ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
High Level RF Technical System Review GDE Cost Review July Vancouver Canada Shigeki Fukuda & Ray Larsen For the HLRF Cost Team C. Adolphsen,
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Highlights from LINAC 12 in Tel Aviv, Israel Jürgen Pfingstner Alexander Gerbershagen.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
AAP Review 横谷 LC 定例 Preparation of AAP Review General charge sets the frame Version of early November Rough structure of the meeting has been.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Plan for SCRF BTR January , 2012 Akira Yamamoto, Marc Ross, and Nick Walker (PMs) Jim Kerby, and Tetsuo Shidara (SCRF-APMs) Presented and discussed.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
BCD input from WG2 WG2 12/08/2005 H. Hayano Chris Adolphsen Terry Garvey Hitoshi Hayano.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
WG3 : Superconducting Linac Session H. Hayano, C. Pagani Geneva,Oct.2010 summary.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-19 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
SCRF: Monthly WebEx Meeting Oct., 19, 2011
SCRF WebEx Monthly Meeting Agenda and Reports from PM
S1G Experiment Schedule Plan
Status and plans for the 3.9 GHz section of XFEL
Meeting for S1-Global module design Cryomodule and Cryogenics
SCRF Monthly WebEx Meeting Sept. 22, 2010
SCRF Monthly WebEx Meeting May, 6, 2011
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
Technical Design Report preparation
WG3: Main Linac SCRF(cavity,cryomodule)
Presentation transcript:

ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano

WG Charge – In 21 hours, Review current status of global ILC R&D and future plans, for both the baseline configuration as well as the supported alternative designs; Review and plan activities in and around Test Facilities (both existing and proposed); Identify and prioritize critical R&D milestones for TDP-1 and beyond. Promote and improve collaboration between groups working on ILC related R&D:

TD Milestones April 2009 (KEK): Critical in-depth technical review by the Accelerator Advisory Panel (AAP) January 2010: Re-baseline of the ILC design, in preparation for TD Phase 2 July 2010 (Paris): Publication of the TD Phase 1 interim report at ICHEP

ML Topics – 9 hrs Progress on achieving gradient (S0) –Reports from three regions –TTC summary on topics on covered at ILC08 –Status of alternatives (60 mm designs, large grain) Status of Facilities and Horz/CM testing (S1/S2) –Reports from three regions –S1 Global progress Toward Plug Compatibility –He vessel (material, pressure vessel constraints,..) –Tuners –Couplers (OD, location, Q control, cryo losses) Cryomodule Design –Refinement of design in the three regions –Cryogenics optimization (heat shield, pipe sizes)

ML Topics – 6 hrs HLRF/LLRF –XFEL HLRF test results –Status of alternatives (Marx, SBK, PDS at SLAC/FNAL and KEK, ATCA) –Klystron Cluster Concept –LLRF measurements at FLASH (9 mA progress and measurements of overhead contributions)

ML Topics – 4 hrs Quad Package –Magnet measurements at SLAC and FNAL –Magnets for XFEL –BPM progress Beam Dynamics and Wakefields –Summary of on-axis coupler and rf kicks –Linac alignment specifications –Dipole Mode Properties –HOM heating RTML –To be planned by Nikolay

ML Topics – 2 hrs Preparation for AAP –Guidance from PM on scope –Tentative assignments of who will cover what Preparation for ILC08 closeout / overflow –Prepare summary reports

ML Session Overview Primary Session Secondary Session Other Groups Monday Cavities and Cryomodule HLRF meet with CFS TuesdayHLRF/LLRF Cryomodule Design Details Wednesday MLI, Beam Dynamics and RTML LLRF Studies at Flash

ML Topics – SCRF Monday(Nov.17) morning Progress on achieving gradient (S0) –TTC summary on High gradient R&D (……..) –New Reports from three regions (not presented at TTC) (……..) –New topics (not presented at TTC) (……..) –Status of alternatives (60 mm designs, large grain) (……..) –Plans for TDP1 period (…….) Monday(Nov.17) afternoon Status of Facilities and Horz/CM testing (S1/S2) –TTC summary on module test and plan (…….) –New Reports or topics (not presented at TTC) (……) –S1-Global status report ( Norihito Ohuchi) –S1-Global detail plan discussion for in-kind contribution, joint assembly, joint experiment ( Akira Yamamoto, Hitoshi Hayano)

ML Topics – SCRF Tuesday(Nov.18) morning Toward Plug Compatibility –He vessel (material, pressure vessel constraints,..) –Tuners –Couplers (OD, location, Q control, cryo losses) –Interface location discussion (…….) –Summary document for plug compatibility (……) Tuesday(Nov.18) afternoon Cryomodule Design and Tests –module status report from each region (…….) –New Reports or topics on the module performance and design (……) –5K shield removal experiment (…….) –H.P. Vessel code discussion (…….)