S1G Experiment Schedule Plan; 03292010 03292010 H. Hayano ILC10 GDE meeting.

Slides:



Advertisements
Similar presentations
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
Advertisements

RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Heat load study of cryomodule in STF
1 S1Global Experiment Writeup Outlining WIP B J. Kirby, R. Paparella, W.-D. Moller, N.Toge +
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
1 LCWS10 in Beijing DRFS Development (S. Fukuda) 27/03/2010 DRFS Development KEK S. Fukuda Introduction : DRFS R&D Plan Talks concerning with DRFS in LCWS10.
Control configulation for S1G module operation H. Hayano version 1.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
Signal port flange and beam pipe Norihito Ohuchi 2009/10/27122nd S1-G Webex meeting.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
Plug compatibility Document ILC10 cavity integration session H. Hayano.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
1 S1Global Experiment Writeup Outlining WIP A N.Toge +
Cavity and Cryomodule Plug-Compatibility To Reach Consensus Akira Yamamoto ILC-08, Chicago, Nov. 17, 2008 Nov. 17, 2008ILC-08 SCRF1.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
GDE meeting Beijing (Mar.27, 2010) 1 DRFS LLRF system configuration Shin MICHIZONO KEK LLRF lack layout for DRFS DRFS cavity grouping HLRF requirements.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Recent Result for the STF-2 Cryomodule Operation
S1G Experiment Schedule Plan
TDR guideline discussion on Cavity Integration
Cryomodule test stand at ESS site
ILC-SCRF Test Facilities considerations
Meeting for S1-Global module design Cryomodule and Cryogenics
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Norihito Ohuchi – KEK (presented by P. Pierini - INFN)
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Test plan of ESS HB elliptical cavity
5K Shield Study & HL Measurements
Construction and First Coo-down Test of cERL Injector Cryomodule
TTC meeting, Milano Global Design Effort
Presentation transcript:

S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting

Assembly work after cavity arrival (1) check the listed component (2) review the assembly procedure with arrived components (3) cavities connection in clean-room, leak check (4) He pipe welding at outside clean-room, leak check ( 5 ) Tuner and mag. shield assembly at outside clean-room ( 6 ) Cavities installation into cold-mass ( 7 ) Temp. sensor, RF cables (8) thermal anchor, super-insulator, installation into vacuum vessel (9) Installation into STF tunnel 8 weeks Module C (INFN module) Module A (KEK module) 9 weeks ~ ~ same procedure as phase1 cavities Connection work of Module C (INFN module) and Module A (KEK module) in STF tunnel 4 weeks Start immediately after clean-room available

S1G overall schedule cryomodule connection Module-C coupler + cavity process (one-by-one) S1G experiment term1 Cryogenics regular maintenance S1G experiment term2 Module-A coupler+ cavity process ( one-by-one ) Module-A coupler RF process ( one-by-one ) 11 weeks S1G main experiment warm-up cool down cool down Module-C coupler RF process (one-by-one) heat load meas. (1week) cavities: low-power check (6weeks) Parallel operation of RF power station #1 and #2 Only LN2 will be Continuous full day operation. LHe operation will be daytime only. Monday : 2K cool-down, Tuesday – Friday : 12:00 – 19:00 7hours for S1G experiment at 2K. heat load meas. (2weeks) 3 weeks 6 weeks 4 weeks ICHEP2010 July21-28,Paris Domestic Accelerator Meeting Aug 2010 IPAC2010 May23-28, Kyoto LINAC2010 Sep12-17, Tsukuba cryomodule disassemble setting of power distribution warm-up DRFS test. (3weeks) coupler& cavity process coupler RF process vector-sum (2weeks) cavity setup (4weeks) Low power checkRF processS1G Main experiment

June 2010 July 2010 cool down/system check warm-up cavity: low-power check cryomodule: heat-load meas. cavity: low-power check warm-up S1G schedule 1 cavity: low-power check MonTueWedThuFriSatSun MonTueWedThuFriSatSun cool down/system check from June 14 – July 16 : RF check, tuner check -> request DESY, FNAL, INFN participation.

Aug Sep coupler RF process (room-temp.) cool down coupler RF process (room-temp.) Cryogenics regular inspection coupler+cavity RF process S1G schedule 2 MonTueWedThuFriSatSunMonTueWedThuFriSatSun cool down from Sep 13 – Oct 1 : coupler+cavity process -> request DESY, FNAL participation.

Oct Nov cavity performance study, LD compensation Vector-sum operation Cryomodule Heat-load meas. S1G schedule 3 MonTueWedThuFriSatSun MonTueWedThuFriSatSun Cryomodule Heat-load meas. DRFS test from Oct 4 – Oct 29 : cavity gradient, LD study -> request DESY, FNAL, INFN participation. from Nov 15 – Nov 28 : vector sum op study -> request DESY, FNAL, INFN participation.

Dec DRFS testwarm-up S1G schedule 4 MonTueWedThuFriSatSun DRFS test

1. : Low power measurement of each 8 cavities. (cavity people) measurement and set up of cavity; Q-values, frequency, main coupler coupling mechanical tuner response, piezo tuner response, mechanical vibratino mode, HOMs, etc. 2. : Heat load measurement ( static ) (N. Ohuchi and H. Nakai) 5 weeks ( ) 1 week ( ) S1G experiment term1 : 6 weeks before summer shut-down

1. : Main coupler RF process of one by one. (cavity people) #1 Klystron will be connected to Module-C cavities one-by-one (DESY cavity, FNAL cavity) #2 Klystron will be connected to Module-A cavities one-by-one (MHI cavities) Parallel coupler processing one + one /week; total 4 weeks. 4 weeks ( ) Cryogenic system in maintenance and yearly inspection, KEK also has 2 days yearly electronic system maintenance ( 2 days AC power off laboratory-wide) Summer holiday season. S1G experiment term summer shutdown : 7 weeks 2. : Main coupler + Cavity RF process of one by one. (cavity people) #1 Klystron will be connected to Module-C cavities one-by-one (DESY cavity, FNAL cavity) #2 Klystron will be connected to Module-A cavities one-by-one (MHI cavities) Parallel coupler+cavity RF processing one + one /week; total 4 weeks. at room temperature at 2K temperature 3 weeks ( )

(0) Optimization of Waveguide distribution (power distribution ratio) (HLRF group ) (1) Set-up of FF-table, preparation of vector-sum circuit ( LLRF group ) 1. : cavity performance study, set-up of LD compensation for each cavity 4 weeks ( ) gradient check, LD measurement and compensation S1G experiment term2 : 11 weeks

3. : Vector-sum operation 2. : Cryomodule Heat-load meas. Static and dynamic heat-load 2 weeks ( ) Proposal from Michizono-san; 03_04_2010 (0) Optimization of Waveguide distribution (power distribution ratio) (HLRF group ) (1) Set-up of FF-table, preparation and setup of vector-sum circuit ( LLRF group ) 8 cavities Vector Sum set-ups: 5 days Vector sum control 8 cavities : 2 days Vector sum control IF-mix: 1 day Adoptive FF: 1 day RF power fluctuation: 1 day 4. : DRFS study DRFS study cavity performance: 1 day adaptive FF: 2 days RF power fluctuation: 2 days sag compensation: 2 days feedback algorithm: 1 day loaded Q monitor: 1 day fast interlock performance: 1 day 3 weeks ( ) Connect 1 small klystron to two cavities in tunnel, LLRF also in tunnel. : 3 days

25/12/2009 Proposed WG Layout for S1 Global module-C (DESY,FNAL cavities) module-A (KEK cavities)

DRFS Demonstration DRFS Demonstration test is approved for 1 week period. 2 unit of DRFS is Planned to be manufactured in FY2009 and FY2010. DC PS and Mod anode PS are in the surface floor, HV cables come down to the tunnel.

overall control configuration of S1Global module RF signal generation timing generation Modulator cavity PIEZO HV driver Tuner motor driver Vacuum, Temp, RF monitors Digital LLRF klystron driver amp RF-SW on/off control (RF amplitude reference) (RF phase reference) scopes STF-net cryomodule Temp monitors cryomodule PIEZO signal generation

cavity PIEZO HV driver Tuner motor driver Vacuum, Temp, RF monitors cryomodule Temp monitors cryomodule digital LLRF LAN (STF-net) Klystron#2 station (surface) S1G cryomodule in tunnel Temp Feed-through for Temp Feed-through T-tube extension RF power meter RF monitors tuner motor tuner PIEZO RF cables PIEZO signal generation vector sum control pulse motor drive wire PIEZO HV coaxial cable RF cables control racks in surface control racks in tunnel pulse motor drive wire HV coaxial cable *black indicates KEK coverage

END