Trade of Plumbing – Phase 2 Module 2 – Unit 3 Module 2: Domestic Hot and Cold Water Service Unit 3 – Machine Bending Copper Pipe Duration – 22 Hours.

Slides:



Advertisements
Similar presentations
Trade of Plumbing – Phase 2 Module 1 – Unit 4 Module 1: Thermal Process and Mild Steel Pipework Unit 4: Basic Engineering Duration – 13 Hours.
Advertisements

File Parts.
Shawlands Academy Department Of Technical Education
Study Lesson 2 Using drawing tools & applied geometry.
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
 When using the rotary cutter always walk with the blade closed. To open the blade place four fingers around the handle and slide the blade guard button.
1 HVACR316 – Piping Tubing and Piping. 2 Purposes of Tubing and Piping Provides a path for refrigerant to take Provides a means to return oil to the compressor.
Basic Refrigeration Cycle
Trade of Plumbing – Phase 2 Module 2 – Unit 6 Module 2: Domestic Hot and Cold Water Service Unit 6 – Soldering Duration – 32 Hours.
Glencoe Visual Showcase Culinary Essentials. Using four fingers to guide the knife, hold the knife at a 20° angle against the whetstone. 1 Sharpen and.
TUBING AND PIPING.
Unit 204: Common Plumbing Processes
Trade of Plumbing – Phase 2 Module 2 – Unit 5 Module 2: Domestic Hot and Cold Water Service Unit 5 – Bronze Welding Duration – 30 Hours.
Forging new generations of engineers. Fluid Power.
Trade of Plumbing – Phase 2 Module 1 – Unit 11 Module 1: Thermal Process and Mild Steel Pipework Unit 11 – Heat Bending Mild Steel Pipe Duration – 30 Hours.
Name that tool Try Square
Trade of Plumbing – Phase 2 Module 2 – Unit 12 Module 2: Domestic Hot and Cold Water Services Unit 12 – Above Ground Sanitation Pipework Duration – 18.
Domestic Hot and Cold Water Service
Perpendicular lines By Alma Villarreal. What are perpendicular lines? Perpendicular lines are lines, segments, or rays that intersect toform right angles.
Unit 205: Cold water systems
CHAPTER 24 PIPING DRAWING Instructor: M.Yaqub. Chapter 24 piping week# Steel and Wrought Iron Pipe Common use for water, steam, gas and oil. Up.
GCSE Graphic Products Shaping and Forming Plastics
How to Make a Simple DC Motor
DIFFERENTIAL MANOMETER
Hexagonal Pyramid cut at an angle #1
Trade of Plumbing – Phase 2 Module 2 – Unit 7 Module 2: Domestic Hot and Cold Water Services Unit 7 – Sources and Classification of Water Supply Duration.
Openergo A self-build rowing machine
Trade of Plumbing – Phase 2 Module 3 – Unit 3 Module 3 Domestic Heating/MMA Welding Unit 3 – Domestic Heating System Installation Duration – 35 Hours.
Problem-1 A section of commercial steel shafting 2.0 m long between bearings carries a 1000 N pulley at its midpoint, as shown in Figure. The pulley is.
Materials used for Plumbing. Copper Copper pipe is the most popular type of piping used in domestic hot and cold water systems. It is also used in domestic.
Domestic Hot and Cold Water Service
‘The MUSU’. The MUSU was designed from basic concepts to a final design starting with simple sketches.
Graphic Communication
Trade of Plumbing – Phase 2 Module 2 – Unit 9 Module 2: Domestic Hot and Cold Water Services Unit 9 – Valves and Taps Duration – 11 Hours.
Presentation on Feed and Expansion Cistern. Central Heating At the end of this part you should be able to: Identify general system methods of feed and.
Check it out! : Solving Radical Equations.
Model Agricultural Core Curriculum: Supplement University of California, Davis 911.T 1 Basic Hand and Power Tools Hand Tool Safety Carry with sharp point.
Homework: Use the information that you gathered this week to draw out your plan view working drawing, 1:1 scale. Use sheet 6. Hand in next week. Start.
Chapter 15 Extrusion and Drawing of Metals. Topics Introduction The Extrusion Process Extrusion Practice Hot Extrusion Cold Extrusion Impact Extrusion.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Setting up correctly Different types and their use
Measuring Instruments
Installing Guttering and Rainwater Systems
Main Parts of a Drilling Machine
Hot Metal. Forging Forging- is the process of using pressure to shape metal. Forging- is the process of using pressure to shape metal.
Erick Angeles, Becky Lu, Molly Mettler, Kenny Tran Period 6 Physics, Mr. Josh Jackson.
Chapter 13 Exercise and Lifelong Fitness Practicing Healthful Behaviors Slide 1 of 8 It is important to know your current level of fitness before planning.
ANGLES complete MJ p. 68 Number 1 and 2. Share your thoughts.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
EXTRUSION BASIC CONCEPTS
Dynamic Presentation of Key Concepts Module 2 – Part 1 Series, Parallel, and other Resistance Equivalent Circuits Filename: DPKC_Mod02_Part01.ppt.
Bulk deformation Processes II
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Forming techniques – blow moulding The process is similar to injection moulding and extrusion. 1. The plastic is fed in granular form into a 'hopper' that.
Hexagonal Pyramid cut at an angle #1
Understanding Architectural Blueprints
Angles and Protractors
Chapter 5: Locating and setting out
Teknologi Dan Rekayasa
What are Dimensions? Dimensions are the text that is provided with a drawing that describe the exact size and location for the features shown. Also known.
Chapter 15 Metal Extrusion and Drawing Processes and Equipment
5 Construction 4 Line Perpendicular to a Given Line l, Passing Through a Given Point on l Method 1: solution Using a Set Square Line up one side of er.
5 Construction 6 Division of a Line Segment into Three Equal Segments, Without Measuring From point A (or B), draw a ray at an acute angle to the given.
Domestic Hot and Cold Water Service
PLUMBING MATERIALS, PIPE BENDING AND PRESSURE TESTING
Module 1: Thermal Process and Mild Steel Pipework
METHOD OF SECTIONS & INTRODUCTION TO MACHINE DRAWING
Step-by-step assembly instructions
Presentation transcript:

Trade of Plumbing – Phase 2 Module 2 – Unit 3 Module 2: Domestic Hot and Cold Water Service Unit 3 – Machine Bending Copper Pipe Duration – 22 Hours

Trade of Plumbing – Phase 2 Module 2 – Unit 3 In unit 3 we learn how to:  Set up floor mounted copper pipe bending machine.  Form 900 and offset bends on copper pipe using floor mounted and hand-held bending machines.  Assemble copper pipe machine bending projects.

Trade of Plumbing – Phase 2 Module 2 – Unit 3 Key Learning Points  SkSetting up floor mounted bending machine, identification of formers and guides.  SkUse of floor mounted and hand-held bending machines.  SkMachines bending 900 bends and double bends.  Sk Machine bending offset bends.  PTeamwork and working independently.  MAngles and use of set squares.  Sk M Measurements, tolerances.  SkAlignment of bends.  SkInterpretation of drawings.  SkPreparation of materials list.  PPlanning, communication.  SkAssembly of copper pipe bending projects.  SkBracketing and levelling pipework  PGood working practice.

Trade of Plumbing – Phase 2 Module 2 – Unit 3 Bending Machine The bending machine used for copper tubes differs greatly from the hydraulic machine used for mild steel pipe in that hand pressure only forms the bend on copper tube. The main components of the copper tube bending machine are illustrated below:

Trade of Plumbing – Phase 2 Module 2 – Unit 3 To form a square bend with a copper bending machine, mark the bending line on the tube and place the tube into the machine. Place a square against the bending mark on the tube and slide the tube along until the square touches the outside edge of the former at X. The tube is now in the correct position for bending.

Trade of Plumbing – Phase 2 Module 2 – Unit 3 To form an offset with the machine pull the first bend to the required angle (usually 45º). Now place the tube in the machine as shown opposite sliding it back or forward until the required amount if offset is obtained between the pipe and the straight edge resting on the outside edge of the former. When the correct measurement is obtained pull the second bend until the pipes are parallel.