NSTX Centerstack Fabrication Status James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science.

Slides:



Advertisements
Similar presentations
NSTX Centerstack Fabrication James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science.
Advertisements

NSTX-U NSTX Upgrade Project – Office of Science Review – February 4, NSTX Centerstack Fabrication Status James H. Chrzanowski and the NSTX Upgrade.
PPPL,NFRI Study of Error Field and 3D Plasma Response in KSTAR J.-K. Park 1, Y. M. Jeon 2, In collaboration with J. E. Menard 1, K. Kim 1, J. H. Kim 2,
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC SPG NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTXU Project Update Jim Chrzanowski, Larry Dudek, Erik Perry, Tim Stevenson, Ron Strykowsky and the Project Team October 4th, 2013 NSTX-U Supported by.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Some Halo Current Measurements in 2009 S.P. Gerhardt Thanks to: E. Fredrickson, H. Takahashi, L. Guttadora NSTX Results Review, 2009 NSTX Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Automatic Rampdowns S. Gerhardt, et al. and the NSTX Research Team Meeting name Location Date NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
J-W. Ahn 1 K.F. Gan 2, F. Scotti 3, R. Maingi 1, J.M. Canik 1, T.K. Gray 1, J.D. Lore 1, A.G. McLean 4, A.L. Roquemore 3, V.A. Soukhanovskii 4 and the.
NSTX Team Meeting August 9, 2011 NSTX TF Update Team Meeting August 9, 2011 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

NSTX Centerstack Fabrication Status James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 December 11-12, 2012 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics Old Dominion ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Progress Since Last Review A great deal of work and accomplishments have been achieved since the last review. –TF Conductor Sub-assembly procurement is proceeding smoothly –Soldering of cooling tubes in TF conductor (Full TF Bundle) is nearly complete –Centerstack Casing fabrication is nearly complete –Coil manufacturing area for Centerstack is in full operation –Final tooling fabrication and procurement for OH is underway –OH and PF conductor has been completed –Completed testing of the Aquapour –Outer TF Coils procurement has been awarded –Inner PF coil contract requisition has been submitted –Delivery of Centerstack Assembly is scheduled for February 2014

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, General Arrangement 3 TF Flex Bus and Support Structure Centerstack Assembly Outer TF Coils Major Centerstack Components Umbrella Structure Vacuum Vessel

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Critical Path Schedule

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, TF Conductor Assembly Major Tool and Edison Welding Institute are manufacturing the TF conductor assemblies. Initially a slow start due to the final development of the Friction Stir Welding (FSW) procedures and the necessary NDT testing, but production is now moving smoothly. 36 conductors required for the full TF bundle have been delivered Quadrant #5 conductors in January Quadrant #6 conductors in February.

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, TF Solder Operations From Solder Trials to Operations: –Solder trials were successfully completed at PPPL with assistance of a Solder Consultant –Solder operations are now moving along smoothly –29 conductors have already been soldered Materials: –Solder paste Sn /3.5 Ag w/ GMS based “R” flux [Glyceryl Mono-stearate, Terigitol (a detergent) and Cyclohexlamine Hydro-bromide] Solder Temperatures: –Liquidus ~221º C (430º F) –Soludus~ 246º C (475ºF) –TF solder temperature~ degrees C to ensure wetting

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Area Setup- TF Fabrication VPI Station

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Safety Involvement The fabrication & assembly of the Centerstack is being performed by PPPL personnel at the laboratory. Safety is an important part of the PPPL culture Safety is incorporated in all aspects of the development program- carryover to production Industrial Hygiene (IH) has participated in the planning and setup of the coil area Job Hazard Analysis (JHA’s) are being developed for each procedure Procedures: Clearly identify safety precautions for specific operations Personnel protective equipment (PPE’s) being used Involvement of all safety groups

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Tooling Fabrication and Procurement Inner TF Bundle- Tooling and Fabrication –Operations are moving ahead smoothly –All stations are in full operation Post solder bake √ Sandblast √ Priming and cure √ Application of turn insulation √ Install conductors in mold √ Align conductors and complete assembly of mold- In process –Awaiting lid for Quadrant mold Vacuum Pressure Impregnation of TF Quadrant- January 2013 –Full TF bundle mold has been awarded to Reno Machining- delivery in late January

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, TF Conductor Preparation Sandblasting Priming Turn Insulation Post Solder Bake

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, TF Quadrant Assembly Install conductors into mold

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, VPI Operations Developed procedures and tooling for VPI operations Trial VPI was successful

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, VPI Process Cycle

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, J.H. Chrzanowski 9/7/12 NSTX-U Center Stack Coils VPI Cycle [CTD-425] Coil Fill Period [Fill/soak & remove lines] Cure Time Ramp down Period Ramp up period Post Cure Time Ramp up period 15 hours 24 hours 10 hours Ramp up 6 10 ° C / hour Ramp down ° C per hour Hours Temperature degrees C Ramp up 7 10 ° C per hour Temperature degrees C

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Full TF Mold The full TF mold is being manufactured by Reno Machine (Conn.) – –PPPL is planning a visit in December –Scheduled for February delivery

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Tooling Fabrication and Procurement OH Solenoid- tooling –OH copper conductor has been received –OH conductor sandblasting & priming requisition in system –Induction braze station OH braze joints- is being commissioned OH joint braze qualification program will begin in January –Tension unit & taping machines are in fabrication –OH Mold will be out for bids in January

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, OH Solenoid Winding Facility

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, OH Winding Station Tension unit being fabricated in house Taping machines complete OH winding support tooling complete Turning fixture delivered Induction braze station (Complete)

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Rolled Aluminum Cylinder wrapped with epoxy/glass insulation represents TF Bundle Maintains true TF OD and clearance space at top and bottom Will use actual mold segments and alignment pins Tested: 1. Filling of Aquapour √ 2. Curing of Aquapour with heating blankets √ 3. Washing Out of Aquapour √ T ESTING OF A QUAPOUR FOR C ENTER S TACK F ABRICATION

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Centerstack Casing The Centerstack Inconel casing is being manufactured by Martinez & Turek located in California. They have been making good progress –PPPL visited facility in November just prior to final welding Delivery is scheduled for December 2012

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Centerstack Casing Upon arrival of the casing 500 Inconel studs will added to the outside surfaces (original casing shown below) 696 Tiles with diagnostics will then be mounted

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Plans Forward for Centerstack Components Inner TF Bundle –VPI first Quadrant- January 2013 –VPI Full Bundle- May 2013 OH Solenoid –Begin winding OH solenoid- July 2013 –VPI OH Solenoid- October 2013 Centerstack Casing –Delivery is scheduled for December 2012 Centerstack Assembly- –Final assembly will occur between November 2013 to February 2014 –Developing Assembly procedures

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Plans Forward- continued Inner Poloidal Field Coils –Requisition has been submitted to procurement- RFQ –Delivery summer 2013 TF buss and support components –Purchase Order has been placed with Zenox Corp. (TF Flexes) –Super-nuts in procurement February 2013 –OTF Lead extensions (January procurement) Deliver completed Centerstack Assembly - February 2014 MT Torque-nut™ Flex-Bus (Cu-Cr-Zr)

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Outer TF Coils The contract for fabricating (2) Outer TF coils was awarded to Everson- Tesla. –Soldering of the cooling tubes has started –February 2013 delivery

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11-12, Conclusion The risks associated with the production of the TF conductors have been addressed (Major Tool/Edison Welding) The soldering trials have been completed and production nearly complete (Retired risk) The TF bundle manufacturing facility is in full operation –Awaiting delivery of molds and completion of procedures The R&D and procedures for VPI are complete & first VPI is scheduled for January The Aquapour trials are complete Tooling for the OH solenoid is being fabricated The OH conductor sandblast/priming contract is awaiting bids The Inconel casing is scheduled for delivery in December Contract for the OTF has been awarded Requisition for Inner PF coils is in procurement The production of the Centerstack Assembly has begin