Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

WBS: Lowest level OBS: Lowest level
CP Chapter 4 Schedule Planning.
Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
Advanced Project Management - CPH
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Chapter 10: Project Schedule Planning
Creating the Project Plan
MGMT 483 Week 8 Scheduling.
Systems Analysis and Design 9th Edition
1 Operations Management Lesson 5 Project Management.
ISP-2010 Network Evaluation & Analysis ISP Project Management.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Time Management
Project Management Techniques.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Systems Analysis & Design Sixth Edition Systems Analysis & Design Sixth Edition Toolkit Part 4.
Roberta Russell & Bernard W. Taylor, III
Project Time Management
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project Management and Scheduling
Project Management Chapter 3 BUSI 2106 – Operations Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
CHAPTER 3 PROJECT MANAGEMENT.
Toolkit 4.
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
ENGM91 ACTIVITY PLANNING Unit 2
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
Project Management: A Managerial Approach
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Project Management Fundamentals - Planning Tools 1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
PROJECT MANAGEMENT.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Exercise – A small building.
Presentation transcript:

Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas

Richard Fisher 2 The University of Texas at Dallas Project Management A PROJECT is a set of tasks (activities) with a definite beginning and ending point. Phases –Project Planning –Project Scheduling –Project Tracking

Richard Fisher 3 The University of Texas at Dallas Tasks F Task (Activity) --A work component needed to be accomplished; a task within the overall project that has a definite beginning and ending point. The activity consumes time.

Richard Fisher 4 The University of Texas at Dallas Work Breakdown Structure (pp 88-89) F Developed before the dependencies are identified and activity durations are estimated. F List of tasks and duration (work) required for project F WBS is foundation for project schedule

Richard Fisher 5 The University of Texas at Dallas Decomposition F Breaking a Task into smaller Tasks or Sub- Tasks F The lowest level tasks are independent, manageable units and can be performed in a reasonable (measurable) amount of time F The project manager is typically responsible for defining all top level tasks

Richard Fisher 6 The University of Texas at Dallas Decomposition Example F Using Microsoft Word as a decomposition tool F WBS Example WBS Example F Student setting up their first web page on the UTD server assignmentassignment F Fence Assignment (Individual Assignment 1) Fence Assignment F MS Project Assignment (Individual Assignment 2) MS Project Assignment

Richard Fisher 7 The University of Texas at Dallas Steps in Project Management Network Analysis F Task Definition and Decomposition F Define Relationships F Estimate Task Times F Construct Diagram F Network Evaluation F Project Tracking and Revision

Richard Fisher 8 The University of Texas at Dallas PM Networks ACTIVITY (TASK) --A work component needed to be accomplished; a task within the overall project that has a definite beginning and ending point. The activity consumes time. EVENTS -- Designates the beginning and / or ending of activities. A point in time. Also shows the precedence relationships of the activities. NETWORK -- A combination of Activities and Events that describe the logic of the project. There is one definite starting and ending point.

Richard Fisher 9 The University of Texas at Dallas Relationships F Relationships determine task sequencing F Finish-to-Start –Task B cannot start until Task A is finished –Most common type F Start-to-Start –Task B cannot start until Task A is started –A delay is often used in this relationship AB A B

Richard Fisher 10 The University of Texas at Dallas Relationships F Finish-to-Finish –Task B cannot finish until Task A is finished F Start-to-Finish –Task B cannot finish until Task A is started A B A B

Richard Fisher 11 The University of Texas at Dallas Precedence Relationships Task C may not begin until both A and B have been completed. A and B may occur concurrently and are parallel tasks. B A CD B A C F D E Task D may begin after B is completed. Task E may begin after C is completed. A-B-D-F and A-C-E-F are parallel paths.

Richard Fisher 12 The University of Texas at Dallas CPM- Critical Path Method CRITICAL PATH -- The path through the network consisting of several activities whose total activity times are the longest of any path through the network. The most pressing, dangerous, risky path through the network. Usually denoted by heavy lines through the activities on the Critical Path. CRITICAL PATH TIME -- Total time of all activities on the critical path.

Richard Fisher 13 The University of Texas at Dallas CPM Terminology EXPECTED TIME of a task (activity) EARLIEST START -- Earliest time expected to complete all previous tasks. EARLIEST FINISH = ES + T for a task. LATEST FINISH -- Latest time a task can finish and still allow the project to finish on time. LATEST START = LF - T for a task. SLACK TIME = LS - ES or LF - EF (there is NO slack on the CP) T ES EF LF LS S

Richard Fisher 14 The University of Texas at Dallas Network Evaluation Steps 1. Construct network diagram showing tasks, relationships and task times using standard format 2. Define the various paths through the network 3. Moving from left-to-right calculate the ES (Earliest Start) and EF (Earliest Finish) time for each task 4. Define Critical Path 5. Moving from right-to-left calculate the LF(Latest Finish) and LS (Latest Start) for each task 6. Note Slack Times

Richard Fisher 15 The University of Texas at Dallas Sample Laboratory Example

Richard Fisher 16 The University of Texas at Dallas Task (Activity) Diagramming On the critical path: ES = LS & EF = LF T ESEF LFLS (Expected Task time) 1. Description of Task goes here

Richard Fisher 17 The University of Texas at Dallas Sample Laboratory CMP 1. Begin project 3.Inspect lab 2. Build lab 4.Install equip 6. Train Staff 5.Recruit staff 7. Pilot eval 8. End project

Richard Fisher 18 The University of Texas at Dallas Sample Laboratory CMP

Richard Fisher 19 The University of Texas at Dallas Gantt Charts F Use Horizontal Bars to represent Tasks on a Horizontal Time Line

Richard Fisher 20 The University of Texas at Dallas Gantt Charts

Richard Fisher 21 The University of Texas at Dallas PERT/CPM Charts F The Program Evaluation Review Technique (PERT) F Critical Path Method (CPM) F The distinctions between the two methods have disappeared over time, and today the technique is called either PERT, CPM, or PERT/CPM

Richard Fisher 22 The University of Texas at Dallas PERT/CPM Charts F Overview of PERT/CPM –PERT/CPM is called a bottom-up technique –Project tasks –Once you know the tasks, their duration, and the order in which they must be performed, you can calculate the time that it will take to complete the project

Richard Fisher 23 The University of Texas at Dallas PERT/CPM Charts F PERT/CPM Tasks –Task box –Task ID –Task name –Task Duration –Start Day/Date –Finish Day/Date

Richard Fisher 24 The University of Texas at Dallas PERT/CPM Charts F A PERT/CPM Example with Five Tasks

Richard Fisher 25 The University of Texas at Dallas Web Page Example

Richard Fisher 26 The University of Texas at Dallas Project Tracking Tips F Update Project as needed F Make sure tasks are broken down enough to see progress (or lack of progress) F Poor “task status” communication often means poor progress F Watch for changes in Critical Path F Make sure that there are no “resource conflicts”