21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 1 The candidate STANDARD diagram for the HV FSM in ALICE TO WHAT AND WHY.

Slides:



Advertisements
Similar presentations
Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.
Advertisements

ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
SDD LVPS progress Vasily Kushpil Vojtech Petracek Libor Skoda CTU Prague ALICE week Utrecht.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
S.PopescuAlice DCS workshop, Colmar, Standards for control room PVSS panels A brainstorm meeting.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
MDT PS DCS for ATLAS Eleni Mountricha
D etector C ontrol S ystem HMPID SB G. De Cataldo CERN-CH, A. Franco & A. Nardulli INFN Bari, I 1 HMPID Updates and prototyping HMPID DCS with.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Peter Chochula ALICE DCS Workshop, October 6,2005 PVSSII Alert Handling.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels.
1 Responsibilities & Planning DCS WS L.Jirdén.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Wayne Salter, CERN The LHC Experiments’ Joint Controls Project Framework ALICE DCS Day 10 th September 2001.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
ATLAS MDT HV – LV Detector Control System (DCS)
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System: towards the final system
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 1 The candidate STANDARD diagram for the HV FSM in ALICE TO WHAT AND WHY IT APPLIES FOR THE CANDIDATE HV STANDARD DIAGRAM THE TIME SCHEDULE

21/6/2004 Colmar, ALICE week G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 2 Det-Mod-1 Detector DCS GasLV-1/ FEE-1HV-1 SMI Control Unit SMI Device Unit Ch 1 Nth_trip Soft-interlock Auxiliary communication channel: under definition HVMod 1 HVPS1 HV CRATE LV P Supplies FEE LVPS14FEEMod 1 LVPS1 HV LV/FEE Detector DCS Ch 1 Nth_trip Soft-interlock a) b) TO WHAT AND WHY IT APPLIES FOR The standard diagram applies for a detector part where some HV channels are connected ; It aims to reduce the HV ramping-up time; The HV control program has to provide intersystem software interlocks:HV-LV-, majority condition on the tripped channels for the error recovering; enabling/disabling channel configuration;…….. The standard diagram applies for a detector part where some HV channels are connected ; It aims to reduce the HV ramping-up time; The HV control program has to provide intersystem software interlocks:HV-LV-, majority condition on the tripped channels for the error recovering; enabling/disabling channel configuration;……..

21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 3 CONFIGURING ON Go_CONFIGURED RESET ERROR Severe Alarm conditions crate fan tray failure un-calib. Board external interlock…... RESET Go_INTERMETIATE Go_OFF Go_ON RESET OFF CONFIGURED_OFF INTERMEDIATE The candidate HV STANDARD diagram Acknowledged #trips < max/Δt RAMP_DOWN_HIGHRAMP_DOWN_FULLRAMP_DOWN_LOWRAMP_UP_HIGHRAMP_UP_LOWRAMP_UP_FULL Go_CONFIGURED_OFF Go_ON RESET Go_INTERMEDIATE Go_CONFIGURED_OFF RESET REPAIR Max/ Δt #trips ≥ max/Δt If #trips < max/Δt Wait time over for automatic recovering OFF BOOTING Go_OFF Reset (Kill) PWS_ON ON Power supply state diagram Alarm severities and ERROR recovering within the FSM Severe Alarm - - ERROR Warning Man. REPAIR Warning Auto REPAIR

21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I Alarm Handling from the JOCOP FW sub-project guidelines and convention document Following the guidelines of the AWG the intention of an alarm is to bring an anomaly situation to the attention of an operator and as such alarms are considered to be messages which are displayed to the operator via the alarm display and that are logged. An alarm does not initiate an action. Should an action be required then this should be handled within the FSM. An alarm has several properties: · Its Origin, which is used to identify the source of an alarm. · Whether or not the alarm requires acknowledgement. · Its Severity Level, which is used to characterise the seriousness of the alarm. · Its Dependencies on other alarms. · Certain Additional Details about the alarm.

21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 5 Alarm sources ALARM NOTIFICATION in PVSS System RECOVERING within FSM Alarm notification in PVSS and system recovering within FSM

21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 6 Time schedule as Conclusions Dec. 2004Jan.05Mars.05 HV Standard LV Standard DCS Standard June 04July 04August 04Sept. 04Oct. 04 Definition of the Standard Diagrams HV-LV FSM Starting of implementation DCS ready