Project X Overview L. Prost (for the Project X team) FNAL Accelerator Physics forum CERN June 17, 2013 Many slides taken from V. Lebedev, S. Nagaitsev,

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Project X – MAP Task Force Keith Gollwitzer Accelerator Division Fermilab Project X Collaboration Meeting Oct 25, 2011.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Project X Update Steve Holmes SPAFOA Meeting November 13, 2012
Project X: Staging and Development Strategy Steve Holmes Fermilab PAC June 20, 2012.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Staging Opportunities for Project X Steve Holmes on behalf of the PX Team Accelerator Physics and Technology Seminar May 8, 2012.
Alexander Aleksandrov Oak Ridge National Laboratory
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
MegaWatt Proton Beams for Particle Physics at Fermilab Steve Holmes P5 Meeting/BNL December 16, 2013 projectx-docdb.fnal.gov/cgi-bin/ShowDocument?docid=1232.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
PIP-II: Goals, Strategy, and Status Paul Derwent 26 February, 2015.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Project X goals and organization Sergei Nagaitsev October 4, 2011.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
Risk Elements Marc Kaducak Project X Machine Advisory Committee March 18-19, 2013.
PXIE Medium Energy Beam Transport status What has happened since the April’12 collaboration meeting A. Shemyakin Project X collaboration meeting November.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
UK Neutrino Factory Conceptual Design
General Design of C-ADS Accelerator Physics
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Progress in the Multi-Ion Injector Linac Design
Physics design on Injector-1 RFQ
1- Short pulse neutron source
Superbeams with SPL at CERN
Electron Source Configuration
Pulsed Ion Linac for EIC
Physics Design on Injector I
The SPL-based Proton Driver at CERN
Multi-Ion Injector Linac Design – Progress Summary
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Project X Overview L. Prost (for the Project X team) FNAL Accelerator Physics forum CERN June 17, 2013 Many slides taken from V. Lebedev, S. Nagaitsev, S. Holmes and A. Shemyakin former presentations

Outline 2 Project X Facility Goals Reference Design Staging Strategy R&D Program –Project X Injector Experiment Our websites: L. Prost, Project X Overview, CERN Accelerator Physics forum

What is Project X? The opportunity to construct and operate the foremost Intensity Frontier facility in the world: multi-MW proton beams available at energies ranging from 1 – 120 GeV Unique ability to provide high beam power, high duty factor, independent beam formats to multiple experiments simultaneously Capitalizing on the rapid development of superconducting rf technology Undertaken by an international collaboration 3L. Prost, Project X Overview, CERN Accelerator Physics forum

The Landscape M Seidel, PSI Project-X 4L. Prost, Project X Overview, CERN Accelerator Physics forum

Facility Goals A neutrino beam for long baseline neutrino oscillation experiments –2 MW proton source at GeV MW-class low energy proton beams for kaon, muon, neutrino, and nuclei/ nucleon based precision experiments –Operations simultaneous with the neutrino program A path toward a muon source for possible future Neutrino Factory and/or a Muon Collider Possible missions beyond particle physics –Energy and materials applications 5L. Prost, Project X Overview, CERN Accelerator Physics forum

Project X Schematic MW 1 GeV ~5 % duty cycle L. Prost, Project X Overview, CERN Accelerator Physics forum

Performance Goals 7L. Prost, Project X Overview, CERN Accelerator Physics forum

Beam(s) Structure Bunch-by-bunch beam chopping and RF separation after acceleration are two corner stones of the project –Each experiment can receive its desired bunch structure 8L. Prost, Project X Overview, CERN Accelerator Physics forum

Linac technology map “Standard” scheme for beam acceleration is used –Except for acceleration in SRF from low energies 9 SectionFreqEnergy (MeV)Cav/mag/CMType RFQ HWR (  G =0.1) /8/1HWR, solenoid SSR1 (  G =0.22) /8/ 2SSR, solenoid SSR2 (  G =0.51) /21/7SSR, solenoid LB 650 (  G =0.61) /20/55-cell elliptical, doublet HB 650 (  G =0.9) /16/75-cell elliptical, doublet HB 650 (  G =0.9) /30/155-cell elliptical, doublet ILC 1.3 (  G =1.0) /28 /289-cell elliptical, quad L. Prost, Project X Overview, CERN Accelerator Physics forum

Choice of Main Parameters Bunch repetition rate of MHz is set by RFQ –Sub-harmonic of the ILC frequency –The fastest rate compatible with bunch-by-bunch chopping Beam energies are determined by experimental program –1 GeV – nuclear physics, nuclear energy and  -to-e –3 GeV – kaon and muon experiments Beam current –5 mA from the ion source Bunch-by-bunch chopping allows to create desired bunch patterns and powers for all experiments –2 mA in 1 GeV linac Then the current is equally split between 1 & 3 GeV experiments –1 mA in 3 GeV linac delivers 3 MW to 3 GeV 10L. Prost, Project X Overview, CERN Accelerator Physics forum

CW Linac – Beam Dynamics Lattice design & beam dynamics optimization are made utilizing the TRACK, TraceWin and GenLinWin codes. 11 Rms bunch length Transverse x- and y– rms envelopes 1 GeV arc is presented as a short drift. L. Prost, Project X Overview, CERN Accelerator Physics forum

Emittance growth in CW Linac Emittance growth is within Project X specifications 12  n  (magenta) and  nL (green) rms emittances along the linac Only the 1 GeV part of CW linac is shown Initial longitudinal emittance corresponds to 1.6 keV*nsec L. Prost, Project X Overview, CERN Accelerator Physics forum

Particle Loss in SC linac Intrabeam stripping is the major mechanism resulting in the beam loss 13 Aperture and Particle density distribution along the linac 100,000 particles tracked in PARTRAN Beam power losses per unit length L. Prost, Project X Overview, CERN Accelerator Physics forum

Staging Fiscal considerations/constraints have motivated development of a staging plan Staging principles: –Compelling physics opportunities at each stage –Cost of each stage substantially <$1B –Utilize existing infrastructure to the extent possible at each stage –Minimize interruptions to the ongoing program at each stage –Achieve full Reference Design capabilities at end of final stage Three stage plan developed and presented to DOE/OHEP Reference Design siting plan developed consistent with staging 14L. Prost, Project X Overview, CERN Accelerator Physics forum

Staging Site Plan Page 15L. Prost, Project X Overview, CERN Accelerator Physics forum

Linac Beam (Stage 1) In Stage 1: the Booster injection is 1-ms long (flattop) at 15 Hz 16 ->66.7 ms Time, ms 0 1 Linac beam current, mA To BoosterTo 1-GeV program Pulsed dipole OFF ON L. Prost, Project X Overview, CERN Accelerator Physics forum

1-GeV CW linac in Stage 1 Ion source operates at ~3.6 mA Chopper removes unwanted bunches to make ave. beam current 1 mA Bunches are rf-split between the muon and “nuclear” programs 17L. Prost, Project X Overview, CERN Accelerator Physics forum

Linac Beam (Stage 2) In Stage 2: The 1-GeV linac rf power is upgraded to 2-mA The Booster injection: ~0.5-ms long (flattop) at 15 Hz 18 ->66.7 ms Time, ms 0 2 MEBT beam current, mA To Booster To 1-GeV program (1 mA) and 3-GeV program (1 mA) Pulsed dipole OFF ON L. Prost, Project X Overview, CERN Accelerator Physics forum

Stage-2 CW linac Ion source at 5 mA 2-mA beam up to 1 GeV RF bunch splitter at 1 GeV 19 To 1-GeV Experimental Area To 1-GeV Arc and 3-GeV linac L. Prost, Project X Overview, CERN Accelerator Physics forum

Linac Beam (Stage 3) In Stage 3: The 3-8 GeV linac is added to inject into the Recycler The Recycler injection is ~4.4-ms long (flattop) at 10 Hz 20 ->100 ms Time, ms 0 2 MEBT beam current, mA To Pulsed Linac To 1-GeV program (1 mA) and 3-GeV program (1 mA) Pulsed dipole OFF ON L. Prost, Project X Overview, CERN Accelerator Physics forum

R&D Program Goal is to be prepared for a construction start in Q1FY18 –Most likely, Stage 1 Goal of the R&D Program is to mitigate risk: technical/cost/schedule The unique capabilities of Project X depend (almost) entirely on the front end, in particular the wideband chopper. Technical Risks –Front End CW ion source through SSR1 –H - injection system Booster in Stage 1, 2; Recycler in Stage 3 –High Intensity Recycler/Main Injector operations –High Power targets Cost Risks –Superconducting rf Cavities, cryomodules, rf sources – CW to long-pulse 21 Project X Injector Experiment (PXIE) L. Prost, Project X Overview, CERN Accelerator Physics forum

We are building an integrated systems test of the first ~30 MeV of Project X. –Validate the concept for the Project X front end –Demonstrate wideband chopper; low-  acceleration –Operate at full design parameters Integrated systems test goals: –1 mA average current with 80% chopping of beam delivered from RFQ –Efficient acceleration with minimal emittance dilution through ~30 MeV Front-End R&D Program (as proposed in Oct 2011) Page 22 Beam through  =0.1, 0.2 CM at ~30 MeV with nearly final parameters (1 mA cw, 5 mA peak, arbitrary bunch chopping) L. Prost, Project X Overview, CERN Accelerator Physics forum

PXIE structure Standard scheme for proton (H - ) acceleration –Ion source and LEBT (30 keV, 5 mA nominal/ 10 mA max DC) Beam pre-chopping for machine tuning –162.5 MHz RFQ (2.1 MeV, 5/10 mA CW) –MEBT (chopping, 5mA CW->1mA Repetitive Structure ) –2 SC cryomodules accelerating the beam to MeV –HEBT (beam diagnostics) –50 kW beam dump Total length ~ 40 m Collaboration between Fermilab, ANL, LBNL, SNS, SLAC, and Indian institutions 23L. Prost, Project X Overview, CERN Accelerator Physics forum

PXIE Goals The main specific goals –Demonstrate the bunch-by-bunch chopping Kicker and absorber –Efficient acceleration of 1mA beam in SRF to at least 15 MeV Emittance dilution; halo generation and management Also, address –Emittance issues and pre-chopping in LEBT –Reliable CW RFQ –MEBT/SRF interface (vacuum, microparticle migration) –Diagnostics for testing the extinction of the removed bunches to ~10 -9 –Gain experience in design and operation of SC cryomodules SSR1 cryomodule will be designed and built by Fermilab 24L. Prost, Project X Overview, CERN Accelerator Physics forum

PXIE layout m PXIE Cryomodule test stand Cryoplant PXIE will be assembled in the existing Cryo Module Test Facility building L. Prost, Project X Overview, CERN Accelerator Physics forum

Ion source H - ion source –Purchased from D-Pace Inc. –Was tested and used at LBNL for a year Now at Fermilab kV, 15 mA DC, ε rms,n_x  0.12µm Life time 300 hrs Ground electrode Port for turbo pump L. Prost, Project X Overview, CERN Accelerator Physics forum

LEBT 27 LEBT –3 solenoids –Dipole to accommodate two IS for PX Only one at PXIE –Chopper Pre-chopping, MPS, pulse mode –Possibility of partially un-neutralized transport –Beam halo scraping 3D model of the first, straight stage of LEBT L. Prost, Project X Overview, CERN Accelerator Physics forum

RFQ Design (LBNL): 4 vanes CW RFQ –162.5 MHz frequency to make bunch-by-bunch chopping possible –2.1 MeV energy to exclude residual radiation in the MEBT 28 Beam current: 1 – 10 mA; ε  n,rms < 0.25 µm ε ||n,rms ≤1.0 keV-ns Length: ~4.4 m –Simulations completed RF, beam, thermal, stress –Finalizing the production drawings –Manufacturing tests RF coupler has been designed L. Prost, Project X Overview, CERN Accelerator Physics forum

MEBT Transverse focusing – 9 quadrupole doublets/triplets –Small β-function variation –Quads/dipole correctors are being designed by BARC, India Longitudinal focusing – 3 bunching cavities –Production drawings preparation 29 MEBT sections and optics. 3σ envelopes of passing bunches – thin lines, removed bunches- thick lines. Red squares- quads, blue – bunching cavities. Frequency MHz Max voltage 100 kV Gap 2x23 mm Max power loss 1.5 kW Design: I. Terechkine et al. L. Prost, Project X Overview, CERN Accelerator Physics forum

Chopping system Undesired bunches are removed by the MEBT chopper –Two kickers separated by 180º and working in sync (next slide) –Removed and passing bunches are separated at the absorber by 6σ y –Large gas load from absorber, ~1 mTorr·l/s 2500 l/s turbo pumping at the absorber and differential pumping Developed a concept of a 21 kW absorber (x2 full nominal power) –29 mrad incident angle –Mo alloy TZM –Testing ¼ size prototype with e-beam 30 Two kickers separated by 180º Absorber Differential pumping L. Prost, Project X Overview, CERN Accelerator Physics forum

Kicker Travelling – wave, broadband kickers: 50 and 200 Ohm versions –0.5m, ±250V on each plate, 16mm gap; 6σ beam length is 1.3 ns Ohm –25 electrodes per plate connected in vacuum by cables Finalizing the production drawings –Commercial linear amplifier and pre- distortion Lower power driver successfully tested 200 Ohm –Helix as travelling-wave structure RF simulations, modeling, concept development 3D model A.Chen, D.Sun RF model G. Saewert –Driver: broadband, DC coupled switches in push- pull configuration Fermilab development Single switch: tested to 0-500V Complete driver: tested to V L. Prost, Project X Overview, CERN Accelerator Physics forum

SRF cryomodules Two cryomodules operating at 2K, HWR and SSR1 –Half Wave Resonators (HWR) and Single Spoke Resonators (SSR1) –Warm gap between cryomodules; fast vacuum valves on both sides In both cryomodules –Solenoidal focusing No magnetic steel; backing coil to reduce fringe field –BPM and dipole correctors in each solenoid Structure of HWR cryomodule –8 cavities, 8 solenoids arranged as 8x ( S C ) –Starts with a solenoid to mitigate H 2 influx from MEBT Structure of SSR1 cryomodule –8 cavities, 4 solenoids arranged as 4x ( C S C ) –Separated coils of dipole correctors allow creating of skew-quads –The first upstream element is a cavity to improve longitudinal dynamics 32 Warm transition box between CMs L. Prost, Project X Overview, CERN Accelerator Physics forum

HWR –Cavity and cryomodule design is complete –Prototypes of 10-kW RF coupler and SC solenoid with steering coils have been built and successfully tested –BPM prototype has been built and will be tested with beam in FY13 –Nb parts for all cavities will be fabricated in FY13 –Two prototype SC cavities will be tested in FY14 33 Beam energy: MeV Frequency MHz CM length (flange-to- flange): 5.9 m β g 0.11 Cavity voltage 1.7 MV Design and production by Argonne National Lab Solenoid installed in He vessel Cavity with coupler BPM parts Cavity parts L. Prost, Project X Overview, CERN Accelerator Physics forum

SSR1 –Design of major components is complete Cavity, tuner, coupler, solenoid, current leads, helium vessel, support –Design of cryomodule to be complete in Fall 2013 –First production batch of 10 cavities is complete Tests proceed well Prototypes of coupler, solenoid, and helium vessel are close to production 34 Beam energy: MeV Frequency 325 MHz CM length (flange-to- flange): 5.4 m β g 0.22 Cavity voltage 2 MV 3D model of cavity with tuners L. Prost, Project X Overview, CERN Accelerator Physics forum

HEBT 35 D. Johnson Functions: –Primary 50 kW beam dump –Instrumentation to characterize beam parameters and measure efficiency of MEBT bunch-by- bunch chopper Status: –Preliminary design of optics, absorber, and shielding complete –deflecting cavity is being designed –Instrumentation specifications in progress L. Prost, Project X Overview, CERN Accelerator Physics forum

Plans FY2013 – beam from ion source (at Fermilab) FY2015 – beam from RFQ FY2017 – Stage 1 –Ion source, LEBT, RFQ at full power –Full MEBT with prototype kickers, prototype absorber, temporary dump, bunchers, some diagnostics –Cryo system –SSR1 CM – cold and RF powered, no beam Aug Stage 2 –HWR CM – cold and RF powered, no beam Aug Stage 3 –HEBT, final MEBT kickers, final 50 kW beam dump, 1-mA beam with required structure delivered to the dump 36L. Prost, Project X Overview, CERN Accelerator Physics forum

Backup Slides

Reference Design A complete design concept exists (Reference Design Report) 3 GeV CW superconducting H - linac with 1 mA average beam current. –Enhanced performance of the existing proton complex –Spallation-based program (nucleon/energy applications) at 1 GeV (1 MW) –Rare processes programs at 3 GeV (3 MW) –Flexible provision for variable beam structures to multiple users 3-8 GeV pulsed linac capable of delivering 340 kW at 8 GeV –Enhanced performance for short and long-baseline neutrino programs –Establishes a path toward a muon-based facility Upgrades to the Recycler and Main Injector to provide ≥ 2 MW to the neutrino production target at GeV.  Utilization of a CW linac creates a facility that is unique in the world, with performance that cannot be matched in a circular accelerator based facility. 38L. Prost, Project X Overview, CERN Accelerator Physics forum

Reference Design Performance Goals Linac Particle TypeH - Beam Kinetic Energy3.0GeV Average Beam Current1mA Linac pulse rateCW Beam Power to 1 GeV program1000kW Beam Power to 3 GeV program2870kW Pulsed Linac Particle TypeH - Beam Kinetic Energy8.0GeV Pulse rate10Hz Pulse Width4.3msec Cycles to Recycler/MI6 Particles per cycle to Recycler/MI 2.7  Beam Power340kW Beam Power to 8 GeV program170kW Main Injector/Recycler Beam Kinetic Energy (maximum)120GeV Cycle time1.2sec Particles per cycle1.5  Beam Power at 120 GeV2400kW 39 simultaneous L. Prost, Project X Overview, CERN Accelerator Physics forum

40 Choice of Main Parameters Bunch repletion rate of MHz is set by RFQ –Sub-harmonic of the ILC frequency –The fastest rate compatible with bunch-by-bunch chopping Beam current –0-10 mA from the ion source Bunch-by-bunch chopping allows to create desired bunch patterns and beam powers for all experiments –2 mA up to 1 GeV Then the current is equally split between 1 & 3 GeV experiments –1 mA in 1 to 3 GeV linac (delivers 3 MW to 3 GeV) L. Prost, Project X Overview, CERN Accelerator Physics forum

Project X and PXIE Project X is an Intensity Frontier accelerator providing MW-scale proton beam to many users quasi- simultaneously –Acceleration in SRF from low energies 41 –Constant power in time scale >µs; adjustable structure of the bunch train –Accomplished by bunch-by-bunch chopping in MEBT and RF separation after acceleration to the required energy Addressed by the Project X Injector Experiment, PXIE L. Prost, Project X Overview, CERN Accelerator Physics forum