Presentation is loading. Please wait.

Presentation is loading. Please wait.

PDS4 User Beta Testing Mars Phoenix Website Lynn D. V. Neakrase Atmospheres Node Management Council Meeting, UCLA 28-29 November 2012.

Similar presentations


Presentation on theme: "PDS4 User Beta Testing Mars Phoenix Website Lynn D. V. Neakrase Atmospheres Node Management Council Meeting, UCLA 28-29 November 2012."— Presentation transcript:

1 PDS4 User Beta Testing Mars Phoenix Website Lynn D. V. Neakrase Atmospheres Node Management Council Meeting, UCLA 28-29 November 2012

2 Overview Review of the Atmosphere’s Phoenix Holdings Organization of the data for Beta Website Beta Test Worksheet and Scorecard Beta Test Schedule Current Progress 2 Management Council Meeting, UCLA 28-29 November 2012

3 Phoenix Holdings Mars atmospheric data from Phoenix Mars Lander 5 Archive Bundles corresponding to instruments ‣ Meteorology Package (MET) ‣ Light Detection and Ranging (LIDAR) ‣ Atmospheric Structure Experiment (ASE) ‣ Atmospheric Opacity (AO) ‣ Telltale Anemometer (TT) Simple data - Character Tables (raw, reduced, derived) 3 Management Council Meeting, UCLA 28-29 November 2012

4 Organization Website design focused on new look based in part on Cassini User Guide pages “One-Stop Shop” approach for the mission data with links to helpful documents and guides Simple and organized for easy access 4 Management Council Meeting, UCLA 28-29 November 2012

5 5

6 6

7 7 Jim Murphy produced samples of each of the holdings

8 Worksheet & Scorecard For efficient use of our reviewers’ time we’ve designed a worksheet and scorecard for a guided review of the Beta Website The worksheet gives a little background on XML and PDS4 and then asks the reviewer to work through a couple of exercises Reviewer responses are then recorded on the accompanying scorecard that allows ranking of many points along with user comment areas 8 Management Council Meeting, UCLA 28-29 November 2012

9 9

10 Beta Review Schedule ✓ Design/Revise Phoenix Website (Sept-Nov 2012) ✓ Worksheet/Scorecard Design (Oct-Nov 2012) ‣ Internal Node Review of the process (Nov 2012) ‣ Independent Grad Student Review (19-30 Nov) ‣ External Beta Review (Nov 2012-Jan 2013) ‣ Compile Results (Jan 2013) ‣ Revise Web Design (Jan-Feb 2013) 10 Management Council Meeting, UCLA 28-29 November 2012

11 Current Progress ✓ Beebe, Neakrase, Murphy, ATMOS have identified around 25-30 reviewers (personal contacts and DPS recruits) ✓ Instrument Bundles updated to 300a schemas (MET finished, other 4 on the way) ✓ Internal review is underway, one researcher has responded, opened to martian grad students at NMSU ✓ Will contact our Reviewers as soon as the last Instrument Bundles are complete 11 Management Council Meeting, UCLA 28-29 November 2012

12 Questions? Comments? 12 Management Council Meeting, UCLA 28-29 November 2012


Download ppt "PDS4 User Beta Testing Mars Phoenix Website Lynn D. V. Neakrase Atmospheres Node Management Council Meeting, UCLA 28-29 November 2012."

Similar presentations


Ads by Google