Engineering Operations FY08 Outage: In-Vessel Work: –BSE Vacuum Vessel Interfaces Completed –Liquid Lithium Divertor Tray trial fit-ups –HHFW Antennas.

Slides:



Advertisements
Similar presentations
T N Todd JT60SA Remote Handling meeting 24th November 2008 Boom (transporter) Two-arm manipulator Remote Handling at JET Required due to high in- vessel.
Advertisements

Plans for Diagnostic Removals, Storage, and Re-installations during NSTX Upgrade Outage B. Stratton NSTX Team Meeting 9/13/2011.
Engineering Operations Outage Status: Post-run diagnostic calibrations have been completed and in-vessel work can start on PCHERS, FIDA, MPTS, and the.
August NSTX-U Team Meeting. Engineering Operations August 15, 2014 NSTX-U In-Vessel installations and calibrations have concluded, and activities have.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Facility & Diagnostic Overview for and Beyond Masa Ono, PPPL and the NSTX Research Team 25th NSTX PAC Meeting Conference Room LSB-B318, PPPL.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Presented to: Pacific Aviation Directors Workshop Prepared By: Frank Mesa, Manager, Guam NCE SSC Place & Date: Westin Hotel Guam March , 2012 Federal.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX NSTX PAC-25 – Background info (Menard)February 18, NSTX FY Research Milestones (base and incremental ) Expt. Run Weeks: 1)Transport.
1 CHI Summary Transient CHI (XP606) –All systems operated reliably without any faults Edge Current drive (XP533)
February NSTX-U Team Meeting. Engineering Operations Feb. 11, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in late March (3/28/2014)
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Engineering Operations OH water leak: Water leak is located ~ 4.5” into the upper OH lead. Leak 2 o’clock Cooling hole in. dia.
April NSTX-U Team Meeting. Engineering Operations April 25, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in mid-June to shift activities.
RAMI Requirements for DEMO, Gaps, and Thrusts 03 March 2009 RAMI Panel Members: Mohamed Abdou (UCLA), Tom Burgess (ORNL), Lee Cadwallader (INL), Wayne.
Advances In High Harmonic Fast Wave Heating of NSTX H-mode Plasmas P. M. Ryan, J-W Ahn, G. Chen, D. L. Green, E. F. Jaeger, R. Maingi, J. B. Wilgen - Oak.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
Brent Stratton for the NCSX Team Princeton Plasma Physics Laboratory Oak Ridge National Laboratory NCSX Program Advisory Committee Meeting #8 Princeton.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
NSTX Research Operation June 29, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova.
University of Texas Confidential, Patents pending Fusion Driver (CFNS) NSTX - Super U and CFNS M. Kotschenreuther, S. Mahajan, P.Valanju Institute for.
Dan Bauer - CDMS Project ManagerAll experimenters meeting - April 23, 2007 Cryogenic Dark Matter Search (CDMS) Progress at Soudan since last summer Successful.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Engineering Operations Outage Schedule Center Stack casing is scheduled to go back in the vessel today Complete NB armor, Diagnostic calibrations, clean/photo/close,
NSTX Team Meeting May 5, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
Solenoid Free Plasma Start-up Mid-Run Summary (FY 2008) R. Raman and D. Mueller Univ. of Wash. / PPPL 16 April 2008, PPPL 1 Supported by Office of Science.
Summary of RF Work To Date G. Taylor NSTX Monday Physics Meeting June 21, 2010 NSTX Supported by 1.
NSTX-U Run Planning Guidance for 2015 NSTX-U Research Forum 1 FY2015 (and 2016) research milestones will guide prioritization of eXperimental Proposal.
FY10 Ops Preparations: Extended vessel bake (to 3 weeks) Additional Physics Operators Spare LITER probes/fill systems fabricated & new staff Run day status/plans.
M. Ono NSTX FWP 2014 Budget Planning Meeting Apr. 15, 2012 Chapter 10. NSTX-U Facility Status and Proposed Upgrades Text, figures – mostly there except.
Engineering Operations Outage Status: Tile cleaning is complete Tentatively planning on 2 LITER operation. Design Review upcoming Shielding of HHFW/in-vessel.
FY WEP TSG Goals & WEP-Relevant Diagnostic Upgrades NSTX Supported by WEP TSG Meeting September 14,
Supported by Office of Science NSTX S.M. Kaye, PPPL ITPA PPPL 5-7 Oct Confinement and Transport in NSTX: Lithiumized vs non-Lithiumized Plasmas Culham.
1 NSTX EXPERIMENTAL PROPOSAL - OP-XP-712 Title: HHFW Power Balance Optimization at High B Field J. Hosea, R. Bell, S. Bernabei, L. Delgado-Aparicio, S.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Masa Ono February 5, 2016 NSTX-U Team Meeting.
TE-CRG Activities D. Delikaris, TE-CRG.
Engineering Operations Outage Schedule The vessel & beamline are under vacuum. 1st Bake-out complete. Air leaks found and fixed. The OH coil will be installed.
Masa Ono Questions to be discussed will be how much we should glow (if any of what type for how long) and/or the degree of lithium deposition prior to.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
LRTSG Milestone Review 12/16/10 Lithium Research Topical Science Group FY11-FY12 Milestone Review II Charles Skinner for LRTSG 1/7 Follow up to 11/29/10.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
NSTX APS-DPP: SD/SMKNov Abstract The transport properties of NSTX plasmas obtained during the 2008 experimental campaign have been studied and.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
For the NSTX Five-Year Research Program 2009 – 2013 M.G. Bell Facility and Diagnostic Plans.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
PARTS FOR ALL MAKES CRANE PARTS.
PLC-based control systems at SOLEIL - ICALEPCS 2017
EYETS septa status Septa activities TE/ABT Thierry Masson
It’s Time for a Break!!!.
Polarized Source: Recent Activities
Lithium Vapor Box Divertor
Onsite Training at JLab
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
Presentation transcript:

Engineering Operations FY08 Outage: In-Vessel Work: –BSE Vacuum Vessel Interfaces Completed –Liquid Lithium Divertor Tray trial fit-ups –HHFW Antennas upgraded for balanced power feeds –New Diagnostic Shutters and TIV/Shutter Control System installed Ex-Vessel Work: –All TF flag surfaces inspected, cleaned and silver-plated –New tray system installed for BES –Platform extension and power panel for MSE –High K Scattering Diagnostic remote controls installed –Two spare NB Ion Sources rebuilt. Cryogenic Compressor rebuilds

Engineering Operations Expect to begin power ops (ISTP) next week. Plasma Ops by Feb 16th NB conditioning going well with all 3 sources operating > 80keV. An extended NSTX run plan is possible (from the 14 to up to 20 weeks) –A mid-run break may be required to replace the NB calorimeter bellows. –The LLD trays and BES diagnostic will not be installed until end of the run. –Operations will resume in early FY10 to commission the LLD and BES LITER, Lithium Shaker and HHFW systems will be re-commissioned in parallel with NSTX operations. Resources will have to be balanced to maintain the needed support of LLD/BES. Planning for the Maintenance Weeks is in progress, and will consider the impact of the 2 March ReNew workshops. Discuss at the Program Ops Mtg. Completion of the MSE-LIF upgrade to be deferred to next year.

Engineering Operations FY09 Outage/ FY10 Ops Planning: An early completion date for the planned 14 week run is in Mid-June. Plan on an abbreviated outage to install and commission the Liquid Lithium Divertor system, and to complete the new BES diagnostic. Hope to resume operations sometime in the fall with this new capability. Ten weeks of in-vessel work is planned. Need to consider post and pre-run diagnostic calibration requirements for this outage. Significant Elevated Water Tower riser repairs, and a PSE&G replacement of 138kV lines are needed before the start of the FY10 run.