Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.

Slides:



Advertisements
Similar presentations
UNSW Strategic Educational Development Grants
Advertisements

Brett Parker* BNL-SMD *For the ATF2 Superconducting Magnet Upgrade Collaboration Update on SC Magnets and Schedule.
Nick Walker KEK-DESY meeting 7 th March 2005.
Halo calculations in ATF DR Dou Wang (IHEP), Philip Bambade (LAL), Kaoru Yokoya (KEK), Theo Demma (LAL), Jie Gao (IHEP) FJPPL-FKPPL Workshop on ATF2 Accelerator.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
ILC Spanish Meeting – Gandía, 1 de Diciembre de /25 ILC Communication and Outreach ILC Communication and Outreach Perrine Royole-Degieux
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Introduction to Standard 2: Partnering with consumers Advice Centre Network Meeting Nicola Dunbar October 2012.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
ICFA Report to KILC12 January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; 23 April 2012ICFA Report to KILC121.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Feedback R&D for Optical Cavity Ryuta TANAKA (Hiroshima univ.) 19 th Feb 2013 SAPPHiRE DAY.
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
Operations, Test facilities, CF&S Tom Himel SLAC.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Agenda for 1st TB and SGC Joint meeting on Dec. 13 (from 15:00 to 19:00) 15:00 to 17:00 Open Session 15:00-15:30 Review of Hardware and Instrumentation.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Prospects of the ATF operation in FY2016 N. Terunuma, KEK 19 th ATF TB/SGC meeting Jan , LAL Orsay.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement European Network for.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
Accelerator Physics Topics REPORT Philip Bambade LAL-Orsay LCWS 2005 Stanford, 22 March 2005.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
IN2P3-KEK BEAST meeting in Strasbourg January 2015 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
1 You have to Check URL of Change of ICB and TB member or member’s institute comparing last meeting.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
LAL-IHEP collaboration on the linear collider final focus & ATF2 prototype Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Special ATF Session - ATF/ATF2 day on 28th September -
Updating the Regulation for the JINR Programme Advisory Committees
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
ATF2 post-IP Diamond Sensor Status
Plans for Laser-wire System Grahame Blair 30th May 2005
Oversea collaborators
LAL Status - based on inputs from W. Kaabi and A. Stocchi - cf
report from 12th ATF TB & SGC meeting and trip to KEK
S4 will be a “big” Collaboration:
CLIC-ILC BDS & MDI work.
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
Presentation transcript:

Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April 2013

Outline 1.Composition 2.Internal evaluation of new proposals, of current projects and of performances 3.Future ATF & ATF2 research plan 4.(Re-) organization of operation for goal 1 5.Training junior staff to support operation 6.Emphasize (more) publications

P. BambadeLAL (chair) G. WhiteSLAC (co-chair) K. YokoyaKEK T. SanukiTohoku Univ. J. GaoIHEP E. S. KimKNU E. ElsenDESY A. JérémieLAPP F. ZimmermannCERN S. BoogertRHUL M. WendtFNAL N. PhinneySLAC Composition

Internal evaluations (1) On-going activities and new proposals 13:30 Opening 10 ‘ 13:40 Comptons (KEK/LAL) 20’ 14:00 1-2pm DR emittance R&D 20‘ 14:20 ATF2 status 30‘ Example: 13th ATF TB and SGC meeting, January 2012 (KEK) 16:10 Discussion 1h30‘ 17:40 Summary by the TB chairman 20‘ Philip Bambade (LAL ) Nobuhiro Terunuma (KEK) Jehanno Didier (LAL), Tsunehiko Omori (KEK) Kiyoshi Kubo (KEK) Glen White (SLAC), Toshiyuki Okugi (KEK) Reviews New proposals Theoretical and experimental investigation on resolution of optical transition radiation transverse beam profile monitor 20’ Measurement of beam halo and BSM Compton recoil electrons after the BDUMP magnets 20‘ CLIC R&D proposals for ATF/2/3 20‘ Pavel Karataev (RHUL) & Alexander Aryshev (KEK) Philip Bambade (LAL) Rogelio Tomas (CERN) Coffee break

Internal evaluations (2) On-going activities and new proposals Normally twice per year: - ……… - 13 th ATF2 project meeting, Jan (KEK) - 14 th ATF2 project meeting, Jun (KEK) - 15 th ATF2 project meeting, Jan (KEK) - “ATF2 day”, ECFA LC2013, May 29, 2013 (DESY) Lately mostly rather informal presentations and approval process + significant discussions concerning our scheme for international collaboration, and the strategy & plan for goal 1  Consider resuming more classical review format for new proposals, with written submissions to rapporteurs and assessment reports  Improve proceedings (mea culpa for missing minutes) and dissemination

Future ATF / ATF2 research plan N. Terunuma 1)Part of KEK internal review process (Accelerator division, Directorate) 2)Direct consultations of ATF KEK management team with its main international partners  Internal reviewing by ATF TB as advisory technical body, useful especially in case of external contributions to funding & central support

Re-organization of collaboration & operation style in 2012 has been one of the keys for progress on goal 1 - training of 12 junior scientists as “operators” (contribution from ATF R&D groups) - centrally agreed joint daily & weekly operation plan - single commissioning leader liaising between partner teams and coordinating operation  K. Kubo (KEK) - short continuous ATF2 periods as preparation, leading up to week(s) long fully dedicated continuous runs (Re-) organization of operation combining goals Training of junior staff to support operation Plea to continue training and centrally managed continuous runs TB discussion + other ad hoc groups in past 2 years… 1.Demonstrate international collaboration in accelerator operation 2.Essential for future successes of goal 1 + 2

Global collaboration papers - only refereed publication on ATF2: “Present status and first results of the final focus beam line at the KEK Accelerator Test Facility”, by P. Bambade et al. (ATF Collaboration): Physical Review Special Topics - Accelerators and Beams 13, (2010) - ICFA beam dynamics letters: Extensive ATF2 reports in 2009, 2011 and 2013 issues  High profile refereed publication timely following our recent goal 1 progress R&D team papers - example 1: “Cavity beam position monitor system for the Accelerator Test Facility 2”, by Y.I. Kim et al.: Physical Review Special Topics - Accelerators and Beams 15, (2012) - example 2: “A nanometer beam size monitor for ATF2”, by T. Suehara et al.: Nucl. Instrum.Meth.A616(2010)1-8 Papers on individual research (e.g. junior scientists) - example: “First beam waist measurements in the final focus beam line at the KEK Accelerator Test Facility, by S. Bai et al.: Physical Review Special Topics - Accelerators and Beams 13, (2010) Many conference reports & posters each year ! - example: “Latest Performance Results from the FONT5 Intra-train Position and Angle Feedback System at ATF2”, by A. Gerbershagen et al.: IPAC-2011-MOPO017 Dissemination: publications and reports No central management / monitoring  role for TB or separate body ?

Concluding comment The TB is an important advisory body for the management ATF collaboration Also serves as forum for critical discussions Its role may be (somewhat) expanded in future Thank you !