DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
DataGrid is a project funded by the European Union 22 September 2003 – n° 1 EDG WP4 Fabric Management: Fabric Monitoring and Fault Tolerance
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
Workload Management Massimo Sgaravatto INFN Padova.
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
1 DataGRID Application Status and plans
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
EMI INFSO-RI EMI Quality Assurance Processes (PS ) Alberto Aimar (CERN) CERN IT-GT-SL Section Leader EMI SA2 QA Activity Leader.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
INFSO-RI Enabling Grids for E-sciencE The US Federation Miron Livny Computer Sciences Department University of Wisconsin – Madison.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
Yannick Patois – Datagrid Repository Presentation- 2001/11/21 - n° 1 Partner Logo DataGrid Software Repository presentation A short presentation of the.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
Grid Workload Management Massimo Sgaravatto INFN Padova.
CYBERINFRASTRUCTURE FOR THE GEOSCIENCES Data Replication Service Sandeep Chandra GEON Systems Group San Diego Supercomputer Center.
Training and the NGS Mike Mineter
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
Overall Goal of the Project  Develop full functionality of CMS Tier-2 centers  Embed the Tier-2 centers in the LHC-GRID  Provide well documented and.
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
Budapest, September 5th, 2002 DataGrid Accounting System DGAS Current status & plans Stefano Barale INFN Budapest, September.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
CEOS WGISS-21 CNES GRID related R&D activities Anne JEAN-ANTOINE PICCOLO CEOS WGISS-21 – Budapest – 2006, 8-12 May.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
SAN DIEGO SUPERCOMPUTER CENTER Inca TeraGrid Status Kate Ericson November 2, 2006.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
David Adams ATLAS DIAL/ADA JDL and catalogs David Adams BNL December 4, 2003 ATLAS software workshop Production session CERN.
OSG Integration Activity Report Rob Gardner Leigh Grundhoefer OSG Technical Meeting UCSD Dec 16, 2004.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
Software Release Procedure Session MANAGEMENT and FUTURE directions Form ongoing ‘empowered’ Technical Discussion Group (TDG) Any future project definitions(resources.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
EMI INFSO-RI Software Quality Assurance in EMI Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
Site Certification Process (Round Table) Fabio Hernandez IN2P3 Computing Center - Lyon October
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
CI R1 LCO Review Panel Preliminary Report. General Comments –Provide clear definition of the goals of the phase (e.g. inception), the scope, etc. in order.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL DOE/NSF Review of US LHC Software and Computing Fermilab Nov 29, 2001.
David Adams ATLAS ATLAS Distributed Analysis (ADA) David Adams BNL December 5, 2003 ATLAS software workshop CERN.
Tests at Saclay D. Calvet, A. Formica, Z. Georgette, I. Mandjavidze, P. Micout DAPNIA/SEDI, CEA Saclay Gif-sur-Yvette Cedex.
Site Authorization Service Local Resource Authorization Service (VOX Project) Vijay Sekhri Tanya Levshina Fermilab.
CERN Certification & Testing LCG Certification & Testing Team (C&T Team) Marco Serra - CERN / INFN Zdenek Sekera - CERN.
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
1 DIRAC Project Status A.Tsaregorodtsev, CPPM-IN2P3-CNRS, Marseille 10 March, DIRAC Developer meeting.
Workload Management Workpackage
Regional Operations Centres Core infrastructure Centres
Work Package 9 – EO Applications
DataGrid Quality Assurance
Ian Bird GDB Meeting CERN 9 September 2003
Testbed Software Test Plan Status
WP7 objectives, achievements and plans
Leigh Grundhoefer Indiana University
Report on GLUE activities 5th EU-DataGRID Conference
gLite The EGEE Middleware Distribution
Presentation transcript:

DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group

DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status 2 Outline Motivation and Goals Proposed Test Strategy –Scope –Organization Test Group sites –Participating sites and their resources –Domain of interest for every site Summary

DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status 3 Motivation and Goals DataGRID middleware is rapidly evolving –Complex software –Rich in functionality Stringent schedule of software release plan –Minor releases every two months –Next major release in October, 2002 Need for continuous test activity –Check for bug-fixes –Validate added new capabilities –Identify eventual « unexpected features » A well-defined systematic approach is necessary

DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status 4 Test Strategy: Scope Installation, configuration –Appreciate required effort, evaluate code portability Functionality and performance –Check conformance with the documentation –Derive performance figures, identify eventual bottlenecks Security –Trace for security holes in deployed external packages –Check for non-authenticated and unauthorized accesses, … Scalability, robustness, fault tolerance, error detection –Operate in distributed multi-user multi-site GRID environment –Operate at high loads, with malfunctioning services, … Provide feedback to WPs, give “green light” to Validation Team

DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status 5 Test Group Organization Test Strategy and Plan have been elaborated –See draft on EDMS repository Test Group people and resources –Small number of sites (5/6 in total?) –Resources should be decoupled from production Testbed –Close contact with IT and WP people Test Group activity –Follow layered structure of the DataGRID architecture Identify interdependency of services Determine validation tests for every service Develop test suites (automated if possible) –Deployment of every middleware release “tagged” by IT –Perform Tests on multi-site base Split responsibilities among the test sites

DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status 6 Pre-requisites for test activity Documentation (Administration and User Guide) –Download, installation, configuration, maintenance and tests Detailed description of system-level commands –User environment set-up and test Detailed description of user-level commands –Detailed description of available APIs Per-release updates –Clear definition of new functionality and services supported Test Group priorities –Functional tests and performance assessments Accurate documentation and definition of new supported functionality needs to be provided by WPs

DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status 7 Test Group Sites  Up to now this list includes only the sites that participated to the elaboration of the test plan IN2P3/LPC –18 PCs : MHz, MB memory, 200 GB disks IN2P3/CPPM and CS-SI –4 PCs: MHz, MB memory, GB disks CEA/Saclay –6 PCs: MHz, MB memory, GB disks New sites are invited to join the Test Group

DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status 8 Responsibilities Site NameDomain of Interest IN2P3/LPCStorage and Replica Catalog (Underlying Grid Services) BrokerInfo, RFIO, Replica Catalog APIs, Globus IN2P3/CPPM CS-SI Job Management, Authorization, Authentication and Accounting, Information and Monitoring UI, CA, GSI, VO, MDS CEA/SaclayJob Management, Grid Scheduler (spanning Application, Collective and Underlying Grid Services) RB, JSS, LB, JDL Test Group should cover all functionality of Testbed software

DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status 9 Conclusions Testbed Software Test Plan –A draft proposal for the Test Group organisation and activity is available on the WEB Observations and comments –Feedback from DataGrid collaboration is expected on the test strategy and on Test Group activities Any volunteers ? –Three participating sites up to now –Contribution from other interested sites is welcome –Test Group must cover all delivered services according to priorities that are being established –Some overlap in responsibilities is desirable