28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
SPD spill-over and the subtractor Míriam Calvo 23 June 2010.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Photon reconstruction and calorimeter software Mikhail Prokudin.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
PHOS calibration in CDB framework M.Bogolyubsky, Y.Kharlov B.Polichtchouk, S.Sadovsky IHEP, Protvino ALICE off-line week 3 October 2005.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Kali Calo progress report Dasha Savrina (ITEP/Moscow), Vanya Belyaev.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
PHOS offline status report Dmitri Peressounko ALICE offline week,
Calorimeter Status Pascal Perret LPC Clermont 22 March 2011.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
M.N Minard Calorimeter Calibration scheme Calorimeter calibration procedure.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
Photon reconstruction and matching Prokudin Mikhail.
Calorimeter calibration -Initial calibration -Gain following -Archiving.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
CALOR April Algorithms for the DØ Calorimeter Sophie Trincaz-Duvoid LPNHE – PARIS VI for the DØ collaboration  Calorimeter short description.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
Calo Calibration meeting 08 september 2009 Calorimeter Olivier Deschamps LPC Clermont-Fd Software Status&News.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
The LHCb Calorimeter system
Ageing correction from electron
CMS ECAL Calibration and Test Beam Results
Individual Particle Reconstruction
The role of PS/SPD in the LHCb trigger
Plans for checking hadronic energy
Testbeam analysis on module #1
I. Machikhiliyan (LAPP, Annecy) for the LHCb calorimeter group
Presentation transcript:

28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending issues

28 June 2010 LHCb week St Petersburg M.N Minard 2 Calorimeter detectors status Non working channels Non working LED Concerns ECAL7/ cells + 11 unstable Fuse robustness HCAL3/14482 noisy PS0/6016Mostly Ok LED Not used SPD0/601610% channels LED not used Trigger impact

28 June 2010 LHCb week St Petersburg M.N Minard 3 Calorimeters controls Daily control followed by piquet (12 ) : –9 days with 2 days overlap HV errors (April) DAQ errors or configuration errors OPC server –Daily checks of currents and power supllies –Analyse calibration farm summaries ECS -Updated for Temperature controls of VFE -System very stable.

28 June 2010 LHCb week St Petersburg M.N Minard 4 Calorimeters monitoring (1) Calibration farm monitoring : LED Ped Survey -Pedestal noise & shift -Chi2 Presenter Expert Expert trend

28 June 2010 LHCb week St Petersburg M.N Minard 5 Calorimeters monitoring (2) LED data flashing at 10Hz are used to monitor the ECAL & HCAL calorimeters –Survey LED response Stability PMT/pin ratio –Give Trend Problem rate Algorithm in progress –Should provide: Dead channels Gain change Still a lot of improvements foreseen : –Data manager & data quality –DB handling

28 June 2010 LHCb week St Petersburg M.N Minard 6 Calorimeters Timing

28 June 2010 LHCb week St Petersburg M.N Minard 7 Xcal Timing status  = 0.75ns Crate <>= 0.7ns

28 June 2010 LHCb week St Petersburg M.N Minard 8 Xcal response stability K1 =Central/ Central+next+2*prev crate K1 <> = 0.93  = Crate # Channel+-1ns +-2ns Eprs>90MeV <>= 0.93  = % ns

28 June 2010 LHCb week St Petersburg M.N Minard 9 PS timing Spill over correction Not implemented – in progress All board < 1ns On TAE determine the 0 asymetry

28 June 2010 LHCb week St Petersburg M.N Minard 10 SPD timing Move by 1ns to be safe Initial adjustment from occupancy 0.5 ns off Clock shift Check with dispaced events

28 June 2010 LHCb week St Petersburg M.N Minard 11 SPD spill over At data taking start spill over has consequence on trigger –Work conducted to estimate the effect importance – lab tests & 2010 data used Substrator work as expected compensated for 20% of signal Exist particles arriving late : estimated spillover 4;10 -3 Effect low compare to backsplashs … PS/SPD survey with LED to resume

28 June 2010 LHCb week St Petersburg M.N Minard 12 Calorimeters calibration

28 June 2010 LHCb week St Petersburg M.N Minard 13 Hadronic calorimeter calibration Relative calibration monitored by Cesium source ;Ref 5 Feb 2010 Variation within 3 months To be compared to LED data

28 June 2010 LHCb week St Petersburg M.N Minard 14 Yu. Guz 02/06/ Response uniform at ~3% RMS for both inner and outer HCAL calibration on data at 4% level in progress. Hadronic calorimeter calibration

28 June 2010 LHCb week St Petersburg M.N Minard 15 Electromagnetic calorimeters calibration sequence Adjusted using  0 mass constraint : - 2  selected Et >205Mev - SPD to be calibrated.Account for # leakages default values from MC. Cell calibration c i - initial gain adjustment from PE (8%) - Eflow calibration (4%) -> early April (1) - Fine calibration (4). E prs calibration (MIP) (2).  adjustment (3) E Ecal =  c i E i

28 June 2010 LHCb week St Petersburg M.N Minard 16 SPD calibration Threshold adjustment of SPD –Run taken for theoritical 0.3, 0;5, 0;8, 1. MIP Numerical description Analytical description Correction to the current settings (active) 3% channels no setting value Need 2 more points 1.4 and 1.8

28 June 2010 LHCb week St Petersburg M.N Minard 17 E-flow PS & ECAL First relative inter-calibration on collision data using an ‘energy flow’ method smoothing the transverse energy deposit on the basis of the average deposit of neighbour channels Calorimeter standalone method requiring a relatively small statistics (~ 1M events) Method can be applied to PRS & HCAL Eflow-> 4-5% PS calibration Uses MIP response in PRS individual cells Intercalibration at 5% level Typical cell

28 June 2010 LHCb week St Petersburg M.N Minard 18 Estimation of the energy before ECAL ( PS+X) Adjusted from the  0 width mass minimization as a function of , for the different calorimeter regions.  varies +-25% for region Width Mass Chi2

28 June 2010 LHCb week St Petersburg M.N Minard 19 Fine cell calibration Iterative method developed for fine cell calibration : –Take converter or non converted photon –A tool building and iteratively using FMDst has been built (Kali) –Exercised on 100M decalibrated data Mass vs iteration After Mass > 135 MeV Width > 9.72 MeV

28 June 2010 LHCb week St Petersburg M.N Minard 20 Method performance & limitations Adjusted/true : sigma = 2.25% With tail ~3.5% Border effect, to be corrected from MC

28 June 2010 LHCb week St Petersburg M.N Minard 21 Cell calibration on data Use mass scale and minimize width Use 80M data ‘ (+70) including Eflow/PRS/  calibrations Iterative procedure /cell Max(prs1,prs2) 7.2 MeV Prs1 > 10 MeV Prs MeV Min(prs1,prs2)>10 MeV -> 8 MeV 5.78 Mev ( but 2 gaussian) MC width expectation 9MeV

28 June 2010 LHCb week St Petersburg M.N Minard 22 2 approaches give coherent results Differences mostly in outer part And detector border These calibrations are available in Reco04 Are they used in the PID for HLT ? Adjustment needed ?

28 June 2010 LHCb week St Petersburg M.N Minard 23 PMT stability over 2 months Estimate of stability for cell i: “Pessimistic”:  S1(i) = (Max(i) – Min(i)) / Mean(i) 3.4% “Optimistic”:  S2(i) = rms(i) / Mean(i) (0.7%) Max Min rms mean Algorithm to be worked

28 June 2010 LHCb week St Petersburg M.N Minard 24 On going questions Remeasure from data sample corrections issued from MC: –Z shape –S shape –Leakages Same cell coefficient for photon & electron : work on  (in progress) and others corrections New iteration foreseen after work completion Calorimeter alignment vs trackers Understanding MC behavior ( lateral shower expansion )

28 June 2010 LHCb week St Petersburg M.N Minard 25 Nice electromagnetic Zoo Is it going to survive ?

28 June 2010 LHCb week St Petersburg M.N Minard 26 High pile up events & on line reconstructed  0  0/background decrease by 25-30%, In spite new calibration applied Study to be done on others caracteristic channels May data Last week end data

28 June 2010 LHCb week St Petersburg M.N Minard 27 Status & plans Calorimeter hardware and controls performs well. Large progress have been made in detector understanding 1st fine calibration is released since end of May and Repro04 uses it … Still a lot to do for the 1% calibration goal at high energy …will need high energy sample.

28 June 2010 LHCb week St Petersburg M.N Minard 28 Back up

28 June 2010 LHCb week St Petersburg M.N Minard 29 High pt  0

28 June 2010 LHCb week St Petersburg M.N Minard 30 Electron Electron correction to be tuned for PRS & leakage