Design and Documentation Chapter 8. Network Design Issues Your first step in the process is to gather information about the organization. This information.

Slides:



Advertisements
Similar presentations
Cabling system components
Advertisements

Chap 8 Design and Documentation
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Telecommunication Rooms
Chapter 3: Planning a Network Upgrade
Antonio González Torres
Chapter 7: Intranet LAN Design
Chapter 4 – Cisco Semester I
Network Engineering Taster Day Mark Clements. 30 March 2012Engineering Taster Day 2 Welcome to Engineering Taster Day: Morning Session Ambassadors Fire.
Module 5 - Switches CCNA 3 version 3.0 Cabrillo College.
Physical Transmission Media 8 5/9/ Modified by: Brierley.
Campus LAN Overview. Objectives Identify the technical considerations in campus LAN design Identify the business considerations in campus LAN design Describe.
Cisco 3 - Switches Perrine - Brierley Page 15/10/2015 Module 5 Switches LAN Design LAN Switches.
Cisco Academy – Chapter 5 Physical Layer. Physical Layer - 1 defines the electrical, mechanical, procedural, and functional specifications for activating,
Institute of Technology Sligo - Dept of Computing Chapter 8 Network Design and Documentation.
Ch.6 - Switches CCNA 3 version 3.0.
111 © 2002, Cisco Systems, Inc. All rights reserved. Trim out phase steps Cutting cables to length Labeling cables Dressing cables Terminating cables Installing.
Institute of Technology Sligo - Dept of Computing Many Roads To Home Paul Flynn.
Institute of Technology, Sligo Dept of Computing LAN Design Semester 3, Chapter 4.
1 CCNA 3 v3.1 Module 5. 2 CCNA 3 Module 5 Switches/LAN Design.
NETWORK DESIGN Customer requirements Network topologies Cable choice Hardware TSB 75 TSB72.
Designing and Implementing Cabling Infrastructure Dr. Saif al Zahir King Fahd University of Petroleum & Minerals Computer Engineering Department Dr. Saif.
ACACIA Threaded Case Study Presented By: Louise Maguire, Caroline Kearney, Peter Honeyman, Michael Mctague.
1 Design and Documentation Honolulu Community College Cisco Academy Training Center Semester 1 Version
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
Many Roads To Home. LAN Roads UTP STP Coaxial Fiber Optics.
Installing the Network Chapter 11 Release 16/7/2009.
Cisco – Semester 1 – Chapter 9 Preview Review. Behavioral Objectives Document all work –Do it as work proceeds –Same as chapter 8 guidelines –Don’t forget.
Copyright CCNA 1 Chapter 4, Part 1 Cable Testing By Your Name.
CSE 550 Computer Network Design Dr. Mohammed H. Sqalli COE, KFUPM Spring 2007 (Term 062)
Chap 9 Structure Cabling Project Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
The Saigon CTT Semester 1 CHAPTER 9 Le Chi Trung.
Semester 1 CHAPTER 8 Le Chi Trung
Chapter 5 Networks Communicating and Sharing Resources
How does AC line noise create problems?
Cisco Threaded Case Study
Hands-on Networking Fundamentals
Local Area Networks Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
LAN Design of a Local High School Martin Kucek Chris C. Yu Sandy Ramirez Cisco TCS Project – Semester 3 © 2001 Martin Kucek / Chris C. Yu / Sandy Ramirez.
HORIZONTAL SUBSYSTEM. CABLING SYSTEM Horizontal Subsystem The Horizontal cabling subsystem is the part of the Signamax Cabling System that extends from.
1 Guide to Network Cabling Fundamentals Chapter 5.
Chapter 9 Review Structured Cabling Project. Chapter 9 Focus The focus of this chapter is standards for networking media. You read that when RJ-45 jacks.
Cabling Project. Your first responsibility, as the network designer, will be to have your client specify, in writing, the desired outcome of the project.
Robert E. Meyers CCNA, CCAI Youngstown State University Cisco Regional Academy Instructor Cisco Networking Academy Program Semester 3, v Chapter.
CABLING SYSTEM BACKBONE SUBSYSTEM.
LAN DESIGN – first step 5 ISB – school year 2006/07.
Cisco 3 - Switches Perrine - Brierley Page 112/1/2015 Module 5 Switches.
LAN Design Semester 3, Chapter 3. Home End Table of Contents Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There!
SIGNAMAX CABLING SYSTEM. Signamax Cabling System The Signamax Cabling System Design Principles and Installation Practices are based on the requirements.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Connecting to the Network Introduction to Networking Concepts.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
Gary Marret, RCDD WHAT IS ETHERNET? WHAT IS ETHERNET? WHAT IS ETHERNET/IP? WHAT IS ETHERNET/IP? ETHERNET HARDWARE? ETHERNET HARDWARE? HOW DO I CABLE.
TELECOMMUNICATIONS SPACES. WORK AREA WA Work Area Work Area (WA) Telecommunications Outlet (TO) Horizontal subsystem cables Equipment and patch cords.
TELECOMMUNICATIONS SPACES
Discovery 2 Internetworking Module 3 JEOPARDY K. Martin.
SIGNAMAX CABLING SYSTEM. Signamax Cabling System The Signamax Cabling System Design Principles and Installation Practices are based on the requirements.
Threaded Case Study of Bangladesh Internet Press Ltd. (BIPL) By: Md. Ikbal Zavid Abul Kalam Asad Supervise By: Debanon Datta Legal Main Contact, CNAP Ahsanullah.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.
Physical Network Design. Phiysical Network Design Selecting Technologies and Devices for – Campus Networks – Entreprise Network.
Threaded Case Study Acacia School Project Project Members: Md. Shafayet Hossain Md. Shakhawat Hossain Md. Moniruzzaman Md. Maksudur Rahman.
Physical Transmission Media Chapter 8. Objectives In this chapter, you will learn to: Identify the characteristics of wireline transmission Describe the.
LECTURE#6 - CABLES Asma AlOsaimi. Copper Coaxial Cable - Thick or Thin Unshielded Twisted Pair - CAT 3,4,5,5e&6 Optical Fiber Multimode Singlemode Wireless.
Level 2 Diploma Unit 10 Setting up an IT Network
LAN Design Broadcast and Collision Domains
Network Design Jack TSAI Cisco Academy Instructor FAMU-FSU College of Engineering February 2003.
Essentials of Networking
Module 5 - Switches CCNA 3 version 3.0.
Ram Dantu University of North Texas,
Computer Systems Department.  Introduction  Course Objectives  Grading Policy  Lab Policy  Structured Cabling.
Presentation transcript:

Design and Documentation Chapter 8

Network Design Issues Your first step in the process is to gather information about the organization. This information should include: 1. organization's history and current status 2. projected growth 3. operating policies and management procedures 4. office systems and procedures 5. viewpoints of the people who will be using the LAN

Network Design Issues The second step is to make a detailed analysis and assessment of the current and projected requirements of those people who will be using the network. The third step is to identify the resources and constraints of the organization. Organization resources that can affect the implementation of a new LAN system fall into two main categories - computer hardware and software resources and human resources.

Network Design Issues You must document an organization's existing computer hardware and software and identify and define its projected hardware and software needs. The answers to some of these questions will also help you determine how much training will be required and how many people will be needed to support the LAN.

Network Design Issues The questions you ask should include: 1. What financial resources does the organization have available? 2. How are these resources currently linked and shared? 3. How many people will be using the network? 4. What are the computer skill levels of the network users? 5. What are their attitudes toward computers and computer applications? Following these steps and documenting the information in the framework of a formal report will help you estimate costs and develop a budget for the implementation of a LAN.

General Network Design Process In technical fields such as engineering, the design process resources include designer—person doing the design 2. client—person who has requested and is probably paying for the design 3. users—persons who will use the product 4. brainstorming—generation of creative ideas 5. specifications development—usually numbers that will measure how well the design works 6. building and testing—process for meeting client objectives and satisfy certain standards

Network Design Documents The following list includes some of the documentation that you should create as you design a network: 1. engineering journal 2. logical topology 3. physical topology 4. cut sheets 5. problem-solving matrices 6. labeled outlets 7. labeled cable runs 8. summary of outlets and cable runs 9. summary of devices, MAC addresses, and IP addresses

Planning Structured Cabling: Wiring Closet Specifications The most important decision is the selection of the MDF. wiring closet size—TIA/EIA-568-A specifies that in an Ethernet LAN the horizontal cabling runs must be attached to a central point in a star topology. central point is the wiring closet where the patch panel and hub must be installed size is important to accommodate growth considerations walls, floors, and ceilings temperature and humidity locations and types of lighting power outlets room and equipment access cable access and support

Planning Structured Cabling: Wiring Closet Specifications TIA/EIA-569 SPECIFIES THAT EACH FLOOR MUST HAVE A MINIMUM OF ONE WIRING CLOSET AND THAT ADDITIONAL WIRING CLOSETS SHOULD BE PROVIDED FOR EACH 1,000 M 2 WHEN THE AREA OF THE FLOOR THAT IS SERVED EXCEEDS 1,000 M 2 OR THE HORIZONTAL CABLING DISTANCE EXCEEDS 90m.

Walls, Floors, and Ceilings MDF—floor must be capable of bearing 4.8 kPA (100 lb./ft. 2 ) IDF—floor must be capable of bearing 2.4 kPA (50 lb./ft. 2 ) Floor should be raised where possible and covered in tile or other finished surface. A minimum of two walls should be covered with 20-mm A-C plywood that is at least 2.4 m high. In MDF where POP is located, interior walls should be covered with 20-mm plywood with a minimum of 4.6 m of wall space provided for terminations and related equipment. Walls and coverings should be fire retardant. Room should not have dropped or false ceiling.

Temperature and Humidity 21 o C when all LAN equipment is in full operation relative humidity—30 to 50 percent Lighting Fixtures and Power Outlets If there is only one wiring closet or the closet is MDF, a minimum of two dedicated, nonswitched AC duplex electrical outlet receptacles on separate circuit is required. At least one duplex power outlet should be positioned every 1.8 m along each wall of the room, 150 mm above floor. Wall switch should be located inside the room x brightness required; fixtures 2.6 m above floor

Room and Equipment Access Door should be.9 m wide and should swing open out of the room. Lock should allow anyone inside room to exit at any time. Wiring hub and patch panel may be mounted to a distribution rack or to a hinged swing-mount rack secured to a wall. 48 cm should be allowed for the panel to swing out from wall. If using distribution rack, it must have a minimum of 15.2 cm of wall clearance, plus another 30.5 to 45.5 cm for physical access by workmen. A 55.9 cm floor plate mounts rack to floor. If patch panel, hub, or other equipment are mounted in a full equipment cabinet, they require at least 76.2 cm of clearance in front for door to swing open.

Cable Access and Support All cable should be protected by 10.2 cm conduit or sleeve core. All horizontal cabling that runs from work areas to a wiring closet should be run under a raised floor or through 10.2 cm sleeves that are placed above door level. (cabling ladder)

Planning Structured Cabling: Identifying Potential Wiring Closets 1. Start with floor plan of existing building. 2. Consider that the horizontal cabling system extends from the telecommunications outlet in the work area to the horizontal cross-connect in the telecommunications closet. It includes the telecommunications outlet, an optional consolidation pointer transition point connector horizontal cable, and the mechanical terminations and patch cords or jumpers that comprise the horizontal cross-connect.

Planning Structured Cabling: Identifying Potential Wiring Closets Some points specified for horizontal cabling subsystem include: 1. multipair and multiunit cables are allowed 2. grounding must conform to applicable building codes and industry standards 3. minimum of two telecommunication outlets is required per work area a. first outlet—100 UTP (Cat 5e recommended) b. second outlet—100 UTP (Cat 5e recommended) c. two-fiber multimode optical fiber d. one transition point is allowed between different forms of same cable type (where undercarpet cable connects to round cable) e. additional outlets may be provided f. bridged taps or splices are not allowed g. application specific components shall not be installed as part of horizontal cabling; must be placed external to telecommunications outlet or horizontal cross-connect h. electromagnetic interference (EMI) must be considered

Planning Structured Cabling: Identifying Potential Wiring Closets 1. Start by looking for a wiring closet close to POP, where telecommunications services are provided by telephone company. 2. Determine how many wiring closets you will need. 3. Draw circles that represent a radius of 50 m from each of the potential hub locations; if there is any overlap, you could potentially eliminate one of the hub locations.

Planning Structured Cabling: Backbone Cabling If the 100 m catchment area of a simple star topology wiring closet cannot provide enough coverage, the star topology can be extended by using hubs. TIA/EIA-568-A specifies the use of one of the following: 100-ohm UTP (four pair) 150-ohm STP (two pair) Two-fiber duplex 62.5/125 micron optical fiber Multimode optical fiber TIA/EIA recommends the use of Cat 5 or Cat 5e UTP for horizontal cabling when an Ethernet LAN uses a simple star topology.

Planning Structured Cabling: Backbone Cabling The main hub or switch for an extended star topology is usually centrally located. This central location is so important that in a high-rise building, the MDF is usually located on one of the middle floors, even though the POP might be located on the first floor or in the basement. Backbone cabling connects the POP to the MDF. Backbone cabling connects the MDFs to the IDFs on each floor. Horizontal cabling runs radiate out from IDFs on each floor. Horizontal cabling radiates from MDF to workstations on same floor.

Planning Structured Cabling: Cabling for MDF and IDF Connections The type of cabling that TIA/EIA-568 specifies for connecting wiring closets to each other in an Ethernet LAN extended star topology is called backbone cabling. Backbone cabling is sometimes referred to as vertical cabling. Backbone cabling consists of: backbone cabling runs intermediate and main cross-connects mechanical terminations patch cords used for backbone-to-backbone cross- connections vertical networking media between wiring closets on different floors networking media between the MDF and POP networking media used between buildings

Planning Structured Cabling: Backbone Cabling Media TIA/EIA-568-A specifies four types of networking media that can be used for backbone cabling: 100-ohm UTP (four pair) 150-ohm STP (two pair) 62.5/125 micron multimode optical fiber single-mode optical fiber The topology used when more than one wiring closet is required is the extended star topology.

Planning Structured Cabling: TIA/EIA-568-A Requirements In the extended star topology, there are two ways in which an IDF can be connected to the MDF. In the first, each IDF can be connected directly to the MDF. In this case, because the IDF is where the horizontal cabling connects to a patch panel in the wiring closet, whose backbone cabling then connects to the hub or switch in the MDF, the IDF is sometimes referred to as the horizontal cross-connect (HCC). The MDF is sometimes referred to as the main cross- connect (MCC) because it connects the backbone cabling of the LAN to the Internet.

Planning Structured Cabling: TIA/EIA-568-A Requirements In the extended star topology, there are two ways in which an IDF can be connected to the MDF. The second method of connecting an IDF to the central hub or switch uses the “first” IDF interconnected to the “second” IDF. The “second” IDF is then connected to the MDF. The IDF that connects to the work areas is called the horizontal cross-connect. The IDF that connects the HCC to the MDF is called the intermediate cross-connect (ICC). No work areas or horizontal cabling connects to the intermediate cross-connect when this type of hierarchical star topology is used.

Planning Structured Cabling: Electricity and Grounding Electricity is brought into our homes, schools, and offices by power lines that carry it in the form of alternating current (AC). Another type of current, called direct current (DC), is the kind found in a flashlight, car battery, and in the motherboard of a computer. Electrical Issues that must be addressed: AC Line Noise ESD Grounding Electrical Current

Planning Structured Cabling: Cabling and Grounding Cabling and Electrical Issues that must be addressed: Faulty Ground Wiring Problems Avoiding Potential Dangerous Circuits Between Buildings Fiber-optic Cable Can Prevent Electrical Shocks

Network Power Supply Issues: Power Line Problems Surge A surge is a voltage increase above 110% of the normal voltage carried by a power line. Sag/Brownout A sag is a brownout that lasts less than a second. These incidents occur when voltage on the power line falls below 80% of the normal voltage. Spike A spike is an impulse that produces a voltage overload on the power line. Oscillations and Noise Oscillation is an excessively long electrical wiring run, which creates an antenna effect.

Network Power Supply Issues: Power Line Problems Sources of Surges and Spikes Lightening, cycles on electrical motors Surge and Spike Damage Lockups, loss of memory, problems with data Surge and Spike Solutions Surge protectors Sag and Brownout Solutions UPS, backups Oscillation Solution Rewiring

Summary Layer 1 components include plugs, cables, jacks, patch panels To finish Layer 1 design, both a logical and a physical topology must be generated. Layer 2 devices such as switches reduce congestion and collision domain size. Layer 3 devices such as routers are used to build scalable internetworks (larger LANs, WANs, networks of networks) or to impose a logical structure on the network. Databases and other shared resources as well as LANs link to WANs and to the Internet.

Summary Whenever you install a cable, it is important to document what you have done. A wiring closet is a specially designed room for wiring a data or voice network. Backbone cabling consists of backbone cabling runs, intermediate and main cross-connects, mechanical terminations, and patch cords used for backbone-to- backbone cross-connections. Surge suppressors are an effective means of addressing the problems of surges and spikes.