License Application Status Presented to: National Nuclear Spent Fuel Program Presented by: Joseph D. Ziegler, Director Office of License Application and.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

1 EEC Board Meeting May 10, 2011 Child Care Development Fund – State Plan for Federal Fiscal Years 2012 and 2013.
Opportunities Exist to Strengthen FHWAs Coordination Guidance and Oversight of the Tribal Transportation Program October 30, 2013.
Repository Analysis Review NSNFP Strategy Meeting Washington, DC Henry Loo April 2009.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
1 Management Review Board (MRB): Roles and Responsibilities for the OAS Liaison Richmond, Virginia August 22, 2011.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Software Engineering Institute Capability Maturity Model (CMM)
Self Declaration Protocol EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
1 Portfolio Committee on Home Affairs Presentation on Internal Audit 19 April 2013 Building a New Home Affairs.
EM - TRANSPORTATION. EM Office of Transportation - Organization & Responsibilities Basis of Organization & Responsibilities Basis of Organization & Responsibilities.
Oregon Health Authority Communications and Engagement Plan Patty Wentz Director of Communications Oregon Health Authority and Department of Human Services.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
December 2010 Project Director’s Report OIDAP Quarterly Meeting Baltimore, MD Sylvia Karman OIDAP Member & Director, Office of Vocational Resources Development.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
NATIONAL GPAR PROGRAMME : INITIATION PLAN PRESENTATION TO LOCAL PROJECT APPRAISAL COMMITTEE June 23, 2011.
California Integrated Waste Management Board 1 Agenda Item 14 Consideration of Streamlining Grant Processes to Enhance Program Efficiency January 17, 2006.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
ACADs (08-006) Covered Keywords Commission, regulation, advisory, standards. Description This presentation provides general information about each of the.
Comprehensive Review of the Public Safety Communications Center Phase 2 Report County of Dane, WI February 12, 2009.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
LINC 07 Administrators Conference Successful Board Partnerships Nora V. Murrant, FCA, FCBV.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Special Needs Plans Models of Care SNP Educational Conference Baltimore, MD January 13, 2014 Susan Radke, MCAG Division of Policy, Analysis, and Planning.
1 RIC 2009 Construction Inspection Program Loren R. Plisco Region II March 11, 2009.
California Integrated Waste Management Board November 10, 2008 Item #2 Discussion And Request For Direction Regarding The Board's Fulfillment Of The Requirements.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Project Licensing Status Jim Kinsey Director, Regulatory Affairs NGNP Project.
1 Options to Revise Radiation Protection Regulations SECY Kimyata Morgan Butler, Ph.D. Health Physicist/Project Manager Office of Federal and State.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Enhancements to the NRC Allegation Program Technical Session: NRC/Industry Response to Security Inattentiveness Concerns Lisamarie L. Jarriel Agency Allegation.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
PH 8.01/99 - Seminar, Brussels, 9 November 2005 PH 8.01/99 – Seminar on “Dissemination of PHARE projects description and results” Overview of BG PHARE.
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Information Technology Procurements RFP Review Process April 27, 2009.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Agreement State Input: Common Prioritization and Re-baselining of NRC’s Work Duncan White Office of Nuclear Materials Safety and Safeguards August 25,
ECOS Information Session Draft EPA Quality Documents February 13, 2013 Presented by EPA Quality Staff, Office of Environmental Information For meeting.
Defense Nuclear Facilities Safety Board September 26, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office of Quality Assurance.
United States Department of Agriculture Food Safety and Inspection Service UPDATE : Improvements for Processing and Slaughter Inspection August 27, 2008.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
DEWG Meeting Summary Report to COPS 08/14/2007 Jim Galvin- Luminant Energy.
The TNI National Environmental Laboratory Accreditation Board Update Daniel Hickman, NELAP Board Chair.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
1 Restructuring Webinar Dr. Zollie Stevenson, Jr., Ph.D. Director Student Achievement and School Accountability Programs Office of Elementary and Secondary.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Every Student Succeeds Act January Christopher Woolard Senior Executive Director, Center for Accountability and Continuous Improvement Colleen D.
Understanding the New Math TEKS RME Research to Practice Conference February 28, 2014.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Information Technology Procurements RFP Review Process
Working with your AoA Project Officer
Office of Nuclear Materials Safety and Safeguards
NRC’s LLW Regulatory Program: Update of Emerging Issues
Updating the NRC’s Alternative Disposal Request Guidance Document
Implementing the Transportation/Land Use Connection Program
U.S. Nuclear Regulatory Commission Radiation Safety Standards
City of Phoenix Request for Qualifications and Scoring Process Update
Research and Test Reactor Safety: The Regulatory Perspective
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Decommissioning Rulemaking
Changes and Implementation Plan
PWR Sump Performance (GSI-191) Industry Workshop
Presentation transcript:

License Application Status Presented to: National Nuclear Spent Fuel Program Presented by: Joseph D. Ziegler, Director Office of License Application and Strategy April 13, 2005 Bethesda, MD

2 YMZiegler_DOE-NRC_ ppt Topics for Discussion  License Application (LA) Plans –LA Enhancement  Post Closure Safety Analysis and Integration  Preclosure Safety Analysis/Design and Integration  LA Integration with Supporting Documents  Key Technical Issue (KTI) Agreements Status  NRC/DOE Interaction Planning 2005  Accomplishments

3 YMZiegler_DOE-NRC_ ppt License Application Plans Postclosure Safety Analysis and Integration  Produced over 3,000 action items  Identified the 89 documents to be updated (specific evaluation checklists were used to determine which of documents considered should be revised)  Complete; (4 steps – drafting, checking, review, approval) as of November 23, 2004  Total System Performance Assessment undergoing revision

4 YMZiegler_DOE-NRC_ ppt License Application Plans (Continued) Preclosure Safety Analysis/Design and Integration  Focused effort to ensure the preclosure safety basis is well defined, understandable, complete, and reflected in an integrated manner in LA support documentation  A primary purpose is to ensure consistency between the LA and supporting preclosure documentation  Basis documents will be issued before submittal of the LA

5 YMZiegler_DOE-NRC_ ppt License Application Plans (Continued) License Application Integration  Improving integration of the LA with its supporting technical documents –Transparency and traceability continues to improve  Integrated Issue Resolution Status Report  Another round of reviews of LA sections was initiated in January –Includes checking support documents and references for an adequate basis of assertions –Plan additional senior management and senior external reviews

6 YMZiegler_DOE-NRC_ ppt Key Technical Issue Agreement Status (as of April 4, 2005)  255 of 293 agreements are considered complete by the NRC  Continuing dialogue with NRC technical staff and the Center to assist in completing the reviews High Risk Medium Risk Low Risk Completed In NRC Review 1*23 25 (Addt’l Info Needs for High = 8, Total = 19) Interaction Planning 2005  In discussions with NRC staff to identify need & timing for upcoming interactions, notably pre-closure topics  Held Technical Exchange on Quality Assurance Requirements and Description (QARD), Rev 17 on February 10, 2005 *GEN 1.01 is closed for the High Risk portions only.

7 YMZiegler_DOE-NRC_ ppt Accomplishments  Postclosure Safety Analysis and Integration activities – completed and considered successful  Substantial progress in Preclosure Safety Analysis/Design and Integration in identifying and resolving comments in LA support documentation  Relocated the NRC OR’s offices with enhanced direct access