L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
Protocol Configuration in Horner OCS
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Riso Digital Education Center Appendix for SRC Training Basic Course 1.
KX-NS1000 Initial Set Up For step by step : 16 May,
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
OUTLINE WHAT ? HOW ? WHY ? BLUEPOST Poster and Message Content Specified by the User Displaying the Poster Content on a Monitor Sending Messages to.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Control and monitoring of on-line trigger algorithms using a SCADA system Eric van Herwijnen Wednesday 15 th February 2006.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 BRIDGEPAD (BP) SYSTEM TRAINING Adapted for ScoreBridge Users By John de Ridder PSBC Revised 2 November 2009.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
FPGA IRRADIATION and TESTING PLANS (Update) Ray Mountain, Marina Artuso, Bin Gui Syracuse University OUTLINE: 1.Core 2.Peripheral 3.Testing Procedures.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (written by Michela) HV part updated by Oleg Maev 4-November-09.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
1 Control Software (CAT) Introduction USB Interface implementation Calorimeter Electronics Upgrade Meeting Frédéric Machefert Wednesday 5 th May, 2010.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Sep. 18th 2006 Stefan Koestner Installation Guide ECS-tools for the CCPC/Tell1 (Installation): Many problems/user- requests already arises when installing.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
IT1001 – Personal Computer Hardware & system Operations Week7- Introduction to backup & restore tools Introduction to user account with access rights.
March 7th 2005 Stefan Koestner LHCb week ECS-tools for the CCPC/Tell1 (Installation): Many problems/user- requests already arises when installing the framework.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
LHCb Configuration Database Lana Abadie, PhD student (CERN & University of Pierre et Marie Curie (Paris VI), LIP6.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
MCast Errors and HV Adjustments Multicast Errors (seen on the DATA ERIS connection) have caused a disruption of a HV Adjustment due to a timeout (since.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
MiniDAQ2 Workshop Control System.
The LHCb Run Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

L0 DAQ S.Brisbane

ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system The DAQ is the section which looks after the configuration of the detector for data taking (rather than power up) The L1 and L0 are part of DAQ and must be configured correctly to take data –Configuration can be different for different purposes –The L0 configuration can vary from one board to the next, or between RUN_MODEs It is the job of the DAQ FSM to simply handle configuration for these different RUN_MODEs –Simplest example High granularity mode of the PIXEL chips (ALICE), or Normal granularity mode (LHCb) One example is the “PHYSICS” mode, we use this most often in commissioning

DAQ basics continued STATES –The L0 and L1 FSM can only be in the following predefined states NOT_READYNOT_READY – we normal state at power up CONFIGURING – State change in progress, can take some time READY – The L0 and L1 are configured for data taking RUNNING – the L0 and L1 are told to read out data ERROR – Something has happened ACTIONS –To configure a board/set of boards for data taking, use CONFIGURE –To start taking data, START –To stop data taking STOP –Before switching off the low voltage, RESET the L0 boards –If there is an ERROR, try to RECOVER

Configuring the L0 -What happens A-SideC-Side SPECS Communication L0 Boards + HPDs SPECS SLAVES JTAG to the L0’s PVSS Controls project FSM DNS server 1 DIM server per column, running on PC to which column is connected SPECS MASTER port on one of the PCS SPECS Slave on Column INSIDE the PC ALICE|TESTPULSE Recipe database Load And apply Communication via DIM

L0 Board + HPD Basics - explanation for last slide L0 board and HPD sit on detector They are the first pieces of electronics to see data There are many registers to set on the HPD and L0 boards before it is ready to take data. The parameters are stored in recipes. –Loading recipes and applying to L0 boards is handled by the an external PVSS component The configuration is performed from control PCS which are connected up remotely to each other and to the ECS system itself PVSS and 2 types of SPECS server run on the L0 control PCs –PVSS communicates via DIM to these servers in order to configure the system The SPECS protocol is used to send the configuration messages over long distances to the detectors At the column level, SPECS is translated to JTAG which is used for short distances

On the L0 controls PCs SPECS master boards perform the slow control configuration and monitoring for : A-side* : r2daq02w C-side* : r2daq01w U-Panel : r1daq01w D-Panel : r1daq02w Communication with masters provided by One L0 Dim Server per column One Specs server per PC DNS handles the pvss to server communications A PVSS project running on r2daq02w and r1daq01w * A8 runs from PC r2daq01w Installed as services Use Service+ to view

Level-0 FSM From the top level FSM, L0 can also be configured Status of each of the DIM servers is displayed underneath Red indicates server not running Status of each of the L0 boards is displayed using the RICH L0 summary panel, also available from the g:/rich/oper folder For LHCb shifter: During running, only Errors which make stopping a run necessary will be displayed here The RICH shifter cares in more detail….

RICH L0 Summary panel 8 L0 Boards Summary of HPDs and boards with corrupted registers is displayed with the RICHL0_Summary panel Shifters should check every few hours Detail of the error type is gained by clicking on the board in question Reconfiguring of single boards also possible this way Error information and recording for the RICH shifter FSMConfDB objects handle configuration recipes for different run modes

Other indications Striped pattern in the online monitoring – indicates L1 is getting bad data from a HPD Happens often during or after HV ramping Error not necessarily seen in FSM or summary panel Follow power cycling procedure on previous slide Please write in logbook

Errors incurred with HV Individual board errors during configuration are displayed in the FSM and summary panel Individual board errors incurred during run are displayed only in the summary panel Record the error (in logbook) and type (from summary panel) First, try to reconfigure a board in error If this fails –Switch it OFF from DCS for 5 seconds and back on again, reconfigure Power cycle the column from DCS, reconfigure. If the board is still in error, always exclude it from the FSM tree –Makes life easier to see other errors. –In final case – excluded boards must be reported to us

End RUN –Recommend you to RESET and CONFIGURE all L0 boards During a run, only errors serious enough to warrant the run to be stopped are displayed –Some register corruption may still have occurred resulting in reduced data quality End RUN procedure