Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.

Slides:



Advertisements
Similar presentations
New Construction: Small Office Prescriptive Path.
Advertisements

UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
The Saga Continues: Measure Interactions for Residential HVAC and Wx measures Regional Technical Forum April 23, 2014.
Ductless Heat Pumps in Residential Applications Proposed Research Plan.
Advanced Rooftop-Unit Control – Retrofit Savings Analysis Overview 1 February 13, 2015 RTF Commercial Rooftop-Unit Working Group Mira Vowles, BPA.
Review Tabled Agenda Item: Additional M&V Data on Ag Pump VFD Projects Determination of M&V requirements and/or deemed savings Regional Technical Forum.
Draft Standard Protocol for Cooling and Fan Savings from RTUs RTF March 1, 2011.
RTF 2012 Workplan Statements of Work January,
Residential Clothes Washers and Dryers Technical Subcommittee Ryan Firestone & Christian Douglass Regional Technical Forum March 10, PM.
Dairy Milking Machine Vacuum Pump VFD Savings Calculator Follow-up from the last RTF meeting with more field data Regional Technical Forum December 7,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee April 25, 2012 Mira Vowles, P.E., CEM Emerging.
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
RTF Staff, Subcommittee and Work Updates March 13, 2012.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum February 14, 2012.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
EvergreenEcon.com ESA 2011 Impact Evaluation Draft Report Public Workshop #2 August 7, 2013 Presented By: Steve Grover, President.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
RTU Measure Preparation for Review as Standard Protocol Staff Request for Authorization of RFP Funding from the Regional Technical Forum 28 June 2011.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Evaluation of the RTF Standard Protocol Fan and Cooling Savings from Commercial-Sector Heat Pump Units Rooftop Unit Working Group (RTUG) August 20, 2012.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
1 HVAC System Efficiency Upgrade Cost to Consumers RTF Current Estimates Compared to Estimates Provided by Mark Jerome Pacific Air Comfort February 20,
Of moderated conference calls on energy efficiency Utility Brown Bag Series BPA’s Rooftop Unit Service Pilot Jan 29, to 2 p.m. (PST) Facilitator:
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
Northwest Power and Conservation Council New Commercial Building Program Quest Presentation, Discussion and Decision of Proposed Approach to Estimating.
Rooftop Unit Working Group - RTUG - January 19, 2010 Up on the Roof…”Up on the roof I've found a paradise that's trouble proof, up on the roof.” —C. King/G.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Alternative Incentive Approaches BPA Energy.
Proposal to Allocate Remaining 2010 Funding RTF November 2, 2010.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Guidelines Revisions Defining What RTF Means by “Savings” December 17,
1 Proposed Changes to the RTF’s Heat Pump Deemed Savings and Cost- Effectiveness Draft 6th Plan Assumptions April 7, 2009.
GrocerSmart TM Energy Modeling Software -Revision Status Report- & -Request For Input- July 13, 2010.
Incremental Cost Assessments & Duct Sealing Optimization Project Bobbi Wilhelm March 25, 2008.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
RTF Staff, Subcommittee and Work Updates January 23, 2013.
RTF Staff, Subcommittee and Work Updates June 19, 2012.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
RTF Administrative Measure Decisions November 14, 2012.
Scientific Irrigation Scheduling Subcommittee Thursday, August pm – 3pm, PDT.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTUG January 19, 2010.
GrocerSmart Standard Protocol Update Regional Technical Forum March 18, 2014.
1 RTUG Project Management Contract Expansion And RTF 2010 Work Plan Budget Adjustments RTF March 2, 2010.
Presentation transcript:

Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012

RTUG Agenda January 31, 2012 Summary of the RTUG Subcommittee and contractors discussions to date Discussion of the draft protocol Presentation of the calculator including changes since last meeting Additional RTUG review prior to RTF review February 14 Questions the RTUG might pose to RTF

RTUG Issues Raised  22 annual sites plot  Confidence level  Weather data comparison  Cost of metering  Cost-effectiveness  How does the protocol meet RTF guideline standards? - What level of proof is needed?  Is there a way to structure the protocol to allow for flexibility in addressing component measures?  Additional measures? VSD, DCV (Y/N), heat pumps –RTF work underway, Premium Ventilation package, other…  Need program evaluation criteria to support the protocol  Calculator

RTU Protocol Confidence Limits Confidence limits are normalized relative to annual energy Confidence limits highest for metering periods starting in late June to mid-July Confidence limits of +- 5% are achieved with metering periods starting in late May and early August

RTU M&V Field Protocol 1. Definition of Key Terms 2. Eligible RTU Upgrades 3. Required Knowledge and Skills of Practitioner 4. Required Data Logger Commissioning 1. One Time Site Measurements and Descriptions 2. Data Logger Measurements 3. TMY3 Weather Data 1. Savings Estimation Steps 2. Sampling Procedure 3. Relationship to Other Protocols and Guidelines 4. Estimate of Typical M&V Cost

Annualized Energy Use / Savings Calculator

Next Steps  RTUG Subcommittee recommendations for RTUG review prior to February 14 RTF review  Questions or issues that RTUG participants might want to pose to the RTF in February