PDS M/C August 2012 PPI Node Report PDS Management Council August 28-29, 2012 R. J. Walker S. P. Joy T.A. King J. Mafi.

Slides:



Advertisements
Similar presentations
1 External Review Results November 30, 2011 Reta Beebe.
Advertisements

Navigation and Ancillary Information Facility NIF The NAIF Node PDSMC Report Addresses both NAIF Node and Core SPICE Development August 23, 2011 Chuck.
LADEE PDS4 Experience G. Delory LADEE Instrument and PDS Teams LADEE SOC PDS Management Council Nov /19/2014 LADEE PDS4 Experience 1.
How To Get MESSENGER MASCS VIRS Data from the Planetary Data System PDS Geosciences Node For the MASCS VIRS Workshop Lunar and Planetary Science Conference,
PPI Node Report Raymond J. Walker Steven P. Joy Todd A. King PDS Management Council March 25, 2010.
March 2010 PDS Imaging Node 1 NASA PDS Imaging Node: NASA PDS Imaging Node: Digital Data Archives and Distribution Archiving and distributing data and.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
PDS Radio Science Dick Simpson Stanford University Overview Activities MC Support PDS-Internal Support (PDS4) Mission Support Node and User Support Local.
PDS Radio Science Dick Simpson Stanford University Stanford Status PDS4 Status at Stanford o Testing o Mission Support o Migration Proposal o Tools o Issues.
InSight Archive Status Ed Guinness and Susie Slavney PDS Geosciences Node PDS Management Council Berkeley, California November 18-19, 2014.
IPDA Assessment Results Build 1c Steve Hughes August 2011.
Navigation and Ancillary Information Facility NIF NAIF Node Report Addresses both NAIF Node and SPICE Development PDSMC March 27, 2012 SPICE components.
PDS4 Project Lifecycle Support for LADEE, MAVEN April 3, 2013.
PDSMC November 29-30, PDS Imaging Node PDS4 Migration Lisa Gaddis (USGS) Sue LaVoie (JPL) November 30, 2012 PDS Management Council Meeting UCLA.
PDS 2010 Project Update Dan Crichton MC Face-to-Face Washington DC March 25-26, 2010.
Geosciences Node Ed Guinness MC Face-to-Face Meeting Washington, DC March 27-28, 2012.
Search Update April 1-3, 2009 Joshua Ganderson Laura Baalman.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Rings Node Migration Plan Mark & Mitch PDSMC, UCLA November 28-29, 2012.
PDS4 Tool Development Strategy PDS Management Council Meeting November 18, 2014 Dan Crichton.
PDS4 and Build 5a Update Dan Crichton, Emily Law November
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
PDS4 Project Report PDS MC F2F Columbia, MD Dan Crichton April 2-3,
Atmospheres Node Report Reta Beebe Nancy Chanover Lyle Huber Lynn Neakrase Jim Murphy Irma Trejo Matias Roybal Shannon Rees.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
Data Standards and Build 3b Plans Steve Hughes MC Face-to-Face UCLA, Los Angeles, CA November 28-29, 2012.
PDS4 Project Update PDS MC F2F Flagstaff, AZ Dan Crichton August 22,
National Aeronautics and Space Administration Usability Project Update Mark Rose Intelligent Systems Group NASA Ames Research Center.
Geometry Project Ed Guinness MC Face-to-Face Meeting UCLA November 28-29, 2012.
System Design and Deployment Status PDS Management Council Face-to-Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman.
AMMOS-PDS Pipeline Service (APPS) NASA-Planetary Data System Management Council Meeting Berkeley, CA November 18, 2014 Costin Radulescu *, Steve Spohn.
PDS4 User Beta Testing Mars Phoenix Website Lynn D. V. Neakrase Atmospheres Node Management Council Meeting, UCLA November 2012.
PDS Atmospheres Node Plans for PDS4 User Roll-out 8/28/12PDS4 Roll-outStatus 1 Reta Beebe Lyle Huber Lynn Neakrase Jim Murphy Nancy Chanover Joni Johnson.
PDS M/C November 2012 PPI Data Migration Planning PPI PDS4 Data Migration Planning PDS Management Council November 28, 2012 T. King.
Operations Report PDS Management Council Meeting Flagstaff, Arizona August 2006
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
PPI Node R.J. Walker, T.A. King, S.P. Joy, J.N. Mafi MC Face-to-Face Meeting Westwood, California 26 August 2014.
PDS Geosciences Node Page 1 Archive Status MRO and Phoenix Ed Guinness PDS Management Council August 13, 2007 Ed Guinness.
PDS Geosciences Node Page 1 Archiving LCROSS Ground Observation Data in the Planetary Data System Edward Guinness and Susan Slavney PDS Geosciences Node.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
Development Report Engineering Node August 2006
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
PDS4 Mission Needs Assessment Reta Beebe Dan Crichton.
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
Small Bodies Node Ludmilla Kolokolova Carol Neese, Mike A’Hearn, Anne Raugh MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
Physical Media WG Update November 30, Fall 2006 WG Status Initial technology plan Use Cases Decision Matrix Media Testing NMSU Website Physical.
PDS4 Demonstration Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
Small Bodies Node Report Michael F. A’Hearn, Donald R. Davis, Ludmilla Kolokolova, & Carol Neese 28/8/12PDS Management Councilmfa 1.
MAVEN Archive Overview J. Mafi PDSMC Face-to-Face Berkeley, California 18 November 2014.
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
Status Reports: Messenger and Dawn S. Joy. MESSENGER It has been previously reported that the MESSENGER project did not plan on archiving any data EXCEPT.
PDS M/C November 2012 PPI MAVEN Report PDS4 Mission Report: MAVEN PDS Management Council November 28, 2012 J. Mafi.
Tools Report Engineering Node March 2007
Radio Science PDS Function Report 25 March 2010 Dick Simpson Stanford University.
PDS4 Deployment Planning (Discussion) PDS MC F2F Columbia, Maryland Dan Crichton August 28,
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Mars Atmosphere and Volatile Evolution mission MAVEN The mission’s goal is to explore the planet’s upper atmosphere, ionosphere, and interactions with.
IPDA PDS4 Report July 17, PDS4: The Next Generation PDS PDS4 is a PDS-wide project to upgrade from PDS version 3 to version 4 to address many.
NASA PLANETARY DATA SYSTEM ARCHIVING IPDA Steering Committee Reta Beebe, Dan Crichton Paris, France July
April 2, 2009PDS Management Council - PPI Node1 Planetary Plasma Interactions Node PDS Management Council Presentation April 2, 2009 Raymond Walker Steven.
IPDA Registry Definitions Project Dan Crichton Pedro Osuna Alain Sarkissian.
Tools Report Engineering Node August 2007
Todd King James Thieman D. Aaron Roberts SPASE Consortium SPASE – An Introduction Standard Metadata and Open Sharing.
Working with MAVEN Data
PDS4 Update Dan Crichton August 2014.
PDS 2010 Project Overview: Description, Plans and Status
IPDA PDS4 Report PDS Team July 2015.
Atmospheres Node Report
Helping Active Missions Convert to PDS4
Presentation transcript:

PDS M/C August 2012 PPI Node Report PDS Management Council August 28-29, 2012 R. J. Walker S. P. Joy T.A. King J. Mafi

PDS M/C August 2012 PPI Node Report PPI Overview Activities – Data deliveries running smoothly. PDS4 Testing – Very productive and useful. PDS4 Data Migration Plan – Progressing and nearly ready for first phase. PDS4 Tools – Some ready, some needed. PDS4 First Mission – MAVEN 1

PDS M/C August 2012 PPI Node Report Activities Missions Active Pipeline:Messenger, Cassini, LRO, MEX SIS:Juno Peer Review:Dawn, MSL Cruise:New Horizons Assist: Rosetta Baseline PDS4 – Design and Tool Dev. (level of effort equal to an large mission) Archive maintenance Web enhancements Pre-Launch SIS:MAVEN Restoration Pipeline:MGS, Voyager Prelim:Kaguya Issues A few Nothing higher than yellow All manageable 2

PDS M/C August 2012 PPI Node Report PDS4 Testing Selected representative data from our PDS3 archive. – Cassini RPWS (calibrated) Created – Product labels. – Collections. – Bundles. Tested multiple versions of model – Testing pipeline – RFAs: Earlier tests (0700j): 9; Recent tests (0800k): 10. – Some RFAs "closed" with no action. – ??? How well are RFAs being addressed ??? 3

PDS M/C August 2012 PPI Node Report PDS4 Data Migration Plan Started several years ago… Refactor current archive as single Data Set per Volume. – Split volumes with multiple data sets. – Update to PDS 3.8 compliance. – Validate with Ames Validator tool. Progress:720 volumes => 413 datasets Remaining: 27 PVO data sets, Cassini MAG (peer review) and errors in MEX (fixable by PDS?) Transform PDS 3.8 volume to PDS4 4

PDS M/C August 2012 PPI Node Report PDS4 Rollout Switch current PPI interface from current volumes to new dataset volumes. – Same model as PDS4 Convert and register as PDS4 resources. Integrate PDS4 services as they become available. – Incremental and feature-by-feature. 5

PDS M/C August 2012 PPI Node Report Tools We Use for PDS4 Oxygen – Editing and validation pds.docgen (PPI developed, open source) – Apache Velocity based template processor Saxon Schema and Schematron validation – Command-line (java) 6

PDS M/C August 2012 PPI Node Report Tools we use for PDS3 Ames Volume Validator Note: Large volumes cause problems with validator. Work around: Must divide dataset and check as smaller pieces. Something to consider with PDS4 validator. Lbtool – Validate label Tbtool – Validate label/data structure. 7

PDS M/C August 2012 PPI Node Report PDS4 Tool Development Plans PPI Refine pds.docgen as needed. Create PDS4 harvester for Solr search engine. Schema driven, web based XML editor. (adapted from another project) We need: Data Registry services (EN to develop) Volume verifier (AMES?) tbtool (PPI - ????) Clear protocols (all) 8

PDS M/C August 2012 PPI Node Report First Mission – MAVEN Mission Time Line NOW: SIS development has begun 2013-Nov-18 to 2013-Dec-17: Launch window 2014-Sep-22 or later: Mars Orbital Insertion 2014-Nov: start of science operations (5 weeks after MOI) 2015-Apr: first data delivery (6 months after start of science ops) 9

PDS M/C August 2012 PPI Node Report First Mission - MAVEN Instruments: 4 particle, MAG, Plasma wave. Data types: ASCII tables and binary tables. Forms of binary tables – CDF data to be treated as simple binary tables with a header. – Raw data will be archived as packets. Need bit field support in PDS4 – to be worked. Delivery package – Description of package in SIS template. 10

PDS M/C August 2012 PPI Node Report Summary We are well positioned for a migration of our full archive to PDS4. Things we need in PDS4 (to support MAVEN) – Delivery Package (full and incremental) – Association of Instrument and Instrument_Host. – Bit Fields PDS4 information model issues are resolvable. 11

PDS M/C August 2012 PPI Node Report Backup Slides 12

PDS M/C August 2012 PPI Node Report PDS 2010/PDS 4 Participation Participate in DDWG (Steve, Joe, Debra) – Reviews, discussion, studies, white papers – Unsustainable demands – Participation is impacting archive maintenance and migration activities. Participate in SDWG (Todd) – Reviews, discussions, testing – Manageable demands Advisory and Review (Todd) – Manageable demands (to a point). 13

PDS M/C August 2012 PPI Node Report Missions Active Missions – MESSENGER PPI LeadMature Pipeline M. Sharlow – CassiniMature Pipeline D. Kazden, J. Mafi – MEXMature Pipeline M. Sharlow – LROMature Pipeline M. Sharlow – DawnPeer review J. Mafi – RosettaAssist SBN S. Joy, J. Mafi – JunoSIS's in review J. Mafi – MSLPeer Review M. Sharlow – New HorizonsCruiseS. Joy, J. Mafi Pre-launch Missions – MAVENPPI Lead SIS developmentJ. Mafi, S. Joy Restorations – MGSMature Pipeline M. Sharlow – KaguyaLabels designed M. Sharlow – VoyagerNew data setsJ. Mafi, S. Joy China/Foreign Missions – PDS Standards Seminar All – IPDAS. Joy, T. King 14

PDS M/C August 2012 PPI Node Report Issues by Mission - all manageable - MAVEN – Requires PDS4 support for SIS development and product design Cassini – Multiple re-submissions; some user’s guides and high order data behind schedule, but progressing; Dawn – Data in review – trying to meet PMDAP deadline (9/12/12) MESSENGER – Higher order data sets under review Rosetta – PDS not included in ESA/ESTEC review of data sets Kaguya – Data available online at with minimal PDS labelshttp://darts.jaxa.jp 15