Operations Tandem ALPI PIAVE of LNL accelerators D. Carlucci 2012 August 6th Workshop on Accelerator Operations 1 WAO 2012 August 6, 2012 Davide Carlucci.

Slides:



Advertisements
Similar presentations
Radiation tests in Padova
Advertisements

Improved on line performance of the installed ALPI Nb sputtered QWRs A.M. Porcellato, S. Stark, F. Stivanello, L. Boscagli F. Chiurlotto, D. Giora, M.
Operation of the ATLAS Superconducting Accelerator for Heavy Ions Matthew Hendricks ATLAS Operations Supervisor October 27, 2014.
Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 1 G.Penco, M.Svandrlik Operation Uptime Maintenance Performance vs filling.
Cross section measurements at LNL M.Mezzetto (INFN-Pd) on behalf of INFN-LNL: M. Cinausero, G. De Angelis,G. Prete.
1 Nb Sputtered Cu QWR: a 20 years experience from an idea to the routine beam acceleration A.M. Porcellato S. Stark V. Palmieri F. Stivanello.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
HEAD START…. New Start… O r i e n t a t i o n Introductions Goals –Conducting New Hire Orientation –Objectives of this workshop Define Orientation Negative.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Operational Demands of ReA3 at NSCL “Adapting to Change” WAO 2012, Stanford University Jon Bonofiglio August, 7 th, 2012.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
E. Fioretto Joint EURISOL-EURONS Town meeting Helsinki, INFN-LNL, Legnaro (Padova), Italy INFN-LNS, Catania, Italy Transnational Access to LNL-LNS.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
Universities meet Laboratories: situation in Italy M. Migliorati.
ESS The INFN in-kind contribution to the accelerator of the European Spallation Source.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Recruiting and retaining qualified staff at Statistics Finland Recruiting and retaining qualified staff at Statistics Finland Elina Pääkkö Workshop on.
ESS Vacuum Standardization
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
Operation Status of the RF Systems and Taiwan Photon Source
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Report Technical Director Storage-Ring-Installation Completed
Preparation Phase of the FAIR Project
Design of a General Purpose I/O Controller for Particle Accelerators
Bunching system for SPES project
Status of HESR 18th March Gießen Dieter Prasuhn.
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Acceleration of RIB using linacs
SPES-RFQ review Introduction, general aspects
Operation Progress and Upgrade in SSRF
WELCOME TO HIRA TRAINING.
Compact linear accelerator FLUTE: status update
Operations/Control room organization during commissioning
Summary of Washington DOE Review
Upgraded Injector Test Facility
The SPL-based Proton Driver at CERN
Status of the JLEIC Injector Linac Design
Presentation transcript:

Operations Tandem ALPI PIAVE of LNL accelerators D. Carlucci 2012 August 6th Workshop on Accelerator Operations 1 WAO 2012 August 6, 2012 Davide Carlucci Tandem-ALPI-PIAVE complex Operation Supervisor & Maintenance Leader I.N.F.N. - Laboratorni Nazionali di Legnaro

Outline Introduction to LNL What is Operations responsible for at Tandem ALPI PIAVE Example of Shift + maintenance ( 1 week) Accelerator operator a lifetime career or a stepping- stone into your organization? How long does an operator have to stay in Operations to get your money’s worth? How do you work on team building, motivation, career ownership, and challenge the operators? Summary D. Carlucci 2012 August 6thWorkshop on Accelerator Operations2

LNL - INFN - Identity Card D. Carlucci 2012 August 6th Workshop on Accelerator Operations 3 CORE RESEARCH ACTIVITIES Nuclear Structure and Dynamics Applications and Interdisciplinary use of ion beams and nuclear techniques and methods MULTI TASK MULTI DISCIPLINARY But mainly Nuclear Physics Based User Oriented Laboratories Staff 118 people

Accelerator Division D. Carlucci 2012 August 6th Workshop on Accelerator Operations 4 Head Accelerator Division Accelera tor RF & Vacuum Beam Dynamics Ion Sources Small Accelera tor Operations of Tandem ALPI PIAVE 3 people 4 people 3 people 6 people 13 people Research & Develop ment 4 people Secretary We are 41 people + 7 PhD, in Total we are 48 People

1 Physicist 1 Physicist a 1 Senior Electrotecnical Engineer1 Senior Electrotecnical Engineer b 11 Operators11 Operators c The Operations Group of Tandem ALPI PIAVE D. Carlucci 2012 August 6th Workshop on Accelerator Operations 5 Plus me, we are:

Laboratori Nazionali di Legnaro D. Carlucci 2012 August 6th Workshop on Accelerator Operations 6 Tandem-ALPI-PIAVE complex my office CN accelerator AN2000 accelerator Main Gate

XTU-Tandem accelerator D. Carlucci 2012 August 6th Workshop on Accelerator Operations Beam injected to the super conducting LINAC Beam to the experimental halls 1 & 2

77 Super Conducting Quarter Wave Resonators (Nb, Nb/cu) ryostats In 20 Cryostats V eq ~ 48 MV ALPI (Superconducting Linear Accelerator) D. Carlucci 2012 August 6thWorkshop on Accelerator Operations8 20 Full Nb, 80 MHz Low β Ea 6MV/m 57 Nb /Cu, 160 MHz Medium β Ea 5MV/m

Tandem-ALPI-PIAVE complex D. Carlucci 2012 August 6th Workshop on Accelerator Operations 9 PIAVEPIAVE 1 & 2 Exp. Halls XTU Tandem ALPIALPI 3 Exp. Hall Control room Here is displayed the PIAVE- Tandem-ALPI complex, the beams being injected by the XTU Tandem into the three experimental Halls, or in to the superconductive LINAC and then distributed to three experimental halls, two of them are shown.

Main device in the Tandem ALPI PIAVE 140 Power supply for quadrupole and Dipole, QWR s (coupler, tuning system, pick-up ecc ecc) 1 Plant for SF6 trasfer (2 compressor) 780 m³at 7 bar 40 Steerer 40 Power supply for steerer 120 Rf Amplifier 1 Corona Sistem 30 Step-Motor controller 50 Beam Monitor Profile 50 Faraday Cup 30 Slits sistem 90 Air compressor distribution 250 Valve 1 GVM sistem, Ecc ecc. D. Carlucci 2012 August 6thWorkshop on Accelerator Operations10 1 Voltage divider 2500 Resistors 1 Laddertron (1300 Link, ecc) 765 m³ of SF6 at 7 Bar 2 Compressor and the regeneration system for the transfer of the SF Spark gap 3 Ion pump ( in the HV terminal ) 9 Power supply ( in the HVterminal ) 10 Controll Variac ( in the HV terminal ) 1 Electostatic Lens( in the HV terminal ) 1200 Resistors support 1 Dillon Cell 4 Dew Point meter system for SF6 8 Cable for the CC ( in HV) for each of 8 section of the machine 4 pick-up wheel Ecc ecc.

Ion Sources (negative & positive) & vacuum systemsIon Sources (negative & positive) & vacuum systems 1 Cryogenic Plant (He-Cold- box) & Cryostats maintenanceCryogenic Plant (He-Cold- box) & Cryostats maintenance 2 Controls systems managment & maintenanceControls systems managment & maintenance 3 The Operations group is in charge of managing the tuning, beam delivery, and maintenance of Tandem ALPI PIAVE D. Carlucci 2012 August 6th Workshop on Accelerator Operations 11 We are not operating:

Year 2011 D. Carlucci 2012 August 6th Workshop on Accelerator Operations 12

1 Woman 1 Woman a 10 Men10 Men b (10 Technichans & 1 Engineer)(10 Technichans & 1 Engineer) TOTAL The 11 Operators are on shift for 9 months/year and are: D. Carlucci 2012 August 6th Workshop on Accelerator Operations 13

34 year 34 year From 52 year 52 year to 45 year 45 year Average The Age of the Operators at LNL is: D. Carlucci 2012 August 6th Workshop on Accelerator Operations 14

Week Shift + maintenance example D. Carlucci 2012 August 6th Workshop on Accelerator Operations 15 Shift - Time MondayTuesdayWednesdayThursdayFridaySaturdaySunday 07:00 – 15:00 A B G H L M E I C F A D G B 15:00 – 23:00 C D A B G H L M E I C F A D 23:00 – 07:00 E F C D A B G H L M E I C F Maintenance 07:00 – 15:00 H F 15:00 – 23:00 L I D Day Maintenance 08:30 – 16:42 L I D B Each operator work for 36h (average) each weak

We have the same staffing as 25 years ago, but 3 more accelerators (1 in progress) In LNL We have the minimum people we need In LNL Usually for the operator is life-time career So Accelerator operator a lifetime career or a stepping-stone into your organization? D. Carlucci 2012 August 6th Workshop on Accelerator Operations 16

How long does an operator stay in Operations? D. Carlucci 2012 August 6th Workshop on Accelerator Operations 17 Depends on the Laboratory policy (no new hires are approved)Depends on the Laboratory policy (no new hires are approved) a Depends on the work load (too much work - people want to leave)Depends on the work load (too much work - people want to leave) b

No less than 5 years a The right solution would be between 5 and 15 years b How long does an operator have to stay in Operations to get your money’s worth? D. Carlucci 2012 August 6th Workshop on Accelerator Operations 18

What’s your definition of a “good operator”? D. Carlucci 2012 August 6th Workshop on Accelerator Operations 19 Safety Working in groups Autonomy Constructive Purposeful Alone in the control room is able to deliver beam safely, for himself and for all the people in all the laboratory

D. Carlucci 2012 August 6th Workshop on Accelerator Operations 20 How do you work on team building, motivation, career ownership, and challenge the operators? Present operators with a role model (personal example)Present operators with a role model (personal example) 1 Match job with skillsMatch job with skills 2 No favours, impartial and fair to allNo favours, impartial and fair to all 3

Time Competence Level Training Work planning objectives How do you work on team building, motivation, career ownership, and challenge the operators? Who does what, taking into account the skills Who does what, taking into account the skills D. Carlucci 2012 August 6th Workshop on Accelerator Operations 21

Who does What ResponsableInfo about the contact Power RF Insulating gas D. Carlucci 2012 August 6th Workshop on Accelerator Operations 22

Summary This presentation, it is not a lesson of Physics or Organizing, but: Just my experience D. Carlucci 2012 August 6th Workshop on Accelerator Operations 23

Thank you for your attention D. Carlucci 2012 August 6th Workshop on Accelerator Operations 24 I just inform you about next SNEAP 30th Septembar 05th October 2012 in Legnaro (PD) ITALY (Symposium for North Eastern Accelerator Personnel ) SNEAP is a community of personnel involved with particle accelerators, mainly electrostatic, and their use. )