Single Meter Supply Points Discussion Points for Workstream 0428 27 September 2012.

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Industry Shipperless & Unregistered Working Group Wednesday 18 th April 2012.
Energy Networks Association Root cause solution for unregistered sites / MPRN creation David Mitchell 1 st November 2013.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
© British Gas Further Analysis on Meter Reading Validation Tolerances proposed by Project Nexus March 2014.
UNC Review Group 0178 National Grid Distribution “Reclassification of SSP to Domestic only” Review Group Meeting – 22 February 2008 Chris Warner.
6.8Compare Statistics from Samples Example 1 Compare statistics from different samples Production The data set below give the number of computers assembled.
Section 6.8 Compare Statistics from Samples. Vocabulary Quartile: The median of an ordered data set Upper Quartile: The median of the upper half of an.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
AQ Tolerance Proposal Mod 209 – August Page 2Theme Date Department AQ Tolerances  Provide a view of appropriate tolerances for AQ validation 
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PN UNC Workgroup Read Validation 4 th October 2011.
1 Bakersfield City School District Average Daily Attendance Information.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Mod 0428 Charge Impact October Affected Supply Point Population.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
1 Modification 0152V Implementation Matters 25 October 2007.
DESC Technical Workgroup Review of draft 2017/18 NDM Algorithms
Rolling AQ – Initial Calculation
UNC Modification Proposal 0202 National Grid Distribution
Modification 0282 Action 002 Update
Capacity/Commodity Split Impact on Suppressed reconciliations
Sample vs Population comparing mean and standard deviations
LDZ System Charges – Structure Methodology 26 July 2010
Review Group 178 SSP as Domestic only.
Overall Project RAG Status:
Simon Trivella – 22nd May 2008 Distribution Workstream
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Potential Nexus Topic: Universal Single Meter Point Supply Points
Action: DX0602 Xoserve; to look to provide performance related data appertaining to the confirmations / reconfirmations process. The following values are.
Modification Proposal 0283
Questions for Consultation
DSC Change Committee Summary – 9th May
XRN4790 – Introduction of winter read/consumption reports
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
DN Interruption & Charging
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Mod Proposal 0268 : AQ Backstop Date
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Market Differentiation Workgroup Market Sector Flag Analysis
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Project Nexus Market Differentiation Formal Market Separation
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Impact of SOQ Reduction
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Unregistered Sites Reports
Modification 421 – Updates and Benefits Case
Overview of RbD Risk Modelling 31 March 2008
Development Work Group 0209 Straw Man Update
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Reads.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Customer Issue Management CoMC Update for April & May 2019
Further Considerations
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

Single Meter Supply Points Discussion Points for Workstream September 2012

2 Population of meter points by SPAQ band National SPAQ (kWh)MP Count 0-73,20011, % 73, ,00028, , ,00018,23746, %66.31% 732, ,196,00017,661 2,196, ,860,0007,447 5,860, ,650,0002,649 14,650, ,300, ,300, ,600, >58,600, , %100.00% Total87,232

3 Population of meter points by SPAQ band and grouping size National 2 1)Multi meter sites with 'x' meter point reference numbers SPAQ (kWh) 2 MPRN 3 MPRN 4 MPRN 5 MPRN 6 MPRN 7 MPRN 8 MPRN 9 MPRN 10 MPRN >10 MPRNTotal 0-73,2009,5101, ,455 73, ,00019,8205,0221, , , ,0008,9964,0832, , , ,196,0005,1683,2282,3001,4851, ,29217,661 2,196, ,860,0001, ,3097,447 5,860, ,650, ,0762,649 14,650, ,300, ,300, ,600, >58,600, Total45,86614,9827,0443,8952,6641,6591,5041, ,71387,232

4 Form of System Capacity Charge

5 Interesting points to note  SP < 73,200kWh  No interesting points of note!!  All MPRNs keep the same capacity rate aggregated or disaggregated  SP > 73,200kWh and < 293,000kWh  Average increase 18%  Largely due to capacity rate moving “up the step”  Where Supply Points are EUC WAR banded – Meter Point SOQ has been calculated using the same EUC WAR but corresponding with the lower AQ  SP > 293,000kWh and <732,000kWh  Average low (1%) but wide range between -24% and +34%  Largely due to move from a “WAR band” SOQ to EUC bands 1 & 2  Positives result from moving from High LF EUC bands to lower, default EUC bands - e.g. 42.0% to 31.3%  Negatives result from a counter-positional move  SP > 732,000kWh  Average, across the entire bands – 25% increase  All percentages based on a random sample

6 Bishop Stortford SPAQ 1,655,014 Mprn MPAQ Meter xx 195,998 MDA16 – xx 252,930 MDA16 – xx 111 G4 – xx 252,930 MDA16 – xx 77,348 U6R5 – xx 76,021 U6 – xx 77,348 U6R5 – xx 269 8C125 – xx 121 G4 – xx 87,177 MDA16 – xx 7,653 G4 – xx 434,571 U40 – xx 311,501 U65 – xx 1 U6R5 – xx 21,218 U6R5 – xx 1 U6R5 – xx 189,651 MDA25 – 25

7 Canada Life House SPAQ 1,396,057 Mprn MPAQ Meter 10279xx 18,042 U xx 15,575 U xx 22,138 U16 – xx 16,447 U6 – xx 58,430 U40 – xx 16,063 U6 – xx 18,372 U6 – xx 762,990 7M125 – xx 468,000 11M

8 Proposed Phased Approach  Immediately – no new configurations  Phase 1: Within 3 months of implementation  All aggregations with AQs up to 73,200kWh to be disaggregated  Accounts for 11.5k supply points or 13%  Phase 2: From 1st April 2014 to 1st July 2014  All aggregations with AQs above 73,200kWh & up to 732,000kWh to be disaggregated  Accounts for 46k supply points or 53%  Phase 3: From 1st April 2015 to 1st July 2015  All aggregations with AQs above 732,000kWh to be disaggregated  Accounts for remaining 29k supply points or 36%