Project IDAgencyTitleRelevant Project ComponentCompletion Date LAE0332City of Long BeachLong Beach Park & Ride LotPRL with 400 parking spacesJune, 2014.

Slides:



Advertisements
Similar presentations
Où est notre école de Whitley Village ?. Whitley is situated in the Northwest of England in the county of Cheshire.
Advertisements

Tampa Walk-Bike Plan Phase III:
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Public recreation sites (Municipal) Public recreation sites (County) Pleasant Valley Park BERNARDS TOWNSHIP PARKS AND TRAILS Dunham Park Whitenack Woods.
B.I.K.E. | Boyle County Recommendations for Discussion Community Trails Forum M A R C H
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
Pacoima Town Center UP 273 Fall 2008 Lauren Ahkiam, Matthew Parrent, Beverly Wong, Nally Guo, Carlos Morales.
PROPOSED HPD BIKE-PED MASTER PLAN HPD PRESENTATION.
Town Core Streetscape and Accessibility Design Study  Elabd Architectural Illustration  Kathleen Ryan, Landscape Architect, ASLA Questions for Milton.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
T-FLEX Workshop Roger Snoble, L.A. Metro Chief Executive Officer October 29, 2007 Los Angeles County Metropolitan Transportation Authority.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
TRANSPORTATION ALTERNATIVES PROGRAM FY 2016 Project Priorities.
Urban Geography LAND USES IN DEVELOPED WORLD CITIES.
Houston Transportation Noella Cantu Chelsea Serrano-Piche Garrett Taylor ARCH 5502 Urban Design Studio Fall 2010.
Texas Tech University Bikeway Plan August 12, 2005.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
2701 Barnard Way Santa Monica Pier OCEAN LODGE HOTEL 1665 Ocean Avenue 20’ R.O.W 2701 Barnard Way APN: Barnard Way APN:
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
Vocabulary for Envelope Addressing Copyright 2015 Donna Barr All rights reserved by author
Section Uniform Motion Problems. Planes An airplane took off from Birmingham to Los Angeles, traveling at an average of 600 miles per hour. One.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Designing for Mobility Designing for Mobility Bicycle and Pedestrian Programs when you don’t have good Infrastructure (or $) for either!
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
The Church Street resident only parking lot, next to the sewer pump station is CLOSED due to the construction work on the Pump Station. Resident are to.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
Sustainable Traffic Management: Freiburg, Germany
Clarksville Pedestrian Safety Project. SR 12/US 41A “Pedestrian Warning Zone” Road Safety Audit.
The Main Street Bike Lane Project LADOT Bike Program.
Ile de France Notes Population- over 11 million (20% of France’s population) Cities- Paris (capital), Chartres, Versailles Industries- Tourism, Construction.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Draft Congestion Management Process Plan October 7, 2015.
Olympic National Park BY Libby and Lily. Olympic National Park is located in Port Angeles Washington. The park is 1,400 square miles large. If you compare.
Parallel and Perpendicular Lines
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Department of Public Works Proposed Underground Utility District 10-1 Mountain Street Lake Avenue to Hill Avenue.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Complete Streets Training
TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.
A Waterloo Region Case Study.  Waterloo Region  Connecting residents to your work  Ideas start off small  Plan for change  Moving forward  Your.
Arizona Forward Update
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Transportation Initiative Sales Tax Prioritization
US 92 Pedestrian Connectivity & Safety Assessment Study
THROUGH FUTURE WITH TRANSPORTATION
Project Overview Multimodal improvements to 22.5 miles of I-66
CITY OF LA PUENTE VALINDA COMMUNITY BIKEWAY PROJECT
Waltham Road (Andover – North Star).
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
US 92 Pedestrian Connectivity & Safety Assessment Study
Office of the City Attorney Council Work Session – September 12, 2017
Transportation Projects
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 16, 2018.
Bond Advisory Committee
Bike Boulevard 4.6 miles of bike lanes, bike dots, shared lane markings and guide signs on collector and local streets. March-April 2012.
Early Voting Starts Oct. 20 | Election Day Nov
St. Johns River-to-Sea Loop Trail Summit
Bay Trail.
Vocabulaire 2.3 Français II.
25 roundabouts Over 21,000 bikes on campus each day
What has Redevelopment done for Chico?
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 9, 2018.
AVAILABLE LOTS BLOCK 7 NATURE PARK BLOCK 16 BLOCK 6 OPEN SPACE
Design Standards.
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Circumnavigation (bike ride)    Evening, July 3  Art in the Park All Day
Presentation transcript:

Project IDAgencyTitleRelevant Project ComponentCompletion Date LAE0332City of Long BeachLong Beach Park & Ride LotPRL with 400 parking spacesJune, 2014 Project IDAgencyTitleRelevant Project ComponentCompletion Date LA0G1130Carson, City ofCitywide Bike and Pedestrian Improvements 1.1 mile Class II bike laneDec, 2016 LAF5627Duarte, City ofDuarte Gold Line Station Pedestrian & Bike Improvements 1.9 mile Class I bike pathOct, 2016 LAF3515Los Angeles, City ofSan Fernando Road Bike Path Phase III 2.5 mile Class I bike pathJan, 2016 LAF5518Los Angeles, City ofLA River Bike Path1.5 mile Class I bike pathDec,2016 LAF1414Los Angeles, County ofThird Street & La Verne Avenue Parking Lot PRL with 87 parking spacesOct, 2016 LAF5514Los Angeles, County ofVermont Avenue Bike Lane3.0 mile Class II bike laneDec, 2016 LA0G598Westlake Village, City of Thousands Oaks Boulevard Park & Ride Facility PRL with 75 parking spacesOct, 2016

YearROGCONOxPM , , , YearROGCONOxPM , , , YearROGCONOxPM