EUG 01/02/2011 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.

Slides:



Advertisements
Similar presentations
Online System for Compiling Member Comments July 2010 Near East Regional Workshop.
Advertisements

Temporary storage Sven Hagemann GRS. Types of temporary storage 1.Storage of commodity mercury  Dealer, wholesaler, governmental stocks 2.Storage of.
TE-MPE-EM Costing Betty Magnin 29/11/ Costing History Operational budgets Invoicing Cost balancing over fiscal year 2 29/11/2012.
S’Cool LAB INFO session for future tutors 19/02/2015
CERN Betty Magnin / Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Betty Magnin / Erik van der Bij CERN Electronics Design Office.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
EUG 20/06/2012 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
DIRECTOR-GENERAL’S UNIT Training activity report DTOs workshop
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Introduction of Quality Procedures in the Electronics Design Office
CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized.
Özkan ŞAHİN Uludağ University Physics Department Bursa -TURKEY Bursa gas detector laboratory, status.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
MATERI XI PRODUKSI & OPERASIONAL. 5 ISSUES That arise when trying to produce a product or service Capacity (How much can I produce) Scheduling (How am.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
TE-MPE-EM Budget Structure Betty Magnin 29/11/
Agenda : CLIC Civil Engineering and Services (CES) WG.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
CERN workshop upgrade Aida WP 9.2 Rui De Oliveira.
Large area detectors Aida WP 9.2 RD51 WG6
Institutional Development Planning Priorities.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk E2-201 Information Systems.
Treatment Prevalence Project Background information Expert meeting Implementation of the treatment strategy – Module 1: TDI prevalence 24 June 2013.
CERN EST -DEM CERN Erik van der Bij EP ELECTRONICS ADVISORY BOARD 4th Meeting 7 November 2002 Erik van der Bij CERN EST-DEM Group leader.
Security research for border security Erik Berglund Director of Capacity Building 23 September 2010.
TE-MPE Annual Meeting Activity report of EM section 11/12/2015 Betty Magnin.
How to make a PCB.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
CERN Workshop upgrade status Rui De Oliveira RD51 22/11/2011 WG6 WG6 9/1/20111Rui De Oliveira.
Long DB Si- telescope Integration of a Si-telescope in the HIE ISOLDE long diagnostic boxes 21/09/2015LDB Si-telescope1.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
TE-MPE-EM: Subcontracting Raphaël Berberat
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
TE-MPE-EM Assembly workshop Betty Magnin 29/11/
TE-MPE-EM Design Office William Billereau 29/11/
Suggestions for a MPGD Workshop in Frascati Rui de Oliveira 1.
 A PCB is printed circuit board, also known as a printed wiring board. It is used in electronics to build electronic devices. A PCB serves 2 purposes.
SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
1 RD51 Kolimpari June 2009 Stéphan AUNE, BULK lab at Saclay.
EN-ICE-DEM Some figures for job requests throughout the whole section, including 280 designs (new or modifications) 700 in-house MPGD and PCB.
MPE-EM Workshop The assembly workshop S. KaufmannJune 16, 2016.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Demineralised water cooling system
Large volume GEM production Rui De Oliveira TE/MPE/EM
Subcontracting of electronics modules
MPE-EM Workshop Purchasing strategy for electronic modules
CSP 25th November 2010 Technical agreement number 3: overview
Tunnel Cross Section Studies
Building 107 Update Introduction Project team Location Design status
Gaseous detectors Task Resistive anode Micromegas
MPE-EM Workshop Design Office William Billereau
HL Consolidation Day Analysis of needs from BE-ICS
10/month is the present production rate 2 FTE + sporadic contributions
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Radiological and Environmental Monitoring System (REMS)
East Hall under construction
MPGD Experience with Technology Transfer
Presentation transcript:

EUG 01/02/2011 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1

EUG 01/02/2011 Activity similar to job requests throughout the whole section, including 260 designs (new or modifications) 710 in-house MPGD and PCB manufacturing 500 in-house assembly and repair 55 external PCB manufacturing orders 80 external assembly orders 2 TE-MPE-EM some figures for 2010

EUG 01/02/ TE-MPE-EM News New structure since July 2010: Move to TE-MPE, Fabio Formenti SL Design office: capacity increased by 2 since September 2010 Subcontracting: New suppliers in poorly balanced countries (DK, UK and GR) Building 107: Merge all activities from B102, B1 and B301 in a single and modern building, suited for surface finishing and PCB manufacturing. Project launched in Spring, MS in September, IT in December The study shall start in April 2011 for a finished building before the end of 2013.

EUG 01/02/ Building 107- project DG stated that this project is a priority for CERN Need more space for new detector developments and for new larger machines Total floor Area of the building: 3200m2 Renewed cooling and ventilation systems Safety for environnement and personnel Access control, alarms (fire and gas detection) Opportunity for EM to be grouped in one building

EUG 01/02/ Investment of total 785 KChf in to be able to manufacture large MPGD components (RD51) –Large developing machine (DR) –Large copper etching machine (DR) –Large stripping machine (DR) –Large laminator (ordered) –Large dryer (ordered) –Large oven (ordered) –Large exposure machine(OK) –Continuous Kapton etching machine(ordered) –Electro-chemical copper etching line(study) All machines will be ordered by mid 2011 PCB manufacturing workshop

EUG 01/02/ General project layout TE-MPE-EM in Building 867

EUG 01/02/ The electronic repair workshop General purpose repair area TE-MPE-EM staff Diagnostic and repair area All declared users

EUG 01/02/2011 Building 867, pending actions: Collaboration with SC, RP, EL, CV, IT,… Training for staff (RPE, work in controlled areas) Order equipments for the general purpose repair area Optimize a final layout with the declared users A 260kCHF budget has been defined for this project 8 The workshop should be in operation by 2011/Q1 or Q2