GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.

Slides:



Advertisements
Similar presentations
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael.
Advertisements

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.
LAT-PR Section 44-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectEngineering Meeting, December 3, GLAST Large Area Telescope: Engineering Meeting December 10, 2002 Lowell A. Klaisner Stanford.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Monitoring V6 1 GLAST Large Area Telescope: Electronics, Data.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
ROCSAT-2 Topic: Thermal Analysis Results - ISUAL Scientific Payload (with STR and IRU) Jeng-Der Huang ( 黃正德 )
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT Project ACD G3 Talks - 1 March, Gamma-ray Large Area Space Telescope GLAST Large Area Telescope GASU Based Trigger Systems Jim Panetta.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.4 Heat Pipe Design and Analysis1 GLAST Large Area Telescope: Mechanical.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
LAT-MD August 2006 LAT Requirement Sell-off Package GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Rose Navarro HMI Lead Thermal Engineer
GLAST Large Area Telescope:
GLAST Large Area Telescope:
SPP FIELDS V1234 Thermal PSR
GLAST Large Area Telescope:
GLAST Large Area Telescope:
LAT Requirements Verification in TVAC
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
Integration and Test Organization Chart
GLAST Large Area Telescope:
LAT Thermal Systems Analysis
GLAST Large Area Telescope:
Overview Cost to Complete
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Thermal Vacuum Test Jesse Armiger Thermal Vacuum Test Director Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 2 Agenda Test Overview and Major Test Event Log Compliance To Requirements Correlation Results Thermal Test Observations Summary

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 3 Test Picture

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 4 Test Overview

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 5 Compliance to Requirements LAT successfully completed Thermal Vacuum Testing –40 day test was successfully completed with only EGSE issues –Successfully tested LAT at Proto-Qual levels Verified thermal subsystem performance –Heaters –Heat pipes –Temperature sensors –Thermal Interface/Unit Mounting Thermal analysis correlation –No abnormal observations –Complete by October 30

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 6 Heater System Verification Survival heater system maintained all temperatures within limits during Survival Thermal Balance –Unregulated and regulated feeds at minimum voltage Unregulated feed at 25v and regulated feed at 27v –Grid heaters cycled at primary set points –Radiator Antifreeze heater duty cycle under review Demonstrated primary VCHP heaters could close Radiators at 70% power Functionally demonstrated all primary and redundant Radiator antifreeze and Grid heaters Demonstrated TCS could maintain RIT at all operational levels

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 7 Heat Pipes and Thermal Interfaces Heat Pipes –All Heat Pipes functioned normally DSHP and XLATs operated as expected VCHPs opened/closed Radiators as designed Interfaces –No baseplate outliers

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 8 Unit Temperature Distribution Hot Thermal Balance

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 9 Test results show good correlation between sink temperature predictions and input Watrod power ACD model received from GSFC uncorrelated – ACD MLI effectiveness needs evaluation ACD temperatures have impact on LAT correlation –Generally ACD tile temperatures higher than predictions (>5 o C) in all cases –Higher tile temperatures lead to higher tracker temperatures Grid heaters need to be modeled with individual thermostat set points for each circuit Preliminary Correlation 1/2

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 10 Hot Case - Temperatures generally lower than predicted Cold Case – –Temperatures generally higher than predicted –Radiator Anti-freeze and grid survival heaters off –VCHP heaters 9.7 watts to maintain RIT between -6 o C and -5 o C (23% duty cycle) Locked on to maintain RIT between -1 o C and 0 o C Survival Mode –Temperatures generally higher than predicted –Radiator Anti-freeze and grid survival heater use about 7 amps –Heater Power use higher than predicted Preliminary Correlation 2/2

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 11 Test Predictions vs. Actuals

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 12 ACD temperature sensor exceeded its red alarm limit of 40  C (unit proto-qual = 40  C) –This sensor reached a maximum of 42  C; the temperature excursion may have been caused by sensor malfunction –This was not unexpected because the ACD is bounded by a thermal blanket on one side and Tracker Towers with goal temperatures of  C –The ACD project manager has indicated that this temperature poses no risk to the ACD –Recommend an ACD red limit of 45  C for the observatory test Thermal Test Observations

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 13 LAT start up sequence from cold survival NCR #? –The normal start up sequence involves incrementally powering up the LAT in a manner which does not exceed the power budget –The planned sequence involved powering up the TCS last but it turned out that this step had to be performed earlier in order to stay within the budget –This minor change will be documented and implemented in the normal turn on sequence to be performed during observatory level testing Thermal Test Observations

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 14 The LAT thermal vacuum test was accomplished ahead of schedule and without any major incident. Three thermal balances (hot, cold and survival) and four thermal cycles were performed. Thermal data readout by VSC was very noisy and inaccurate; this caused hardship during the test. Minor incidents were corrected efficiently. Complete LAT Thermal Vacuum test report by October 31. –Include thermal model correlation Summary

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 15 Major Thermal Vacuum Test Events 1/2 Performance Testing

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 16 MajorThermal Vacuum Test Events 2/2 Thermal Cycling