CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,

Slides:



Advertisements
Similar presentations
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Beam Physics Work D.S List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Workshop Goals Marc Ross LC May, 2013 Accelerator Plenary.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Simulations Group Summary K. Kubo, D. Schulte, N. Solyak for the beam dynamics working group.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
1 Tunnel implementations (laser straight) Central Injector complex.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Luminosity expectations for the first years of CLIC operation CTC MJ.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Considerations for the CDR and Strategy Update The current CDR planning focuses on 3 TeV and a downscaled not optimised 500 GeV machine, aiming for completion.
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Introdcution to Workpackage/Activity Reflection D. Schulte.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
X-Band Technology, requirement for structure tests and its application for SASE FEL D. Schulte for the CLIC collaboration Special thanks to A. Grudiev,
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CLIC 2014 goals Complete re-baselining of a staged implementation taking into account the Higgs energy scale and improved power/cost models OK … work being.
CLIC Organogram CLIC Collab. Board L.Rivkin MoU with annexes describing coll. efforts (note: in reality more complicated) CLIC SC (Stapnes) Repr. from.
CLIC Re-baselining CSC, October Possible CLIC stages studied 2.
1 R&D Plans for Impedance Driven Single-Bunch Instabilities (WBS 2.2.1) M. Venturini ( presented by M. Zisman) LBNL LCWS07 DESY, Hamburg May 30 - June.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
News and updates CLIC review and follow up: view?fr=no&detailLevel=contribution&view=standard&showS ession=all&showDate=all.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
LCC L. Evans, Santander, 2nd June 2016
ILC - Upgrades Nick Walker – 100th meeting
Input to Strategy currently planned
CLIC Rebaselining at 380 GeV and Staging Considerations
CLIC Klystron-based Design
M.Jonker CTC MPO-WG status
Collaboration New collaborators in 2016:
CLIC Study Aim Conceptual design report in 2010
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
CLIC-ILC BDS & MDI work.
Future Collider Projects at CERN
W. T. Weng Brookhaven National Laboratory
Requests of Future HEP e+/e-Facilities
Andrei Seryi Materials for discussion TILC-08
CLIC damping rings working plan towards the CDR
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery, not optimized cost, first power/energy estimates without time for reductions, limited industrial costing, very limited reliability studies Baseline design and staging strategy Solid cost basis and more optimized power/energy (aim for 20% energy reduction) Proof of industry basis for key components/units, in particular those specific for CLIC Comprehensive reliability/robustness/uptime analysis Pursue increased use of X-band for other machines/applications Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery, not optimized cost, first power/energy estimates without time for reductions, limited industrial costing, very limited reliability studies Baseline design and staging strategy Solid cost basis and more optimized power/energy (aim for 20% energy reduction) Proof of industry basis for key components/units, in particular those specific for CLIC Comprehensive reliability/robustness/uptime analysis Pursue increased use of X-band for other machines/applications System-tests: CDR status: CTF3 results initial phase (as of early 2012), ATF and FACET very little, no convincing strategy for further system verification Complete system-tests foreseen for next phase, and comprehensive documentation of the results at CERN (CTF3) and elsewhere Strategy for further system verification before construction (XFEL, connected to light-sources, further drive-beam verifications) or as part of initial machine strategy. CDR status concerning drive-beam FE: Nothing done beyond CTF3 Demonstrator of drive beam FE and RF power unit based on industrial capacity – will open for larger facilities beyond 2018 if necessary System-tests: CDR status: CTF3 results initial phase (as of early 2012), ATF and FACET very little, no convincing strategy for further system verification Complete system-tests foreseen for next phase, and comprehensive documentation of the results at CERN (CTF3) and elsewhere Strategy for further system verification before construction (XFEL, connected to light-sources, further drive-beam verifications) or as part of initial machine strategy. CDR status concerning drive-beam FE: Nothing done beyond CTF3 Demonstrator of drive beam FE and RF power unit based on industrial capacity – will open for larger facilities beyond 2018 if necessary X-band developments: CDR status: Single elements demonstrated – limited by test- capacity Statistics for gradient and structure choice (energy reach) and other X-band elements X-band developments: CDR status: Single elements demonstrated – limited by test- capacity Statistics for gradient and structure choice (energy reach) and other X-band elements Technology developments: CDR status: alignment/stability partly covered, BBA assumed, wakefield mon. perf. assumed, no complete module Demonstration of critical elements and methods for the machine performance: DR, main linac, BDS with associated instrumentation and correction methods (combination of design, simulation, system-tests and technologies) Stability/alignment (locally and over distances) Module including all parts Technology developments: CDR status: alignment/stability partly covered, BBA assumed, wakefield mon. perf. assumed, no complete module Demonstration of critical elements and methods for the machine performance: DR, main linac, BDS with associated instrumentation and correction methods (combination of design, simulation, system-tests and technologies) Stability/alignment (locally and over distances) Module including all parts For CLIC four main priorities have been identified for 2018: A re-baselined project implementation with new parameters sets for a staged implementation, cost and power optimised also for the initial stages The systemtest programmes in CTF3, related to the drivebeam FE, at ATF and in FACET, as well as exploring systemtests beyond these facilities for example in collaborative programmes with light-source laboratories Xband development and significantly increased test-capacity for structures Technical systems developments, related among others to modules, alignment/stability, instrumentation and power sources.

2 LCWS 2013 Sources (common working group on positron generation) Damping rings Beam dynamics (covers along entire machine) Beam delivery systems Machine Detector Interfaces Physics and detectors Even though the basic acceleration technologies are different for CLIC and ILC, many areas have common challenges and potentially common solutions whenever the requirements are similar. Among the most pronounced common activities: For CLIC the on-going and planned activities related to sources should be reviewed with a five year perspective, in particular identifying parameters and issues particular to the CLIC design that are already or need to be addressed by the collaboration. In general common development work for ILC and CLIC should be encouraged and arranged wherever possible. For CLIC DR activities, also in this case in addition to reviewing the status, the work to establish new baseline parameters – and consequently performance, costs and power consumptions - and experimental programme, including collaborative projects with light- sources, in the forthcoming five year period should be reviewed, linking to the ILC programme wherever possible.

BDI and MDI There are many communalities between the ILC and CLIC BDS systems, and on-going efforts to identify and pursue common paths. The primary R&D programme for the BDS is the ATF2 programme and it is expected this programme (and possible extensions of it) to be a focus of R&D discussions in this working group – partly also in WG6. Furthermore, in conjunction with the detector MDI sessions, it is expected that plans for a re- evaluation of the experimental hall and support infrastructure in light of the recent ILC site decision in Japan to begin. These three important aspects should be addressed in the workshop. However, there are several key aspects of the overall BDS designs which need to be considered, and the WG should make an initial assessment and produce plans to address them: The status the current BDS lattices (including the extraction lines) should be reviewed, with a view to producing configurations for all centre-of-mass energies under consideration. As part of the above, the collimation system requirements should be reviewed and updated as necessary. Furthermore, a complete review of the extraction line to main dump should be made, again with a view to bringing the existing lattice designs up-to-date with the operation modes under discussion. Beyond the ILC TDR, possible scenarios for a first-stage construction for the BDS at a beam energy of 125 GeV should be considered. The goal, for both ILC and CLIC, is to develop lattices that could be implemented for the lower-energy operation and later upgrade for higher energy. Current R&D status for final doublet solutions, including consideration of low energy operation should be reviewed and reported on. Recommendations for next phase R&D programmes should be made. Impedance issues for the BDS should be carefully reviewed, and tolerances on vacuum system components updated. Develop further the definition of the interfaces between BDS and MDI. 3 LCWS 2013 Sources (common working group on positron generation) Damping rings Beam dynamics (covers along entire machine) Beam delivery systems Machine Detector Interfaces Physics and detectors

Beam Dynamics In addition to reviewing the status of the lattice design, beam dynamics and luminosity performance studies for ILC and CLIC RTML and Main Linac, the WG should consider operation beyond the TDR baseline (for ILC: 10 Hz operation with the high current operation bunches for high luminosity upgrade). Special attention to the feed-back system performance including analysis of results from beam-based alignment studies experiment at FACET. Working group should participate in discussion of ATF-II results and lessons-learned and studies focus on comparison of performances ILC and CLIC beam delivery systems. WG should consider options for experiments at other facility and discuss plans for the future work. 4 LCWS 2013 Sources (common working group on positron generation) Damping ringsMain linac Beam delivery systems Machine Detector Interfaces Physics and detectors

5 LCWS 2013 Sources (common working group on positron generation) Damping ringsMain linac Beam delivery systems Machine Detector Interfaces Physics and detectors System Tests and Performance studies Luminosity performance of LCs is often raised as a concern, in part due to very limited experience with such machines. The concerns range from the ability to produce and handle beams with the necessary emittances, size and general quality, alignment and stability, complexity of correction methods and feedbacks, understanding and benchmarking of simulation and modelling, instrumentation specifications and performances, reliability and robustness of hardware and corrective methods. This WG is expected to address these issues in view of the ILC and CLIC on-going, planned or desired simulation, modelling and in particular either on-going or possible experiments at existing test facilities (examples of relevant test facilities are ATF, CTF3, CESR, Facet, light sources (including XFELs)). The goal is to address the most critical performance issues for future LCs by a combination studies and experimental measurements, providing guidance and priorities to experimental programmes in the coming years, and identifying new possibilities for addressing such questions in existing or foreseen accelerator facilities in the coming decade.

6 Link: