AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth.

Slides:



Advertisements
Similar presentations
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
Advertisements

L. Tavian, TE/CRG, Page 2 12 th September 2013 Accelerator Consolidation Workshop L. Tavian, TE-CRG.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
ZONE 18 CRYOGENICS M. Sanmarti On behalf of AT-ACR-OP section.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Olivier Pirotte AT-ECR-ME NTof Examples of cryogenic equipment installed by AT/ECR-ME O. PIROTTE.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
ITER Cryoplant System Status
Workshop Accelerator Operation 2012, SLAC S. Claudet (CERN, Geneva) on behalf of the “Cryogenics Group” Technology Department Operation of the LHC Cryogenics.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Hall B Cryogenics CLAS and CLAS12 David Kashy Hall B Lead Engineer May 26, 2010.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
CERN plans towards energy efficiency Serge CLAUDET Nov 2014.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
1LHC COOP, Uwe EPTING, CERN, ST/MO LHC - Technical Infrastructure Monitoring Uwe EPTING CERN, ST/MO.
N.Delruelle, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Design choices.
An introduction to Energy aspects at CERN June 2014.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Experience from large helium inventory management at CERN ILC Cryogenics and Helium inventory meeting CERN, Wed. 18 th of June 2014 D. Delikaris Technology.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
CV Industrial Control SystemsJCOV Meeting October 23, 2003 ST/CV ACTIVITY Industrial Automation ST/CV is responsible for the design and implementation.
Central He distribution service upgrade status and dedicated He distribution for AD K. Barth on behalf of TE/CRG ADUC and ELENA Meeting Wednesday, September.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
TE-CRG Activities D. Delikaris, TE-CRG.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Innovative He cycle Francois Millet.
Online Helium Inventory Monitoring of JLab Cryogenic Systems
N. Hasan1, P. Knudsen2 and V. Ganni2
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Hollow e- lens, Cryogenic aspects
Use Cases - Cryo Services Speaker: Klaus Barth on behalf of TE/CRG
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
The Fermi National Accelerator Laboratory is a U. S
Power cut 18kV cable for EMD404/E9 is heating
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
ILC Experimental Hall Cryogenics An Overview
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Cryomodules Challenges for PERLE
Hall D Cryogenic requirements
as a prototype for Super c-tau factory
Thermohydraulic behaviour of the cryogenic system
Presentation transcript:

AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth

Presentation Outline Cryogenics in General Cryogenics at CERN AT/ECR Cryogenics Organisation, inventory & geographic location Alarming procedures and contacts Summary

Cryogenics in general Low temperatures (120 K <) Provide cooling of superconducting magnets and cavities at temperatures down to 1.8 K Refrigerators at low temperatures inefficient Magnets have big “cold mass” and can quench External heat load  CRYOGENICS IS A SPECIAL UTILITY, WHICH TAKES LONG TO RECOVER! (1 hour stop needs 5 hours recovery)

Helium Cryogenics He 4 (atomic mass 4) exists in air (concentration 5.3 x ) He 4 is at room temperature ideal gas He 4 is not solidifying Very weak formation enthalpy Density of LHe: 125 g/liter 1 kg He = 8 liters LHe = 6 m 3 GHe cost approximately 30.- CHF He 4 gets 2.17K, 50 kPa Main properties of superfluid: Volumetric mass: 145 g/liter Capacity to transfer heat is very high Viscosity is very low

Cryogenics at CERN Cooling of superconducting magnets of the LHC accelerator Cooling of superconducting cavities of the LHC accelerator Cooling of the superconducting magnets and calorimeters installed in particle detectors for LHC and other experiments Cooling of test benches for LHC magnets and superconducting cables

Organisation (ECR / ACR cryogenics) ECR  cryogenics for experiments and (some) LHC test facilities ACR  cryogenics for accelerators and SM18/PM18 LHC test facilities Operation and Maintenance of all ACR & ECR cryogenic installation is done via an industrial contract (C169) by the consortium AIR LIQUIDE/ LINDE / SERCO (ALLS)

AT - ECR Organisation

North Area Fixed Target Experiments: COMPASS, NA49 (2), ATLAS/H8, CMS/RD5 NA LHC magnet test facility block4 CERN Axion Solar Telescope PA8 LHC Cable Test Facility Meyrin bldg. 163 Cryolab Central Liquefier Meyrin, bldg. 165 ATLAS Magnet Test Facility Meyrin, West Area Hall 180 BT magnet test bench (1.2 kW plant) Solenoid test bench (BOC plant) COLDEX, SPS BA4 AT/ECR 12 Cryoplants in operation (2003)

Alarming (TCR Procedure) Standby duty (piquet) operator for each cryo zone / control room Surveillance of the general alarm transmitted automatically from the ABB monitoring and supervisory system of the zone to the automatic alarm notification system (ANS) and in parallel to the alarm monitoring system of the technical control room (TCR) In case of a an alarm without a feedback of the responsible on-call operator (within 15 minutes), TCR operators try to reach cryogenics responsibles, respecting the following priority order: 1.) Call ALLS on-call operator of the zone (GSM & private number), if not reachable 2.) call ALLS on-call engineer (160683), if not reachable 3.) call CERN responsible technician of the zone, if not reachable 4.) call CERN responsible engineer K. Barth (163204, private tel. +33 (04) )

Alarming (ANS configuration 1) North Area zone (Prevessin Site) COMPASS, NA48 (LN2), NA49 (2), ATLAS/H8, CMS/RD5, LHC/Block 4 Crtl. Room: 76821, On-Call: , CERN Resp.: L. Stewart (160720) ALARME CRYOGENIE ZONE NORD LEP 1 Fault family: CRYO_GENERAL_PRE Fault member: CRYO-6 Fault code: 20 Fault description: DEFAUT GENERAL CERN Axion Solar Telescope (CAST) – LHC Point 8 CRYO REFRIG LHC CAST_COLDBOX /SR8 2875R DEFAUT GENERAL Crtl. Room: 76821, On-Call: , CERN Resp.: L. Stewart (160720) Fault family: CRYO_REFRIG_LHC Fault member: CAST_COLDBOX Fault code: 20 Fault description: DEFAUT GENERAL

Alarming (ANS configuration 2) Cryolab zone: 163, 165, 253, 243 (Meyrin Site) LHC Cable Test Facility (bldg. 163), Central Liquefier (bldg. 165), Helium Gas Management & Recovery (bldg. 243 & 253) Crtl. Room: 78802, On-Call: , CERN Resp.: R. Consentino (160713) ALARME CRYOGENIE BAT 163, 165, 253 Fault family: SERV_DIVERS_MEY Fault member: RDP-X25 Fault code: 1640 Fault description: COMMANDE BEEP BOITE FROIDE ATLAS WA zone: Hall 180 (Meyrin Site) ATLAS BT magnet test bench, Solenoid test bench Crtl. Room: 72365, On-Call: , CERN Resp.: S. Junker (164184)

Summary ECR cryogenics operation relies on good & fast communications with TCR in case of alarms While ANS is not working, calls from TCR is the only way to know about alarms, occurring outside normal working hours When ANS is working, calls from TCR will assure that cryo alarms have been noticed TCR is the communication interface to/from the users for information concerning cryogenics TCR is the co-ordination interface to the other external utilities (electricity, cooling and ventilation) required by cryogenics