SUMMARY. Summary Instructions After the checklist is filled out and rationale documented, the ID Team discusses the responses, reads the category definitions.

Slides:



Advertisements
Similar presentations
Information Needs for the Integrated F&W Program (ESA and Power Act) Jim Geiselman - BPA.
Advertisements

1 Measuring Progress: Monitoring and Evaluation in WRIA 8 WRIA 8 Salmon Recovery Council November 19, 2009 Scott Stolnack WRIA 8 Technical Coordinator.
3-Year Implementation Schedule. What is the 3-Year Implementation Schedule? A list of prioritized projects for implementers with a time frame to complete.
MIM and Adaptive Management. PURPOSE of ADAPTIVE MANAGEMENT: To achieve long- term desired conditions Emphasis should be placed on long-term monitoring.
LENTIC SYSTEMS ASSESSING FUNCTIONALITY LENTIC SYSTEMS.
1 The PFC concept is: §Based on the fact that systems need to be functional before they can produce aquatic or riparian values – or desired conditions.
IS-700.A: National Incident Management System, An Introduction
Yakama Nation Pacific Lamprey Recovery Project Core Data And Monitoring Framework.
Step 4: Complete PFC assessment §17 questions about attributes and processes §Reminder – PFC based on: l Water (hydrology), l Vegetation, and l Soil &
Riparian Zone Habitat Assessment Vegetation and More.
Vegetation Soil, Landscape Hydrology Process for Assessing Proper Functioning Condition Vegetation Items.
Lec 12: Rapid Bioassessment Protocols (RBP’s)
Natural Riparian Resources Vegetation Landscape/Soil Water.
Healthy Streams Through Bringing People Together
Watersheds Capture, Store And Safely Release Water.
Capability Maturity Model (CMM) in SW design
Designing a Monitoring Program Ed Krumpe CSS 496 “When we try to pick out anything by itself, we find it hitched to everything else in the Universe” J.
Advantages of Monitoring Vegetation Restoration With the Carolina Vegetation Survey Protocol M. Forbes Boyle, Robert K. Peet, Thomas R. Wentworth, and.
How to Write Goals and Objectives
Program Management Satisfy requirements of all individual projects with minimal resources Human resource is the most expensive Leadership Methods of documenting.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
MULTIPLE INDICATOR MONITORING (MIM) PROTOCOLS. 8. Greenline-to-Greenline 9. substrate – in the x section, and 10. residual depth 1.Stubble ht, 2. bank.
PFC Assessment Approach & Definitions Creeks and Communities.
Principles of Assessment
S/W Project Management
CMER Research Update George McFadden CMER Study Implementation Coordinator.
One Voice – One Plan Office of Education Improvement and Innovation MI-CSI: Do Stage Implement Plan and Monitor Plan.
Striving for Quality Using continuous improvement strategies to increase program quality, implementation fidelity and durability Steve Goodman Director.
Inventory, Monitoring, and Assessments A Strategy to Improve the IM&A System Update and Feedback Session with Employees and Partners December 5, 2011.
Chapter 7: Rangeland Inventory and Monitoring 1. What is rangeland inventory? 2. What is rangeland monitoring? 3. What vegetational attributes are commonly.
Preparing to Use This Video with Staff: Materials/Resources: 1.Print copies for each person of the following from the Resource Tab: a)Grain Size Visual.
Habitat Restoration Division Coastal Program Partner For Wildlife Program Schoolyard Habitats Chesapeake Bay Field Office U.S. Fish and Wildlife Service.
Rangeland Health Assessment and Monitoring (Framework for Ecological Site-Based Assessment and Monitoring in Mongolia) 7 July 2007 Ulan Bator, Mongolia.
INTERNATIONAL SOCIETY FOR TECHNOLOGY IN EDUCATION working together to improve education with technology Using Evidence for Educational Technology Success.
Step 1: Assess Riparian Resource Function Using PFC §1d. Complete PFC assessment l 17 questions about attributes and processes l Reminder – PFC based on:
1 The PFC concept is: §Based on the fact that systems need to be functional before they can produce aquatic or riparian values – or desired conditions.
1c. Determine Reach Potential 1b. Review Existing Information & Delineate & Stratify Reaches 1a. Identify Assessment Area & Assemble ID Team 1d. Complete.
Assessing Riparian Function YOUR remarkable RIPARIAN.
1 CREEKS & COMMUNITIES & RIPARIAN PROPER FUNCTIONING CONDITION Introduction.
Riparian Proper Functioning Condition A process for assessment A defined condition A starting point A common language An interdisciplinary team approach.
Water Quality Program Financial Assistance Progress and Plans for Meeting RCW Requirements (Joint Legislative Audit and Review Committee)
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Multiple Indicator Monitoring (MIM) Monitoring the Effects of Management on Stream Channels and Streamside Vegetation.
Transitions in Rangeland Evaluations David A. Pyke & Jeffrey E. Herrick Jornada Experimental Range Forest and Rangeland Ecosystem Science Center.
ASSESSING PROPER FUNCTIONING CONDITION for LENTIC AREAS Introduction
Biomass Production Estimation
RIPARIAN PROPER FUNCTIONING CONDITION A Tool for Integrating the Fundamental Sciences into Collaborative Decision-Making.
Data Report July Collect and analyze RtI data Determine effectiveness of RtI in South Dakota in Guide.
National Forest System Grazing Objectives 1.Manage range vegetation to protect basic soil and water resources, provide for ecological diversity, improve.
Habitat Mapping of High Level Indicators at Multiple Scales for Fish and Wildlife.
George Peacock, Team Leader Grazing Lands Technology Development Team Central National Technology Support Center 2010 Southern Regional Cooperative Soil.
Using Multiple Indicator Monitoring Protocols. What is MIM Streambank Alteration?  The number of lines on the plot that intercept hoof prints, hoof shears.
Performance Improvement Project Validation Process Outcome Focused Scoring Methodology and Critical Analysis Presenter: Christi Melendez, RN, CPHQ Associate.
Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project No Jason McLellan Confederated Tribes of the Colville Reservation January.
OWEB Effectiveness Monitoring Program Key Components  Effectiveness Monitoring Workshop  Development of definitions  Effectiveness Monitoring of: 
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Assessment Prioritization Activity (Design/Implementation) Monitoring ADAPTIVE MANAGEMENT Modification.
Continual Service Improvement Methods & Techniques.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Planning and Monitoring What is a habitat management plan? Why prepare a management plan? What sections comprise a management plan? How is each section.
Planning Riparian Buffer Practices in FY16 Rachel Maggi NRCS West Area Biologist.
Monitoring Riparian Grazing Use. Why Do We Monitor?  To provide accountability for our actions.  To provide feed back on results.  To aid in our decision.
Natural Riparian Resources Vegetation Landscape/Soil Water.
BLM Standards & Guidelines
Performance Improvement Project Validation Process Outcome Focused Scoring Methodology and Critical Analysis Presenter: Christi Melendez, RN, CPHQ Associate.
Integrated Riparian Management
Performance Improvement Project Validation Process Outcome Focused Scoring Methodology and Critical Analysis Presenter: Christi Melendez, RN, CPHQ Associate.
LENTIC GEOMORPHOLOGY.
Presentation transcript:

SUMMARY

Summary Instructions After the checklist is filled out and rationale documented, the ID Team discusses the responses, reads the category definitions and makes a functionality determination – the rationale for the rating is completed at this time Establish photo points where possible to document noteworthy attributes on the site – make photos demonstrate rationale!

Summary Instructions Indicate apparent trend (one time observation) for Functional at Risk ratings. The intent here is that FAR down reaches will cause management to red flag as the highest priority. Unless there are clear indicators of apparent trend – indicate not apparent

Standard Checklist (lotic) Low Relative condition in functioning-at-risk High

Making a Summary Determination (Functional Rating) Are there any questions answered “no?” If here are “no” answers, is the attribute or process important to function? Usually a “no” answer results in a finding of functional at risk. Are all or most questions answered “no”? If all or most questions, particularly those that are critical to function, the finding is “nonfunctional.” Is there an apparent upward trend? By definitions, an upward apparent trend results in a finding of “functional-at-risk.”

Making a Summary Determination (Apparent Trend) Apparent Trend: A gross estimate of the direction of change in resource attributes based on a one-point in time observation of field indicators

Making a Summary Determination (Apparent Trend) Are woody species regenerating? Are herbaceous species reproducing? Are plants vigorous? Is the channel degrading? Is the channel aggrading? Are streambanks actively eroding?

Standard Checklist (lotic)

Riparian Vegetation Recovery PFC

Resource Status and Values Vegetation Livestock Forage Aquatic Habitat Channel Stability

PFC early seral PFC mid seral & closer to DFC

PFC Applications Useful to help prioritize of Planning, Monitoring, & Restoration Activities:  Triage: “ The determination of priorities for action in an emergency.”  Allows monitoring to be focused on addressing issues/”no” answers.  Makes efficient use of time and dollars.  Should focus restoration activities on “at-risk” reaches.

PFC Applications Provides a common, consistent, easily understood communication tool regarding the basic condition of riparian-wetland areas Avoids riparian resource management “Tower of Babel”

Riparian Management Process Step 1: Inventory/assess current & potential condition Step 2: Define/stratify complexes Step 3: Inventory/General Assessments (PFC) Step 4: Select DMAs (Designated Monitoring Areas) Step 5: Establish Site Spec. Desired Conditions, Objectives, & Indicators (MIM) Step 6: Develop/adapt grazing strategy & implement Step 7: Monitor annual indicators each year and condition indicators every 3-6 years (MIM) Step 8: Adapt grazing strategy, annual indicators &/or criteria as needed to meet desired conditions

Stratify Reaches/Complexes/Sites (Experienced Professionals) Professional AssessmentNon-Professional Assessment Inventory Proper Functioning Condition (PFC) Assessment Integrated Rip. Evaluation Guide Level II (R4 FS) Skill Level Experienced Professionals w/ assistance from Field Technicians Inventory General Condition & Value Inventory (ID process)) Stream Visual Assessment Protocol - SVAP (NRCS) Skill Level Trained Field Technicians w/ assistance from Professionals ID Issues, Objectives & Prioritize Reaches/Complexes/Sites for Mgt, Restor., and/or Monitoring (Experienced Professionals) Select Designated Monitoring Areas (DMAs) for Sites Requiring Additional Information Monitor to track achievement of objectives (Experienced Professionals) Monitor DMAs Use observational procedures (e.g. photos) for gross changes & simple issues (Experienced Professionals) Use quantitative/measured protocols to detect finer changes/trends (Trained Field Technicians) Analyze/Evaluate Data Complete (PFC) using trend monitoring data & implement Adaptive Management (Experienced Professionals) Repeat monitoring to evaluate management

Monitoring Data & PFC Monitoring data can go far in supporting a PFC assessment -- where monitoring data is collected, PFC should be validated

Multiple Indicator Monitoring Metrics Annual Use Metrics (Short-Term Monitoring) Median & Mean Stubble Height % Streambank Alteration % Woody Use Mean Stubble Height for Dominant Key Species Condition Metrics (Long-Term Monitoring) % Stable Streambanks % Covered Streambanks % Saplings and Young Woody Vegetation % Mature Woody Vegetation (and dead) Vegetation Erosion Resistance Rating (Greenline Stability Rating) % Hydric Vegetation % Hydric Herbaceous Mean Greenline-Greenline Width (GGW) Ecological Status Wetland Rating Mean Width & Depth, Substrate Composition

There is no silver bullet and frankly you probably don’t need one. It is far more important to be able to find the right kind of gun, be able to load the gun … and perhaps most importantly, be able to figure out where the werewolf is. Matthew OliphantMatthew Oliphant, Useability Works,