Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information How to Develop Land Use Information.

Slides:



Advertisements
Similar presentations
PARKS: Major Policy Topics  Park development guidelines  Joint use of park and recreation facilities  Park accessibility  Park acquisition priorities.
Advertisements

Considering Assistive Technology and the AT Plan Sara Menzel, ATP UCP Michigan Assistive Technology Center
Presented to: 2010 Airports Conference By: Sue McDonald With slides by Tom Klin, CH2M HILL Date: March 3, 2010 Federal Aviation Administration Cumulative.
ASSESSMENT IN HIAs Elizabeth J. Fuller, DrPH, MSPH Georgia Health Policy Center.
1 Planning and Environment Linkages: Case Studies Michael Culp and John Humeston FHWA November 2, 2006.
CITY OF TIGARD Respect and Care | Do the Right Thing | Get it Done City of Tigard Economic Opportunities Analysis May 10, 2011City Council Public Hearing.
Proposed Modification of Policies for Rural Employment Centers Policy 6.3 of the Future Land Use Element of the Alachua County Comprehensive plan CPA
Bend, OR | Eugene, OR | Portland, OR | Salem, OR | Seattle, WA | Vancouver, WA | Washington D.C. “Serving Land for Jobs” Infrastructure.
Lec 20, Ch.11: Transportation Planning Process (objectives)
Luci2 Urban Simulation Model John R. Ottensmann Center for Urban Policy and the Environment Indiana University-Purdue University Indianapolis.
Lec 15 LU, Part 1: Basics and simple LU models (ch6.1 & 2 (A), ch (C1) Get a general idea of urban planning theories (from rading p (A)
The Effects of Different Land Uses in Missouri on Local Fiscal Conditions – Cost of Community Services Project Update – 4/12/02.
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Zoning for Outdoor Advertising Purposes Or When is a cow pasture a commercial or industrial area?
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.
Behavior in Organizations
Literature Review and Parts of Proposal
All information contained within this document is proprietary to Risk Limited Corporation. prepared by Commercial Real Estate Hedging & Risk Management.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
California Rapid Assessment Method for Wetlands (CRAM) Project and Ambient Assessments.
E151U: Housing and Urban Development Policy Housing Planning.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
Chittenden County Land Use - Transportation Decision Support System November 19, 2003 Chittenden County Metropolitan.
Exurban Growth in the United States During the past 30 years, many families have left city centers and moved to "bedroom communities." These areas offer.
Chapter 8 – The Comprehensive Plan 10/3/ The Goals of Comprehensive Planning  Comprehensive plans are usually prepared for a period of 20 years.
FAO/WHO Codex Training Package Module 3.2 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.2 How to develop national.
What Makes a Local Redevelopment Plan Megan Coler Carmen Lethig.
DRA Perspective on What Recycled Water Applications from Investor- Owned Utilities Should Contain and How They Should be Evaluated CPUC Water Recycling.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
Avalon Park Retail Market Analysis Fishkind and Associates, Inc Corporate Blvd. Orlando, FL December 12, 2008.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
FREIGHTSUPPORTIVE LAND USE PLANNINGGUIDELINESFREIGHTSUPPORTIVE PLANNINGGUIDELINES FHWA Talking Freight Series May 18/05 Video Seminar on Context Sensitive.
Clark County Comprehensive Plan: Unique Opportunities and Resolutions. Land Use in Southwestern Washington Law Seminars International Vancouver Hilton.
Amherst County Comprehensive Plan (Update)
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
Guide for Rural Local Officials Evaluating Your Input into the Statewide Transportation Planning Process Developed by the National Association of Development.
The Capacity of Hope: Developing a Regional Build-Out Model with GIS Martin Kim, Tom Harner, Kathryn Youra Polk The Capacity of Hope: Developing a Regional.
Capturing Brownfield Success: A National Glimpse.
MONTGOMERY COUNTY PLANNING DEPARTMENT Maryland-National Capital Park and Planning Commission Master Plans in Montgomery County.
Jefferson County Agricultural Preservation and Land Use Plan Jefferson County’s Comprehensive Plan: Process and Strategies Presented to: Dane County Officials.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
Presentation to the Water and Environmental Planning Committee September 22, 2006 Ad Hoc Committee on UGB/A Policy: Progress Report.
Secondary & Cumulative Effects Analysis Training Program Module 2: How to Establish the SCEA Geographical Boundary.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Notice: The views expressed here are those of the individual authors and may not necessarily reflect the views and policies of the United States Environmental.
Managing 6(f) Conversions: The Good, the Bad, and the Ugly Greenville, SC September 8-11, 2015.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Prepared by: Alex Fisch Planning Services Division.
PURPOSE & NEED Categorical Exclusion Training Class.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
1 Draft Round 7.2 Cooperative Forecasts of Population, Households, and Employment Transportation Planning Board Timothy Canan, AICP April 15, 2009 Item.
Hillsborough County Public School Siting MPO SCHOOL TRANSPORTATION WORKING GROUP
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
New Comprehensive Zoning By-law December 12, 2016.
Portuguese American Cultural Center Property Rezoning to
GREENHOUSE GAS EMISSIONS INVENTORY
MPO School Transportation Working Group
Land Use Assumptions Public Hearing - 5/31/18
Introduction SCEA Organization Scoping Analysis Conclusions Mitigation.
BTB Real Estate Investment Trust
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
WSUP (Lightning W Tank #2)
Washoe County Board of Adjustment
WSUP The Club at ArrowCreek Grading
Unit 14 Emergency Planning IS 235
Presentation transcript:

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information How to Develop Land Use Information

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Determine Level of SCEA Analysis Collect Resource Data Identify Regulatory Programs Map Resources & Land Use Identify Methodologies/ Conduct Analysis Factors to Consider Developing and mapping land use information is part of the analysis section of conducting a SCEA. Because of its importance to the analysis process, the development of land use is being treated as a separate section in the training seminar. Developing and mapping land use information is part of the analysis section of conducting a SCEA. Because of its importance to the analysis process, the development of land use is being treated as a separate section in the training seminar. SCEA DO Be aware of how the development and mapping of land use information fits into the overall analysis of resources. Note that the analysis section of conducting a SCEA is discussed in detail in Module 5. SCEA DO Be aware of how the development and mapping of land use information fits into the overall analysis of resources. Note that the analysis section of conducting a SCEA is discussed in detail in Module 5.

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Agricultural Residential Commercial Industrial Open Space Parkland Other Agricultural Residential Commercial Industrial Open Space Parkland Other Land Use Types Generally Considered

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Land Use Considerations Past Land Use Present Land Use Future Land Use Land Use Considerations Past Land Use Present Land Use Future Land Use Land Use Considerations

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Why Develop Land Use Information Past Land Use -Provides a baseline from which trends can be developed. Present Land Use -Provides an intermediate year from which trends can be determined. -Provides a current analysis year to conduct overlay analysis. Future Land Use -Provides a build-out analysis year to conduct overlay analysis. Why Develop Land Use Information Past Land Use -Provides a baseline from which trends can be developed. Present Land Use -Provides an intermediate year from which trends can be determined. -Provides a current analysis year to conduct overlay analysis. Future Land Use -Provides a build-out analysis year to conduct overlay analysis. Land Use Considerations

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Mapping Land Use SCEA DO As part of the process for developing land use, map any available data sources. This will be helpful in preparing the data for the analysis methodologies that will be presented in Module 5. Be sure to map land use once all available data sources have been collected. Only land use information within the SCEA geographic boundary should be mapped. SCEA DO As part of the process for developing land use, map any available data sources. This will be helpful in preparing the data for the analysis methodologies that will be presented in Module 5. Be sure to map land use once all available data sources have been collected. Only land use information within the SCEA geographic boundary should be mapped.

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Past Land Use Key Past Land Use Data Sources

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Key Present Land Use Data Sources Present Land Use NOTE: Near future (1 - 5 years) counts in present time period for land use.

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Present Land Use SCEA CAUTION The appropriate development size(s) (i.e., subdivisions of a certain number of units, etc.) to be analyzed must be determined on a project-by- project basis. It is not necessary to scour the entire SCEA study area for proposed development such as individual residential lots less than one acre. Be sure to document the rationale for why a particular development size was chosen. SCEA CAUTION The appropriate development size(s) (i.e., subdivisions of a certain number of units, etc.) to be analyzed must be determined on a project-by- project basis. It is not necessary to scour the entire SCEA study area for proposed development such as individual residential lots less than one acre. Be sure to document the rationale for why a particular development size was chosen.

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Urban Developments units residential, 5,000 square feet commercial and 1,000,000 square feet industrial. Rural developments units residential, 2500 square feet commercial and 500,000 square feet industrial. Urban Developments units residential, 5,000 square feet commercial and 1,000,000 square feet industrial. Rural developments units residential, 2500 square feet commercial and 500,000 square feet industrial. SHA Regional & Intermodal Planning Division (RIPD) Major Development Matrix Present Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Key Future Land Use Data Sources Future Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Development of future land use scenarios (done for each alternative including the no-build) for SCEA is primarily based on two sources: Travel Forecasts - Review and map future land uses with assumptions based on travel forecasts. Local/Regional Planning Resources - Meet with local planners and utilize planning resources such as the Regional & Intermodal Planning Division (RIPD), Metropolitan Planning Organizations, the Constrained Long Range Plan (CLRP) and local master plans to develop future land use scenarios. Development of future land use scenarios (done for each alternative including the no-build) for SCEA is primarily based on two sources: Travel Forecasts - Review and map future land uses with assumptions based on travel forecasts. Local/Regional Planning Resources - Meet with local planners and utilize planning resources such as the Regional & Intermodal Planning Division (RIPD), Metropolitan Planning Organizations, the Constrained Long Range Plan (CLRP) and local master plans to develop future land use scenarios. Future Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information In special cases, “Expert Land Use Panels” can be convened to identify future land use scenarios, if a project is especially complex or if local jurisdictions, agencies or special interest groups disagree that a particular land use will or will not occur. The “Expert Land Use Panels” are not required when developing land use for a SCEA, but are considered on a project by project basis. Future Land Use Data Sources Future Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information SCEA DO In situations where two or more different future land use scenarios are predicted for a project alternative: Determine the scenario that will most likely reflect future land use. Try to come to an agreement; if you can’t, determine how to proceed on a project by project basis. SCEA DO In situations where two or more different future land use scenarios are predicted for a project alternative: Determine the scenario that will most likely reflect future land use. Try to come to an agreement; if you can’t, determine how to proceed on a project by project basis. Key Future Land Use Data Sources

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Middle River Employment Center Access Study (MRECAS) Baltimore County originally performed an economic Analysis for properties designated for development under the county's economic development plan. - This analysis was originally used to support SHA's Project Purpose and Need Statement. - In general, the study was based upon projections of new business types and potential employee base associated with these businesses. - The study determined that approximately 50% of the developable land would be developed. The Environmental Resources Agencies requested that an independent study be performed to confirm the County’s findings prior to concurring upon the project purpose and need. Baltimore County originally performed an economic Analysis for properties designated for development under the county's economic development plan. - This analysis was originally used to support SHA's Project Purpose and Need Statement. - In general, the study was based upon projections of new business types and potential employee base associated with these businesses. - The study determined that approximately 50% of the developable land would be developed. The Environmental Resources Agencies requested that an independent study be performed to confirm the County’s findings prior to concurring upon the project purpose and need. MRECAS Expert Land Use Team NOTE: The MRECAS expert land use panel considered the development of land use within the area where secondary effect were expected to occur; not the whole SCEA geographic boundary.

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information The independent study was performed by a team of real estate, development and engineering professionals. - Environmental resources (wetlands, stream buffers, cemeteries, parks and schools) were subtracted out of the land designated for development to determine the total amount of actual developable land. - The results of the analysis projected that the economic development plan would create 13,830 jobs and would require 7,274,520 s.f. (approximately 170 acres) of new development that may potentially be built-out over a 10-year period. - It was therefore determined that the projected economic development could be accommodated within the county's developable land envelope (this includes consideration of environmental resources). The study was found to be acceptable by the resource agencies and concurrence on the project purpose and need was attained. The independent study was performed by a team of real estate, development and engineering professionals. - Environmental resources (wetlands, stream buffers, cemeteries, parks and schools) were subtracted out of the land designated for development to determine the total amount of actual developable land. - The results of the analysis projected that the economic development plan would create 13,830 jobs and would require 7,274,520 s.f. (approximately 170 acres) of new development that may potentially be built-out over a 10-year period. - It was therefore determined that the projected economic development could be accommodated within the county's developable land envelope (this includes consideration of environmental resources). The study was found to be acceptable by the resource agencies and concurrence on the project purpose and need was attained. MD 43 Expert Land Use Team (continued) Middle River Employment Center Access Study (MRECAS)

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information The cumulative impact analysis must account for the secondary development resulting from a project alternative, plus any additional development within the SCEA geographical boundary that is not dependent upon a/the project alternative. Assessing Land Use for Cumulative Impacts Future Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Secondary Impacts - Land use changes that occur because of a Project Alternative. Cumulative Impacts - Land use changes that would occur or have occurred regardless of a Project Alternative. Secondary Impacts - Land use changes that occur because of a Project Alternative. Cumulative Impacts - Land use changes that would occur or have occurred regardless of a Project Alternative. Types of Impacts That Cause Land Use Change Within a SCEA Boundary Land use changes caused by secondary project impacts Cumulative land use changes resulting from non-project related impacts Total land use change in the SCEA geographic boundary + = Future Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Coordination with local governments and/or developers should indicate planned development that will not proceed without approval of a specific transportation alternative. Coordination with Local Planning Officials NOTE: Planned development may be unique to each project alternative. Future Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Identify any local zoning implications and identify changes in land use or level of development that may occur as the result of each project alternative. Coordination with Local Planning Officials Future Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information SCEA DO Your meeting with the local planners may be your most important coordination in developing your future land use scenario, especially in respect to secondary development. It is important to present alternatives mapping when identifying potential secondary impacts with local planners. This will help illustrate differences in land use changes that may result from two or more alternatives. SCEA DO Your meeting with the local planners may be your most important coordination in developing your future land use scenario, especially in respect to secondary development. It is important to present alternatives mapping when identifying potential secondary impacts with local planners. This will help illustrate differences in land use changes that may result from two or more alternatives. Future Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Access Controlled Facilities - Secondary impacts generally occur near intersection and interchange areas. Non-access Controlled Facilities - Secondary impacts can be spread out over the entire direct impact study area (i.e. strip development). Access Controlled Facilities - Secondary impacts generally occur near intersection and interchange areas. Non-access Controlled Facilities - Secondary impacts can be spread out over the entire direct impact study area (i.e. strip development). Access Control/or Lack of it Future Land Use

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information MD 5 - Hughesville Transportation Improvement Project MD 5 Land Use Development Note that future development, as analyzed in the MD 5 EA, generally falls within a 1 -5 year timeframe. Under current SHA Guidelines, this development would be interpreted as being within the “present” time frame. MD 5 Land Use Note

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Proposed Major Developments in the SCEA Boundary MD 5 - Hughesville Transportation Improvement Project

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information Proposed Development and CTP areas in the SCEA Boundary MD 5 - Hughesville Transportation Improvement Project

Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information MD 5 - Hughesville Transportation Improvement Project SCEA Guidelines recommend that land use from all three time frames be developed and mapped. Below are two main decisions in the SCEA process for MD 5 that are not consistent with SHA’s SCEA Guidelines. Only some of the information for the present time frame existed as readily available. Based on current SHA Guidelines the MD 5 SCEA should document map development for all three time frames including rationale for not mapping existing readily available land use. Some of the analysis methodologies used in determining secondary and cumulative effects did not necessitate mapping past, present or future land use. (It is good practice not to select analysis methodologies prior to completing acquisition of all land use materials. The availability of land use mapping should guide the rationale for which analysis methodologies to use). SCEA Guidelines recommend that land use from all three time frames be developed and mapped. Below are two main decisions in the SCEA process for MD 5 that are not consistent with SHA’s SCEA Guidelines. Only some of the information for the present time frame existed as readily available. Based on current SHA Guidelines the MD 5 SCEA should document map development for all three time frames including rationale for not mapping existing readily available land use. Some of the analysis methodologies used in determining secondary and cumulative effects did not necessitate mapping past, present or future land use. (It is good practice not to select analysis methodologies prior to completing acquisition of all land use materials. The availability of land use mapping should guide the rationale for which analysis methodologies to use).