Consolidation Susan Miller ATIS Head of Delegation Meeting of Potential M2M Consolidation Partners #2 Washington, D.C. August 17-18,
By: Eric Backman Advisor: Dr. Malinowski.  Introduction  Goals  Project Overview and Changes  Work Completed  Updated Schedule.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
Project Management (and Software). Who Does What, and When? Project Management is concerned with the allocation of resources to complete a project. Project.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
ECE445: The Design Review Sept 2, Documentation Roadmap Request for Approval Proposal Design Review Final Paper &Presentation Sept 10Sept 16Sept.
Meeting Management/Planning. Today Go over basics of meeting management Introduce key elements of creating a plan.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Tracking Calorimetery Particle Identification WBS DETECTORS.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Curtis A. Meyer 13 December, 2003 The Detector Review Review the tracking and calorimeter elements Vertex Detector Straw Tube Chamber Forward Tracker Barrel.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
The May 2010 GlueX Collaboration Meeting Curtis A. Meyer Carnegie Mellon University.
Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010.
1 RBM Workplanning and Budgeting-FAO Managing for results in FAO Module II. Operational Planning ‘Workplanning’
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Checklists EDUC 307. What is an Observation Checklist?  The observation checklist is a strategy to monitor specific skills, behaviors, or dispositions.
LBNE Remote Handling Conceptual Design Issues for ORNL Collaboration Kick-off Meeting at ORNL 1/6/2010.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Update on electron spectrometer measurements Introduction Setup, measurements carried out Some raw images Results and conclusions L. Deacon, M. Wing (UCL)
Work Breakdown Structure
Systems Analysis and Design
Session III Architecture of PLC
Your Facility Your Information
A summary of part 1 of Chapter 7 CEP 812 Kay Paff March 24, 1999
Project Management.
Project Management Unit #2
Presentation transcript:

Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How we know where things are, and monitor them, and how we service the detector under a series of failure scenarios. Curtis A. Meyer – Carnegie Mellon We have known that this was an issue since our First version of the design report. A lot of ideas Have been floated, but we have Not looked at it carefully as a collaboration until now. (1½ hour session on Friday just before lunch.)

Curtis A. Meyer 20 May, 2004 What do we need? In the near future, we need a plausible plan on how we assemble the detector and how we service it. We need to quickly identify bottle necks that would require early allocation of resources. We need rough costing on the infrastructure required to carry out this task. We need an updated and expanded section in our design report that reflects this work.

Curtis A. Meyer 20 May, 2004 The Scope of This Effort While we clearly want a plan for the entire detector, some aspects are more critical than others. We have in some sense broken the detector into four sections. (1) Upstream Region – Backwards Veto (2) Target Region – Vertex Chamber + Target (3) Inside Magnet – CDC, FDC and BCAL (4) Downstream – Cherenkov, TOF and Pb-Glass At this point in time we are focusing on (2).

Curtis A. Meyer 20 May, 2004 Issues Inside The Magnet We are living in a confined space from which we need to supply high voltage, low voltage, chamber gas …, and to remove heat, signals and used gas. All of the tracking devices live here, and accurate inter-calibration is crucial to the ultimate resolution of the system. Servicing these elements requires moving other detector elements

Curtis A. Meyer 20 May, 2004 Space Concerns 95 cm 90 cm BCAL 65 cm CDC 60cm 14cm Solenoid Have we allocated enough space for infrastructure? Move CDC in by 1-2 cm? Move BCAL out by 1-2 cm?

Curtis A. Meyer 20 May, 2004 Loading Issues The BCAL is ~800kg per each of 48 modules ~38000kg How is this supported by the magnet? The BCAL will settle over time as the lead flows. What can we mount the chambers to? Chamber loads on BCAL? CDC kg on endplates FDC 4 packages kg each

Curtis A. Meyer 20 May, 2004 Positioning Issues The chamber packages need to be aligned at the micron level. We cannot rely on a rail system to do this, a rail system should reproduce things at the mm level. How do we achieve, maintain and monitor the desired accuracy?

Curtis A. Meyer 20 May, 2004 Lead Time Issues Are there long lead-time items that are required for assembly? It may be necessary to install the BCAL and let it sit for 3-6 months to settle? What is the impact on the detector installation? Do we need the entire BCAL for early assembly?

Curtis A. Meyer 20 May, 2004 Servicing We have made a statement in the past that we want to have access to any detector element in one shift. Is this still a valid statement? We need to catalog what failures could happen to each detector element. Estimate the chance of such a failure, and then identify what we would have to do to fix it or live with it? The FDC is probably the hardest element to get to.

Curtis A. Meyer 20 May, 2004 Alignment An over constrained rail system can freeze up and lock detectors in place. We need to design a flexible system that can reproduce positions to the mm level. We want a hardware solution to provide alignment at the micron level. We need a software solutions that verifies the hardware alignment. (Note that in zero-field, the chamber calibrations will be significantly different than in full field.)

Curtis A. Meyer 20 May, 2004 Infrastructure Meeting Agenda 11:00 – 11:10 Introduction C. Meyer 11:10 – 11:25 BCAL Installation Regina 11:25- 11:45 Discussion 11:45- 12:00 Rail Systems Ravi 12:00 – 12:30 Discussion

Curtis A. Meyer 20 May, 2004 A Plan We need to be able to put together a plausible and defendable plan for all of these items and include it in our design report. We need to settle space issues now so that we can begin design of the final detector elements. We can still do this with a minimum of effort, but changes get harder as we go along. All relevant parties have to sign off on our scenario and we need to be able to have a reference to make sure that we maintain consistency with it.