D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.

Slides:



Advertisements
Similar presentations
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Advertisements

Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
Jan. 6, 2006 Chamber & Bellows IDR 1 LCLS Undulator Bellows Module Soon-Hong Lee Internal Design Review.
June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 1 Overview Heinz-Dieter Nuhn, SLAC / LCLS June 19, 2008 Introduction Workshop.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
Undulator Physics Update – October 27, 2005 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Physics Update Heinz-Dieter Nuhn, SLAC.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Dean R. Walters April 20, 2006 Vacuum Chamber Review 1 LCLS Undulator Vacuum Chamber Dean R. Walters.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Geoff Pile Single Undulator Test and Integration 12 th October2006 LCLSLCLSLCLSLCLS Single Undulator Test and Integration Geoff Pile.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 RFBPM Windows Joining Effort Undulator System W. Toter, D. Bromberek, F. Depaola,
Oct. 12, 2006 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
January 22-24, LCLS Week 2 The Extruded Aluminum vacuum chamber…
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
ATF2 Status N.Terunuma, KEK
Wire Scanner / A.Demougeot
Production and commissioning of the 2nd BGC
Diffuser status October 2017
Beam Finder Wire Assembly Undulator System
LCLS Extruded Vacuum Chamber Status
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
LCLS Week 2 The Extruded Aluminum vacuum chamber…
e-Beams Systems Update
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Production Management
LCLS Vacuum System Plans (July 07)
LCLS Undulator System Status and Schedule
Beam Finder Wire (BFW) Status
Alignment Diagnostic System Status
Presentation transcript:

D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong Lee - Engineer

D Walters Undulator Systems – BFW April 30, 2008 Quad Spool Production Laser Weld Plate and EP Clean Bake Oven Bake – 200 deg C for 24 hours RGA Bake – 200 deg C for 24 hours then RGA scan Package

D Walters Undulator Systems – BFW April 30, 2008 Quad Spool Status and Schedule All spools have been laser welded The rate limiting step is the plating and EP Seven have been shipped already to SLAC The balance (30) will arrive to SLAC during the month of May.

D Walters Undulator Systems – BFW April 30, 2008 Bellows Module Eight units are being assembled and are expected to arrive to SLAC on May 5, 2008 The other (27) units are in the pipe line and are schedule to arrive to SLAC on May 23, 2008

D Walters Undulator Systems – BFW April 30, 2008 Beam Finder Wire (BFW) LCLS Week Review Heinz-Dieter Nuhn Physicist Jim Morgan Engineer Jim Bailey Engineer Don Ghilardi Designer Scott Doran Designer

D Walters Undulator Systems – BFW April 30, 2008 Status of Production Repeatability Problems Start up of Chamber Aluminum Coating Organization of Baking Schedule

D Walters Undulator Systems – BFW April 30, 2008

D Walters Undulator Systems – BFW April 30, 2008 Repeatability Testing

D Walters Undulator Systems – BFW April 30, 2008 “Keyence” Displacement Sensors (Typ.) Repeatability Test Arrangement BFW Repeatability Test Arrangement and Results Physics Requirements: 80 Micron Horizontal & 30 Micron Vertical (RMS)

D Walters Undulator Systems – BFW April 30, 2008 BFW Vacuum Chamber Aluminum Coating The difficulty in coating the chambers has been in the tuning of the equipment. The tuning has been completed and the processing of chambers has been started. As of 4/28/08 4 chambers have been processed. It is possible to process as many as 8 chambers per week.

D Walters Undulator Systems – BFW April 30, 2008 Baking of Beam Finder Wire Dedicated Baking Station for the BFW Station has the ability to handle 1 to 3 units simultaneously. First units were baked at 80 deg C since it was assembled first then baked, later units will be baked (150 deg C) and then assembled. Maximum weekly throughput of 6 units

D Walters Undulator Systems – BFW April 30, 2008 Status Frame Weldment– Delivery Complete BFW Vacuum Chamber– Delivery Complete One unit shipped Two more units will be shipped 4/29/08 Two more units in the process of baking and Assembly. These are due to be shipped on 5/2/08

D Walters Undulator Systems – BFW April 30, 2008 Beam Finder Wire Schedule 4/25/ /29/ /2/ /9/ /13/ /20/ /27/ /3/ /10/200837