S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID

Slides:



Advertisements
Similar presentations
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
Advertisements

Overview of ER & Availability Based Tariff P.Mukhopadhyay.
Generation Peak Demand : 132 GW Growth Rate: 9 – 10 % (per annum) India - Present Power Scenario Total Installed Capacity – GW (As on )
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
POWER GRID CORPORATION OF INDIA LTD
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
Sanjay Garg General Manager PGCIL/ Ministry of Power
WELCOME TO K. SWAMINATHAN, CHAIRMAN K. SREERAMA MURTHY, MEMBER
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
1 POWER GRID CORPORATION OF INDIA LIMITED BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC, BANGALORE PRESENTATION By L.K.Kanungo SOUTHERN REGIONAL GRID ON U.K.Verma &
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 139 TH SREB MEETING 19 TH DECEMBER 2005 HYDERABAD GRID EVENTS AND ISSUES.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 34,207.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Discussion on Draft Restoration (Black Start)procedures.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
POWER GRID CORPORATION OF INDIA LTD.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
POWER GRID CORPORATION OF INDIA LTD.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
Overall National Grid Development: Constraints & Options
SOUTHERN REGION EXPERIENCE
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
1 PRESENTATION ON FREQUENCY CONTROL AND FREE GOVERNOR OPERATION TO THE OFFICERS OF CENTRAL ELECTRICITY AUTHORITY On 4 th April, 2005 by V.K. Agrawal SRLDC,
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
BANGALORE TRANSMISSION PLANNING
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
ENERGY CONSERVATION IN SR - A CASE STUDY
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
REGIONAL GRIDS IN INDIA – QUICK FACTS
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
SPECIAL PROTECTION SCHEME FOR KOODANKULAM
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT
PRESENTATION COVERS Past/Present Power Scenario Issues involved
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR
Presentation transcript:

S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID LOAD ANGLE MEASUREMENT USING SCADA A UNIQUE VISUALISATION TOOL FOR GRID OPERATION S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID

NATIONAL GRID QUICK FACTS 400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES

REGIONAL GRIDS INSTALLED CAPACITY TOTAL(APPROX) 125,000 MW NORTHERN :- 33,782 MW EASTERN :- 16,680 MW SOUTHERN :- 37,054 MW WESTERN :- 34,867 MW NORTH-EASTERN :- 2,443 MW TOTAL(APPROX) 125,000 MW NORTHERN REGION NORTH-EASTERN REGION EASTERN REGION WESTERNREGION SOUTHERN REGION

‘ELECTRICAL’ REGIONS NORTHERN REGION 1 NORTH-EASTERN REGION EASTERN REGION WESTERNREGION TALA PROJECT-LARGE CENTRAL GRID ARUNACHAL TO GUJARAT ON SAME FREQ 2 SOUTHERN REGION WITH THE COMMISSIONING OF THE TALA PROJECT CONNECTING THE EASTERN AND NORTHERN GRIDS, INDIA WILL HAVE ONLY TWO GRIDS

Installed capacity & Inter regional links MW capacity NER-ER 1,850 ER-NR 2,700 ER-SR 1,200 ER-WR 1,650 SR-WR WR-NR 900 Talcher Kolar HVDC Bipole 2,000 Total as on 31.08.06 11,500 Target for 2012 37,500 Two synchronous systems -North-Central & South 34,307 MW 30,500 MW 2,404 MW 16,478 MW 16,000 37,140 MW 36,584 MW Installed Generation Capacity Current : 126,994 MW Target for Year 2012 : 200,000 MW Figures as on 31-Aug-2006

Energy Resource Map Coal Hydro

OVERVIEW OF SOUTHERN REGIONAL GRID

SOUTHERN REGION – GEOGRAPHY ANDHRA PRADESH TAMIL NADU KARNATAKA KERALA POPULATION :- 22.5 CRORES ( 22% OF INDIA) AREA :- 651 (‘000 SQ KM)(19% OF INDIA) INSTALLED CAPACITY:- 36,784 MW(29.5%) WEATHER :- South-west monsoon North-east monsoon SEA COAST :- AROUND 4000 KM TALA PROJECT-LARGE CENTRAL GRID ARUNACHAL TO GUJARAT ON SAME FREQ

GENERATING UNITS IN SOUTHERN REGION UNIT CAPACITY AP KAR KER TN CGS TOTAL THERMAL (500 MW) 2 8 10 THERMAL (200-250 MW) 7 13 15 45 GAS/THERMAL (100-150 MW) 9 3 24 HYDRO (>50 MW) 27 29 16 87 48 38 19 165 A.P TYPICAL GENERATOR SPREAD IN SR KAR - HYDRO - THERMAL KER TN GENERATORS ABOVE 1000 MW - GAS / NAPTHA GENERATORS 500 – 1000 MW - NUCLEAR GENERATORS BELOW 500 MW

TYPICAL LOAD SPREAD IN SR LOAD 500-1500 MW LOAD 200-500 MW

400KV SUB-STATIONS IN SR 8 9 2 19 6 5 1 12 1 22 15 42 AP KAR KER TN   POWERGRID STATE OTHERS TOTAL AP 8 9 2 19 KAR 6 5 1 12 KER TN  1 22 15 42 KALPAKKA RAMAGUNDAM 1 SIMHADRI GAZUWAKA KHAMMAM GMR VEMAGIRI HYDERABAD P P P JEGRUPADU EXTN MAMIDIPALLY MEHA BOOB NAGAR P VIJAYAWADA RAICHUR P NAGARJUNASAGAR MUNIRABAD SRI SAILAM P KURNOOL P GOOTY NARENDRA CUDDAPAH 60 DAVANAGERE P NELLORE KAIGA HIRIYUR CHITTOOR NELAMANGALA ALMATHI TALAGUPPA BANGALORE P KOLAR P MADRAS -- OF POWERGRID MYSORE HOODY HOSUR -- OF NTPC NEYVELI TPS I (EXP) 63 SALEM -- OF ANDHRA PRADESH P NEYVELI -- OF TAMIL NADU UDUMALPET P TRICHY TRICHUR -- OF KARNATAKA P P -- OF NLC P MADURAI -- OF NPC TRIVENDRUM

MONSOONS SOUTH WEST MONSOON NORTH EAST MONSOON BACK

SR QUICK FACTS INSTALLED CAPACITY 37054 MW PEAK DEMAND MET ≈ 23,000 MW THERMAL: HYDRO 67:33 PEAK DEMAND MET ≈ 23,000 MW MAX DAILY CONSUMPTION 525 MU

400KV GRID MAP OF SOUTHERN REGION ORISSA TALCHER BHADRAVATI JEYPORE MAHARASHTRA AP SIMHADRI RSTPP KALPAKKA KHAMMAM P MMDP GAZUWAKA HYDERABAD P P VEMAGIRI MAHABOOB NAGAR GMR GVK P N’SAGAR VIJAYAWADA NARENDRA KAR RAICHUR KURNOOL P MUNIRABAD SSLMM P KAIGA N P GOOTY 1000 MW HVDC BACK TO BACK LINK GUTTUR P KADAPA NELLORE 2000 MW HVDC BIPOLE HIRIYUR TALGUPPA NELAMANGALA `HOODY CHITTOOR MADRAS 500 KV HVDC LINE BANGALORE KOLAR P MAPS HOSUR 400 KV LINE POWERGRID 400 KV LINE APTRANSCO SALEM NEYVELI 400 KV LINE KPTCL NEYVELI TPS – 1 (EXP) TN UDUMALPET P TRICHY 400 KV LINE OPERATED AT 220 KV TRICHUR P THERMAL GENERATING STATION MADURAI 400KV SUB-STATION KER NUCLEAR STATION SRLDC, BANGALORE MARCH 2006 THIRUVANANTHAPURAM

Grid Performance Number of Grid Disturbances have come down High Transmission System Availability

LOAD ANGLE AN EMPIRICAL TOOL

POWER SYSTEM STABILITY ‘Power system stability is the ability of an electric power system, for a given initial operating condition, to regain a state of operating equilibrium after being subjected to a physical disturbance, with most system variables bounded so that practically the entire system remains intact.’ ---------------------------------------VLPGO ’05, WG1

STABILITY CLASSIFICATION VLPGO 2005 WG1

WHY DO WE NEED A LOAD ANGLE DISPLAY ? SOUTHERN REGION WAS PLAGUED BY LOW VOLTAGES, HEAVILY LOADED LINES, LOW FREQUENCY PROBLEMS SKEWED LOADING ON LINES DUE TO LARGE DISTANCES BETWEEN LOAD AND GENERATION OPERATOR COULD NOT PERCIEVE HOW NEAR TO THE PRECIPE HE WAS SEPARATIONS/ GRID DISTURBANCES WAS THE ORDER OF THE DAY INTER AREA OSCILLATIONS WERE NOTICED FREQUENTLY DECREASING GENERATION/LOAD SHEDDING IN SELECTED PLACES HELPED ALLEVIATE THESE SYMPTOMS LOAD ANGLE WAS CALCULATED AND STORED MANY DISTURBANCES WERE ANALYSED AND AN EMPIRICAL LIMIT WAS CONCIEVED LOAD ANGLE FOR EACH CRITICAL LINE AND CORRIDOR IS DISPLAYED

LOAD ANGLE- VISUAL DISPLAY DATA FROM ALL STATIONS ARE AVAILABLE AT 10 SEC REFRESH RATE COMPUTATION OF ANGLE IS DONE AT RSCC SERVER LINE WISE AND CORRIDOR WISE LOAD ANGLE DISPLAY IS GIVEN TO OPERATOR GENERALLY LIMITED TO 50O FOR CORRIDOR AND 20O FOR SINGLE HOP FOR CRITICAL LINKS

LOADANGLE AND POWERLEVEL RELATION FOR DIFFERENT LINE LENGTHS 5 10 15 20 25 100 200 300 400 500 600 350KM line 200KM line 100KM line Load Angle in degrees Power Level in MW

LOAD CHANGE OVER BY AP SKEWS LOADING PATTERN

LOAD ANGLE OF RGM-NLY DURING A SYSTEM SEPARATION 80.0 SYSTEM SEPARATION POINT 70.0 60.0 50.0 LOAD ANGLE IN DEGREE 40.0 30.0 20.0 10.0 0.0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 HOURS------------>

Visualization Techniques

Inputs used Vindhyachal North Bus L-L Voltage. Angular Separation between Vindhyachal North Bus and West Bus. ( Available through Phase angle transducer having one input through R-Phase North Bus and another through R-Phase West Bus having range only up to 60 degree) Phasor Voltage difference between Vindhyachal North Bus and West Bus ( Available through voltage transducer having one input through R-Phase North Bus and another through R-Phase West Bus)