Objectives Discuss final project deliverables Control Terminology

Slides:



Advertisements
Similar presentations
ERT 210 Process Control & dynamics
Advertisements

Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
Chapter 4: Basic Properties of Feedback
Chapter 4 — Control Principles Chapter 4 Control Principles Control System Components Sensors Controllers Controlled Devices Control Agents Control Functions.
CHAPTER V CONTROL SYSTEMS
The Proportional-Integral-Derivative Controller
CHE 185 – PROCESS CONTROL AND DYNAMICS
CHE 185 – PROCESS CONTROL AND DYNAMICS
Process Control Instrumentation II
Control System Instrumentation
Chapter 7 PID Control.
Proportional/Integral/Derivative Control
Objectives Discuss Project Topics Learn to design VAV and DOAS System.
Lecture Objectives: Learn about automatic control Use life-cycle cost analysis integrated in eQUEST.
Conditioning of Moist Air
Objectives Complete high-quality projects Understand expectations Control theory and design.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Course project presentation Thursday in class Timing: 4 minutes (strictly controlled) Approximately 1 PowerPoint Slides per minute Content Problem Introduction.
Objectives Discus final project Load calculation.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Objectives More HVAC systems - Sorption (absorption) chillers
Control Theory Control System Objectives  Establish a final condition  Provide safe operation  Eliminate the human element  Assure economical operation.
ERT 210/4 Process Control Hairul Nazirah bt Abdul Halim Office: CHAPTER 8 Feedback.
Chapter 8 Feedback Controllers 1. On-off Controllers Simple Cheap Used In residential heating and domestic refrigerators Limited use in process control.
Miss Hairul Nazirah bt Abdul Halim
Final Project Presentation On Monday, same classroom at noon PowerPoint (5 minutes presentation) Upload the file before the class Approximately 6-7 slides.
Energy Plus & Open Studio Class
Objectives Finish DOAS Control Terminology Types of controllers
Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final.
Features of PID Controllers
Introduction to Energy Management. Week/Lesson 11 Control Systems for Occupant Comfort.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Process Control Methods 1. Open-Loop Control 2 Process control operations are performed automatically by either open-loop or closed-loop systems Processes.
Control Loops Tune a Fish. Control Loops Tuning of a control loop involves selecting loop parameters to ensure stable control under all operating conditions.
Lecture Objectives: Define the final project Deliverables and Grading policy Analyze factors that influence accuracy of our modeling study Learn about.
Final Project Format and Deliverables Examples
Lecture Objectives: Analyze several modeling problems –Examples from the final project list Economizer Solar collectors Phase change thermal storage materials.
Final Project I need your proposal about the final project! It should include –Title –Group members –Objective –Short description –Methodology –Expected.
Reminder about the Filed Trip Tomorrow 8 am St. Edward's University We will meet at 8:00 am at the south entrance of the new Science building (visitor.
Advanced control strategies. CONTROL SYSTEMS The process parameters which are measured using probes described in the previous sections may be controlled.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
MISS. RAHIMAH BINTI OTHMAN
Instrumentation I - Session 5 Session 5 - Agenda ActivityEst. Time 1. Agenda 2. Introduction to Primary Sensors, Transmitters and Transducers (Chapter.
Cascade Control Systems (串级控制系统)
1 PID Feedback Controllers PID 反馈控制器 Dai Lian-kui Shen Guo-jiang Institute of Industrial Control, Zhejiang University.
Announcements Next class is the course evaluation
Lecture Objectives: Discuss HW4 Continue with advance air systems
Announcements End of the class – course evaluation
CHAPTER V CONTROL SYSTEMS
Controllers and Positioners
Lecture Objectives: Photo Voltaic & Solar Hot Water Systems
PERFORMANCE EVALUATION Economizer Enthalpy Sensors
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Lecture Objectives: Answer questions related to HW 4
Announcement No project presentations !
Lecture Objectives: Finish with HVAC systems
Electronic Control Systems Week 5 – Closed Loop Control
Brian Wallingford, Applications Engineer
Project.
Lecture Objectives: Discuss HW2
Control System Instrumentation
Process Control Engineering
Features of PID Controllers
Objectives Learn about 1) Control for HVAC systems
Lecture Objectives: Discuss Projects 1 and 2
Announcement No project presentations !
Electronic Control Systems Week 7 – Closed Loop Control
Presentation transcript:

Objectives Discuss final project deliverables Control Terminology Types of controllers Differences Controls in the real world Problems Response time vs. stability

FINAL PROJECT DELIVERABLES AND GRADING 1) PROJECT REPORT: - Project statement (introduction) 2 pages Explain what are you designing/analyzing and why is that important On the second page clearly identify (bullet list) project outcomes - Building description (geometry) 1-3 pages Schematics that focus on your system(s) Identify all assumptions and simplifications you introduced - Methodology 1-3 pages Describe methodology (equations, schematics, …) Provide a list of assumptions used in your methodology - Results 3-5 pages Formatted results with comments Tables, Charts, Diagrams, … Analysis and Results discussion - Conclusion 0.5-1 page Summary of most important results 2) PRESENTATION: - 5 minutes (exactly) Power point presentation (4-6 slides) GRADING CRITERIA: 1) Analysis approach: 60% - Methodology 20% - Accuracy analysis 20% - Result analysis 20% 2) Deliverables: 40% - Final report 30% - Presentations 10%

Sequence of operation for the control system design Adiabatic humidifier CC HC SA OA mixing RA Define the sequence of operation for: WINTER operation and: - case when humidity is not controlled - case when humidity is precisely controlled Solution on the whiteboard

Economizer Fresh air volume flow rate control % fresh air TOA (hOA) enthalpy 100% Fresh (outdoor) air TOA (hOA) Minimum for ventilation damper mixing Recirc. air T & RH sensors

Economizer – cooling regime Example of SEQUENCE OF OERATIONS: If TOA < Tset-point open the fresh air damper the maximum position Then, if Tindoor air < Tset-point start closing the cooling coil valve If cooling coil valve is closed and T indoor air < Tset-point start closing the damper till you get T indoor air = T set-point Other variations are possible

Basic purpose of HVAC control Daily, weekly, and seasonal swings make HVAC control challenging Highly unsteady-state environment Provide balance of reasonable comfort at minimum cost and energy Two distinct actions: 1) Switching/Enabling: Manage availability of plant according to schedule using timers. 2) Regulation: Match plant capacity to demand

Terminology Sensor Controller Controlled device Measures quantity of interest Controller Interprets sensor data Controlled device Changes based on controller output Figure 2-13

Direct Indirect outdoor Closed Loop or Feedback Open Loop or Feedforward

Set Point Control Point Error or Offset Desired sensor value Current sensor value Error or Offset Difference between control point and set point

Two-Position Control Systems Used in small, relatively simple systems Controlled device is on or off It is a switch, not a valve Good for devices that change slowly

Anticipator can be used to shorten response time Control differential is also called deadband

Residential system - thermostat ~50 years old DDC thermostat Daily and weekly programming

Modulating Control Systems Example: Heat exchanger control Modulating (Analog) control air water Cooling coil x (set point temperature)

Modulating Control Systems Used in larger systems Output can be anywhere in operating range Three main types Proportional PI PID Position (x) fluid Electric (pneumatic) motor Vfluid = f(x) - linear or exponential function Volume flow rate

The PID control algorithm constants time e(t) – difference between set point and measured value Position (x) Proportional Integral Differential For our example of heating coil: Differential (how fast) Proportional (how much) Integral (for how long) Position of the valve

Proportional Controllers x is controller output A is controller output with no error (often A=0) Kis proportional gain constant e = is error (offset)

Unstable system Stable system

Issues with P Controllers Always have an offset But, require less tuning than other controllers Very appropriate for things that change slowly i.e. building internal temperature

Proportional + Integral (PI) K/Ti is integral gain If controller is tuned properly, offset is reduced to zero Figure 2-18a

Issues with PI Controllers Scheduling issues Require more tuning than for P But, no offset

Proportional + Integral + Derivative (PID) Improvement over PI because of faster response and less deviation from offset Increases rate of error correction as errors get larger But HVAC controlled devices are too slow responding Requires setting three different gains

Ref: Kreider and Rabl.Figure 12.5

The control in HVAC system – only PI Proportional Integral value Set point Proportional affect the slope Set point Integral affect the shape after the first “bump”

The Real World 50% of US buildings have control problems 90% tuning and optimization 10% faults 25% energy savings from correcting control problems Commissioning is critically important