10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.

Slides:



Advertisements
Similar presentations
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Advertisements

Calibration for different trigger sources (DT,CSC,RPC) S.Bolognesi for the Torino group (with a big help from M. Dalla Valle) DT Cosmic Analysis meeting.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
Approved Plots from CMS First Beam Runs 2-October-2008.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Status of the CSC Track-Finder Darin Acosta University of Florida.
28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
1 LHC and CMS Status Robert M. Harris Fermilab Fermilab All Experimenters Meeting Nov. 10, 2008.
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
The I-search Proposal Don’t get stuck with a dud!.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1  Recall descoping scenarios for 235 and 200 MChF:  Tiziano:
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
Update on “Muonic Timing” of CSC Electronics
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
“Golden” Local Run: Trigger rate = 28Hz
CMS RPC Endcap RE1 Status Report
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
B904 Status Report by Fred B.
CSC Trigger Primitives Test Beam Studies
CSC Trigger Meeting Summary
Pierluigi Paolucci & Giovanni Polese
Plans for the 2004 CSC Beam Test
B904 Status Report by Fred B.
CSC Electronics Problem Report CSCE I&C
CSC Shift Training and Operation + B904 Status
Presentation transcript:

10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam starts ~Nov. 18 at low energy. Collisions at 540 GeV before Xmas?? Xmas break is Dec. 18-Jan. 4 (everything off) CSC: ME4/2 chambers now have LV. Time to switch to 3-layer pretriggers. Time to take single-layer (e.g. ME1/x), bottom-only local runs. Power-off test was flunked last Weds. Power-on sequence is being revamped to maybe kill fewer boards. My schedule: At CERN until Oct. 21 Then L.A., Oct. 28 Fermilab (Upgrade workshop), L.A. (DOE review) Back at CERN Nov , back to L.A. for Thanksgiving At CERN again Dec Chris passed his comprehensive exam but didn’t tell me…

10/06/09 UCLA Meeting Hauser 2/14 really Progress Done in last week: Upgrade: Revised FY10 muon upgrade plan, $431K  $352K  2-page report on upgrade activities thus far CD0 document edits: upgrade funding profile, simplified electronics diagram Reviewed CFT (Level 1 trigger), 178 comments New draft ready for more comments  Put together draft CSC shift schedule for Nov March 2010 CSC “task force” organization discussions TOF ideas for cosmics, etc (see later slides)

10/06/09 UCLA Meeting Hauser 3/14 really TOF calculations: collision muons t= d/c, dt=t-t 0 where t 0 =time for ref. Chamber ME+-1/2/28 Collisions: d=sqrt(r 2 +z 2 ) X d

10/06/09 UCLA Meeting Hauser 4/14 really TOF calculations: single beam halo t= d/c, dt=t-t 0 where t 0 =time for ref. Chamber ME+-1/2/28 Single beam 2 halo: d=z; conversely beam 1 halo d=-z X d Beam 1 z-axis + endcap - endcap Beam 2

10/06/09 UCLA Meeting Hauser 5/14 really TOF calculations: cosmic rays t= d/c, dt=t-t 0 where t 0 =time for ref. Chamber ME+-1/2/28 Consider bottom (easiest case): d from where?? X d less frequent more frequent

10/06/09 UCLA Meeting Hauser 6/14 really TOF calculations: cosmic rays Initial thought: choose MB2 top, wheel 0 (barrel ref station) Will give more TOF at bottom than at horizontal X d less frequent more frequent

10/06/09 UCLA Meeting Hauser 7/14 really TOF calculations: cosmic rays But depends on steepness of cosmic ray spectrum with theta. Why not barrel wheels 1 or 2? X d d’ d’’ Wheel 0Wheel 1Wheel 2

10/06/09 UCLA Meeting Hauser 8/14 really Time correction for big CSCs 1.It looks like time of flight effect was taken into account. 2.Any discrepancy between group of 6 CSCs belonged to PCs located in one rack can be regarded as TTC coarse delay typo. Can TTC fine delay fix the problems? 3.May be there are another effects which makes this plots not uniform. Greg remembers Misha study of Dayong timing corrections (presented 18-Sept-2008)

10/06/09 UCLA Meeting Hauser 9/14 really Use Misha’s analysis of timing changes: Fit for “reference point” in MB using the measured amplitude of “sinusoid” – amplitude will grow as reference point nears the endcap – E.g. MB0: small sinusoid, MB1: medium, MB2: large sinusoid – Effect should be < top-bottom TOF

10/06/09 UCLA Meeting Hauser 10/14 really TOF calculations: cosmic rays Top of CSC: what to do? LCTs choose other direction Choose MB2 bottom? Will give less TOF (more negative t) at top But how to link top and bottom at horizontal? (Dayong synchronizes locally…)  Chose new reference chamber at horizontal -d less frequent more frequent X

10/06/09 UCLA Meeting Hauser 11/14 really Model results: Hot off the press – calculate using MB Wheel 2 Shows similar variation and amplitude as data!

10/06/09 UCLA Meeting Hauser 12/14 really Upcoming  Upcoming: Oct. 7 CSC upgrade electronics videoconference: Weds. Oct. 7 at 7 p.m. using EVO DCFEB for ME1/1 is highest on priority list. Progress? Need to upgrade ME1/1 TMBs & DMBs with optical links, faster FPGA. Are there mandated changes to other cards or to crates?  Oct. 8 Virdee a small meeting to discuss forward muon upgrades in all generality (including RPC).

10/06/09 UCLA Meeting Hauser 13/14 really Other topics to discuss  Group infrastructure  EVO speakerphone in conference room?  What about printing from Linux boxes at CERN?

10/06/09 UCLA Meeting Hauser 14/14 really My to-do list Muon upgrade planning continues… Determine ALCT muonic timing parameters – for no change in timing on cosmics – for cosmics, from first principles – For single beam and collision muons – Check out Chad’s changes to program and new database I/O Determine a procedure for setting CFEB muonic timing parameters Work on talks for the FNAL workshop Oct. 28 and the upcoming DOE review of UCLA Oct CFT review continues until paper is ready to go out Start saving firmware versions for all Emu electronics boards into CVS Someday: – Initial planning for 269B course in Spring “Physics of the LHC”. Invite speakers early on. – Create a CRAFT 2009 timing synchronization CMS note? – Slow particle timing in CSC – Update my personal web page (dates from 2002)