Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Andres Lepage Steven Stein ROOSEVELT ISLAND SOUTHTOWN BUILDING.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Proposal Design of Chevron and Diagonal Braced Frames Ting Wall Façade Green Roof INTRODUCTION, BUILDING STATS, + OVERALL CONCEPT CONCLUSIONS,
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
FDA CDRH Laboratory Timothy Mueller Senior Thesis, Spring 2006
the Franklin Square Hospital Center
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Presentation transcript:

Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008

Gen*NY*Sis Center for Genomics Meral Kanik Structural Option April 14, 2008  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions

Building Statistics University at Albany Owner: University at Albany Einhorn Yaffee Prescott Architecture & Engineering P.C. Architect/Engineer: Einhorn Yaffee Prescott Architecture & Engineering P.C. Rensselaer, NY Location: Rensselaer, NY Cancer Research Laboratories Function: Cancer Research Laboratories 117,400 square feet Size: 117,400 square feet 87 feet Height: 87 feet 4 above grade, 1 below grade Number of Stories: 4 above grade, 1 below grade $45 million (base building cost) Cost: $45 million (base building cost) Fast Track Delivery Project Delivery Method: Fast Track Delivery University at Albany Owner: University at Albany Einhorn Yaffee Prescott Architecture & Engineering P.C. Architect/Engineer: Einhorn Yaffee Prescott Architecture & Engineering P.C. Rensselaer, NY Location: Rensselaer, NY Cancer Research Laboratories Function: Cancer Research Laboratories 117,400 square feet Size: 117,400 square feet 87 feet Height: 87 feet 4 above grade, 1 below grade Number of Stories: 4 above grade, 1 below grade $45 million (base building cost) Cost: $45 million (base building cost) Fast Track Delivery Project Delivery Method: Fast Track Delivery  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008

 Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Typical Floor Layout Labs/classrooms Offices Vertical Egress Corridor/gathering Meral Kanik Structural Option April 14, 2008

 Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Existing Structure Meral Kanik Structural Option April 14, 2008

Typical Bay  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions 4 ½” normal weight concrete 2” composite metal deck f’c = 3.5 ksi Fy = 50 ksi Meral Kanik Structural Option April 14, 2008

Lateral System  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Non moment-resisting eccentrically braced frames Bracing diagonal of HSS8x8x5/16 steel Wind controlled Meral Kanik Structural Option April 14, 2008

Proposal  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Replace steel gravity system Employ hollow core planks Remove steel braced frames Utilize concrete shear walls Evaluate vibration effects Implement PSU sustainable designs Reduce erection time Evaluate price differences Meral Kanik Structural Option April 14, 2008

Proposal  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Transfer the design from SUNY University at Albany to Penn State’s Hershey Medical Center Meral Kanik Structural Option April 14, 2008

New Design Criteria  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions N Meral Kanik Structural Option April 14, 2008

Gravity Loading  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Must account for new roof loading Previous machine weight of 160 kips Add live load roof garden assembly Area of roof garden = ft psf Meral Kanik Structural Option April 14, 2008

Hollow Core Planks  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions 4HC8 + 2” topping20” square columns 20LB2428IT20 Meral Kanik Structural Option April 14, 2008

New Lateral Loads  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Cast In Place Concrete Shear Walls Precast Concrete Shear Wall Panels Meral Kanik Structural Option April 14, 2008

New Lateral System  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 Use vertical egress as shear walls Add new stair case

Effects of Drift  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 According to IBC, Δ WIND = H/400

Concrete Shear Walls  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 Only Continuous Walls Used

Shear Wall Boundary Element  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 #5 Vertical 15” o.c. #5 Horizontal 15” o.c. (8)#9 #3 Ties 20” 10”

Laboratory Facilities  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 Equipment Used For: DNA sequencing Gene cloning Microarray Mice Testing Mass Spectrometry

Laboratory Facilities  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 Microscopes up to 100x Microscopes up to 400x Microscopes over 400x Microscopes up to 30,000x

Green Roof  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 “Meadow” Roof Garden Examples set up by RoofScapes inc. Provide: Wind Erosion Stabilization Passive irrigation Habitat creation Moderate maintenance Provide: Wind Erosion Stabilization Passive irrigation Habitat creation Moderate maintenance

Metal Mesh Shading  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 Metal Screen from Cambridge Architectural Provide: Shade from harsh summer day Gain heat to save energy costs Still utilize curtain wall view Provide: Shade from harsh summer day Gain heat to save energy costs Still utilize curtain wall view

New Green Look  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008

Local Materials  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 Cambridge Architectural Nitterhouse RoofScapes, inc. Hershey Medical Center

Structural System Costs  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 Low $$ Lateral System Low $$ Gravity System OR

Structural System Schedule  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 Phases of Construction

In Retrospect…  Introduction  Building Statistics  Existing Structure  Proposal  Structural Redesign  Lateral Redesign  Vibration Analysis  Sustainability Concerns  Cost Analysis  Schedule Change  Conclusions Meral Kanik Structural Option April 14, 2008 Structural Precast Planks Drift Shear Walls Vibration Sustainability Green Roof PSU LEED Construction Erection Time Cost

Special Thanks To… E.Y.P.A.E. Franklin Lancaster David Clemenzi PSU AE Faculty and Staff Dr. Ali Memari Professor Kevin Parfitt Professor Bob Holland Fellow AE students All of my family (Ben Sizin Seviyorum) Penn State Rugby (Lessss GO State!) Meral Kanik Structural Option April 14, 2008

Questions? Meral Kanik Structural Option April 14, 2008